Punjab State Transmission Corporation Limited Tender
... More
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Punjab State Transmission Corporation Limited - PSTCL Tender
Eprocure
Opening Date12 Dec 2018
Closing Date18 Jan 2019
Tender Amount₹ 23,50,000
Costs
EMD
₹ 47,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_POWER_23928_1Bid Award Id
ViewTender No
16/2018-19Tender Authority
Punjab State Transmission Corporation Limited ViewPurchaser Address
-Website
http://http://www.pstcl.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Centring and shuttering for columns (Square or rectangular or poly gonal in plain)
344.59
-
242.01
... More
Cement Concrete 1:8:16 with 40 mm gauge stone aggregate using concrete mixer volumetric type
8.58
-
1181.04
... More
Cement Concrete 1:6:12 with 40 mm gauge stone aggregate using concrete mixer volumetric type
20.2
-
1200.44
... More
Cement Concrete 1:5:10 with 40 mm gauge stone aggregate using concrete mixer volumetric type
5.67
-
1216.46
... More
Cement Concrete 1:4:8 with 40 mm gauge stone aggregate using concrete mixer volumetric type
88.83
-
1248.19
... More
Cement Concrete 1:2:4 using stone ballast or shingle volumetric type
23.82
-
1339.44
... More
Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixeras per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement excluding steel reinforcement centering and shuttering in foundation and plinth
198.95
-
1949.4
... More
Extra for using vibrator where not included in rates
22.25
-
26.845
... More
First Class burnt brick work 1:6 laid in cement sand mortar in foundation and plinth
4.38
-
3183.98
... More
115 mm thick brick wall laid in cement sand mortar 1:4 without reinforcement in foundation and plinth
60.8
-
415.96
... More
Conglomerate floor 25 mm thick cemnt concrete topping 1:2:4 (using mechanical mixer for mixing of material)
24
-
47.41
... More
Conglomerate floor 50 mm thick cemnt concrete topping 1:2:4 (using mechanical mixer for mixing of material)
261.07
-
70.25
... More
12.5 mm thick CP 1:3
84.8
-
82.06
... More
20 mm thick CP 1:4 in 2 coat work
44
-
101.16
... More
Steel Work Fixed independently without connecting plates, including cutting, hoisting and fixing in position
(MS Rail @ 44.64 kg/m) (Through Rate)
9.91
-
4737.01
... More
Cold Twisted Deformed (Ribbed/ TOR Steel Bar) bars Fe 500 grade as per IS 1786-1985, for RCC works,where not included in complete rate of RCC including bending and placing in position complete (Labour Rate)
89.04
-
537.345
... More
Compacting original ground below road crust
Loosening, leveling and compacting original ground up to a level of 500mm below road crust, mixed with water at OMC, levelled, graded and compacted in layers by rolling so as to achieve minimum dry density as given in Table 300-2 for sub grade construction as per technical clause 305 of MORT&H specifications
266.48
-
60.41
... More
Proiding, laying, spreading and compacting stone aggregates of Grading II to water bound macadam specification including spreading in uniform thickness, hand picking, rolling with smooth wheeled roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical 404 of MORT&H specifications
266.48
-
1222.61
... More
Providing and fixing of various sizes of cable racks
228.96
-
69
... More
Providing and Fixing angle Iron Nozing 50x50x3 mm angle iron for cable trenches
40
-
156
... More
Supplying and Hoisting of Ferocement Trench Covers of size 2'8"x1'6"
45
-
582
... More
Supplying and Hoisting of Ferocement Trench Covers of size 2'6"x1'9"
104
-
649
... More
P&F Base Plate 235x220x12mm for T/F Plinth
27
-
364
... More
MS Cleat 65x65x6 mm-19 mm for T/F Plinth
106
-
35
... More
Fixing of Tempelates
84
-
200
... More
Providing and Fixing Angle Iron Nozing made out of 50x50x6 angle iron for T/F Plinth
22.2
-
306
... More
Spreading of Crusher stone 20 mm size in the yard area in 75 mm thick layer including preparation of surface complete as per the satisfaction of Engineer-in-charge
59.7
-
1373.35
... More
Disposal of surplus soil outside the yard area
409.96
-
114.14
... More
Extra carriage of material FOR CEMENT
101.25
-
343.54
... More
Extra carriage of material FOR F.SAND
64.96
-
276.56
... More
Extra carriage of material FOR C.SAND, CRUSHER, BALLAST AND STONE METAL
691.13
-
370.51
... More
Extra carriage of material FOR STEEL
8.9
-
259.45
... More
Extra carriage of material FOR BRICKS
5459
-
0.295
... More
Difference of rate of material for coarse sand
102.41
-
43.8
... More
Difference of rate of material for crusher (12/13.2)
101.42
-
154.17
... More
Difference of rate of material for crusher (10/11.2)
101.42
-
169.19
... More
Difference of rate of material for stone ballast
119.4
-
103.04
... More
Difference of rate of materials for bricks
5459
-
0.377
... More
Difference of rate of materials for stone metal
266.48
-
191.65
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements