Water Supply And Sanitation Department Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Water Supply And Sanitation Department Tender

Metals
Eprocure
Opening Date7 May 2021
Closing Date22 Jul 2021
Tender Amount₹ 10,05,560 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

  • EMD

    ₹ 17,735
  • Document Cost

    ₹ 1,000
  • Tender Fee

    ₹ 1,046

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Bid Document of Water Supply Scheme Manjpur
Tender Notice of Water Supply Scheme Manjpur
Price Sheet of Water Supply Scheme Manjpur
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
50 mm I/d

350

-

-

... More
40 mm I/d

129

-

-

... More
Providing & Fixing C.I. / D.I. Flanged end, stem of SS (AIS 1410) and bronz (Gun Metal) working parts sluice valve ISI marked 14846-2000 including jointing, testing & cost of nut bolt and insertion sheets all carriage complete (with approval of Engineer-in-charge).

-

-

-

... More
80 mm i/d

2

-

-

... More
Cost of Connections wih Existing Pipe line

-

-

-

... More
Bailing out water from the trenches for making new connections in fully charged pipe line including cleaning, trimming and dressing the trenches to correct alignment and grade as required by the Engineer-In-charge.

4

-

-

... More
Making connection with the existing G.I. branch main up to 40mm size pipe including cutting of existing pipe line, threading of pipe lines from both ends and fixing of G.I Tee etc. in the pipe line (including cost of G.I Tee) complete in all respects.

2

-

-

... More
New PVC 90 mm o/d Pipe with existing PVC Pipe 90 mm o/d (As per analysis attached)

2

-

-

... More
Cost of Connection on Existing Pipe Line

-

-

-

... More
Providing proposed water connection to house hold up to wall with providing, laying jointing, testing G.I pipe lines 15mm i/d=2.50 mtr,B-Class as per CSR 28.36 (A), (Above GL),Prov. & Fixing MDPE Pipe 15 mm i/d with specials 2.00 mtr including cost of specials such as tees, bends, sockets, elbow etc. cutting, threading, and testing in trenches in the ground and ISI cock 15mm i/d GM ferrule as per IS: 2692 and 3" i/d clamp with c.i bib cock 15mm i/d as per IS:210 with stainless steel spindle of approved make

140

-

-

... More
Cost of Connection on Proposed Pipe Line

-

-

-

... More
Providing proposed water connection to house hold up to wall with providing, laying jointing, testing G.I pipe lines 15mm i/d=2.50 mtr,B-Class as per CSR 28.36 (A), (Above GL),Prov. & Fixing MDPE Pipe 15 mm i/d with specials 2.00 mtr including cost of specials such as tees, bends, sockets, elbow etc. cutting, threading, and testing in trenches in the ground and ISI cock 15mm i/d GM ferrule as per IS: 2692 and 3" i/d clamp with c.i bib cock 15mm i/d as per IS:210 with stainless steel spindle of approved make

77

-

-

... More
Cost of Connection on Open Pipe Line

-

-

-

... More
Providing proposed water connection to house hold up to wall with providing, laying jointing, testing G.I pipe lines 15mm i/d=2.50 mtr,B-Class (Above GL), including cost of specials such as tees, bends, sockets, elbow etc. cutting, threading, and testing in trenches in the ground and ISI cock 15mm i/d GM ferrule as per IS: 2692 and 3" i/d clamp with c.i bib cock 15mm i/d as per IS:210 with stainless steel spindle of approved make.

35

-

-

... More
COST OF OPERATIONAL & MAINTENACE

-

-

-

... More
O. & M. cost for water supply scheme for Manjpur (4 Nos.) villages for 3 months

1

-

-

... More
Item for which no rate or price has been entered it will not be paid for by the Employer when executed and shall be deemed covered by the rates and prices in the Bill of Quantities.

-

-

-

... More
Unit rates and prices shall be quoted by the bidder in Indian rupee.

-

-

-

... More
Where there is a discrepancy between the rate in figures and words, the rates in words will govern.

-

-

-

... More
Where there is a discrepancy between the unit rate and the line item total resulting from multiplying the unit rate by quantity, the unit rate quoted shall govern.

-

-

-

... More
Any item of work not included in the above contract schedule of rates and got done at the site of work; the same will be paid according to CSR-2010 subject to the premium or discount tendered by the contractor. In the case of non-schedule items, the decision of the Engineer-in-charge will be final and binding upon the contractor. In case any item which is a part of lump-sum rate is not executed at site, the amount of the same shall be deducted @CSR rates + Ceiling premium prevailing on the date of tender.

-

-

-

... More
The work will be carried out in accordance with PWD Book of specifications – 1963 edition with upto date amendments.

-

-

-

... More
Approximate quantities are given in the contract schedule of rates and these can vary at the time of execution of the work. The payment will be made according to the actual work done by the contractor.

-

-

-

... More
All amendments issued on the common schedule of rates 2020. up to the date of opening of tenders will be applicable on the contract schedule of rates.

-

-

-

... More
Contractor should clearly quote his rates in figures & words. Conditional tender will be rejected.

-

-

-

... More
All items and rates provided in the DNIT are subject to in CSR-2020.

-

-

-

... More
The Engineer-in-charge will have full powers to change the layout of the work covered in this contract if considered necessary.

-

-

-

... More
No claim will be entertained from the contractor in case, any mistake in description rates or unit occurs in any item taken in this schedule while preparing this DNIT or on account of typing or comparison or over writing. The same will be rectified at any time as per common schedule of rates 2010 along with up to date amendments.

-

-

-

... More
The arrangement of bricks at site of work would be done by the contractor at his own level from his own source.

-

-

-

... More
For any other non-schedule items, the contractor will submit through Engineer-in-charge, the analysis of rates in triplicate based on purchased vouchers. A margin of 10% shall be allowed for the material components and 21.5% on labour components and contractor shall produce photo stat copies of the purchase vouchers in support of his claim. The decision of the Engineer-in-charge/competent authority in the matter shall be final and binding on the contractor.

-

-

-

... More
All the extra items will be got approved from the competent authority and no premium will be allowed on non schedule items.

-

-

-

... More
Pavement for the carriage of material shall be paid as per the rates quoted by the tenderer.

-

-

-

... More
Time period allowed for completion of work in 2 months 3 O& M Months.

-

-

-

... More
ii)    If contractor failed to start the work within 7 days from the date of allotment, DWSS reserve the right to impose penalty or withdraw the work and propose action for debarring in future tendering or both; decision of Chief Engineer, shall be binding.

-

-

-

... More
Item for which no rate or price has been entered in will not be paid for by the Employer when executed and shall be deemed covered by the other rates and prices in the Bill of Quantities..

-

-

-

... More
We agree to execute the works in accordance with the approved drawings and technical specifications at a total contract price of INR.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.