Punjab State Transmission Corporation Limited Tender
... More
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Punjab State Transmission Corporation Limited - PSTCL Tender
Electrical and Electronics
Electrical Works
Eprocure
Opening Date26 Nov 2024
Closing Date9 Dec 2024
Tender Amount₹ 7,54,988
Costs
EMD
₹ 15,000Document Cost
Refer DocumentsTender Fee
₹ 891
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_POWER_130371_1Bid Award Id
ViewTender No
15/2024-25Tender Authority
Punjab State Transmission Corporation Limited ViewPurchaser Address
-Website
http://http://punjab.gov.in/power
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Termsandconditionsandtechnicalspecification
BOQ Items
... More
Dismantling concrete 1:2:4
19.26
1218
-
... More
Scrapping of bricks
1.83
1410
-
... More
Shuttering for faces of concrete foundation & foundation beams & plinth Beams (vertical or Battering)
14.96
187
-
... More
Centering and shuttering for faces of walls, parititions, retaining walls and the like (vertical or battering) including attached pilasters buttresses, etc.
153.6
361
-
... More
Centering & Shuttering for columns (rect / square or polygonal in plain )
103.26
425
-
... More
Centring & shuttering for flat surfaces like slab etc
20
475
-
... More
Cement concrete 1: 6: 12 with 40 mm stone aggregate
7.2
2292
-
... More
Cement concrete 1: 5: 10 with 40mm stone aggregate
0.6
2286
-
... More
Cement concrete 1: 4: 8 with 40mm stone aggregate
2.59
2271
-
... More
Cement concrete 1: 2: 4 with stone ballast or shingle
6.94
2386
-
... More
RCC M-20 mechanically mixed,vibrated by needle vibrator but excluding steel reinforcement,centering and shuttering in fdn. And plinth
15.8
2762
-
... More
RCC M-25 mechanically mixed,vibrated by needle vibrator but excluding steel reinforcement in super structure
44.59
3420
-
... More
Extra for using needle vibrator where not included in the rates .
3.2
24
-
... More
First class burnt brick work laid in cement sand mortar 1:5 in foundation and plinth
1.8
4078
-
... More
First class burnt brick work laid in cement sand mortar 1:4 in foundation and plinth.
4.47
4081
-
... More
115mm thick brick wall in cement sand mortar 1:4 without reinforcement in foundations and plinth
15
490
-
... More
Conglomerate floor 25mm thick cement concrete topping 1:2:4 using mechanical mixer for mixing of material
8.5
167
-
... More
12.5 m thick Cement plaster 1:3
16
133
-
... More
12.5 mm thick Cement Plaster 1:5
8.1
135
-
... More
Cold twisted deformed (ribbed/ tor steel) Bars, for R.C.C. works, where not included in the complete rate of R.C.C. including bending, binding, and placing in position complete.
52.89
780
-
... More
Brick on end Edging
35
64
-
... More
P&F of 110mmo/d PVC pipe of 4kgf/sqcm for vent
20
279
-
... More
Stacking of gravel
26.01
18
-
... More
Spreading of collected gravel
26.01
130
-
... More
P&F of man hole cover of 0.65x0.65m
1
1086
-
... More
gravel to be spreaded
5.66
1648
-
... More
Disposal of surplus soil excavated from CC/RCC fdsn i/c loading unloadiing & disposal up to 0.5 km - 1.00 km
98.73
109
-
... More
Landing Rate of materials including extra carriage and difference of rates of Coarse Sand
32.43
226
-
... More
Extra carriage of Fine Sand
4.25
112
-
... More
Extra carriage of Cement
26.56
350
-
... More
Extra carriage of Steel
5.29
260
-
... More
Landing Rate of materials including extra carriage and difference of rates of Bricks
3838
-
-
... More
Landing Rate of materials including extra carriage and difference of rates of Crushed bajri12/13.2mm
28.88
333
-
... More
Landing Rate of materials including extra carriage and difference of rates of Crushed bajri10/11.2mm
28.88
307
-
... More
Landing Rate of materials including extra carriage and difference of rates of S.Metal
10.21
392
-
... More
Fixing of templates along with fdn. Bolts as per drawing
40
200
-
... More
S/H/Placiing of Ferro-cement trench cover,frame of size given below made of MS flat 50 x 3 mm with 6 mm dia bars at 4.5" & 9' welded to flat with lifting hooks as per Drg.No CW/DS-2537-R/5 & CE /DS-2420-R/3 complete Trench-T-4 Size 2'-6" x 1'-9"
32.5
649
-
... More
P&F of various size cable racks 40x40x6
36.75
69
-
... More
P&F 3BHP centrifugal non clog pump
1
31497
-
... More
Recovery of Bricks
1832
5
-
... More
Recovery of Brick bats
1.91
499
-