Punjab State Power Corporation Limited Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Punjab State Power Corporation Limited - PSPCL Tender

Civil And Construction
Drainage Work
Eprocure
Opening Date10 Feb 2023
Closing Date18 Jul 2023
Tender Amount₹ 27,47,868 
Notes
Download

Costs

Summary

Prevention Of Leakage By Cement Pressure Grouting

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling of damaged cement concrete lining "B" and "A" slabs (for Hydraulic work). It includes cost of all tools and plants required for dismantling and also the disposal of dismantled material at disposal site complete as per directions of Engineer in charge and as per site requirement. CSR Item 8.6-(d).

39.38

79207

2011.61

... More
Earth work containing Gravel (40-60%) work in excavation with occasional use of picks exclusive of compensation of earth for excavation random fill zone(pervious zone) for locating leakage path from bank.It include disposal of excavated material at disposal site up to distance of 200M complete in all respect as per directions of engineer in charge.

200

68526

342.63

... More
Laying random material for filling pervious zone. It includes carriage of random material from spoils at RD +/- 6500 M to site of work complete as per directions of Engineer in charge and as per site requirements.

144

57380

398.47

... More
Dressing side slopes and preparation of sub grade for lining of MHC-I in earth work with admixture of shingle or kankar up to 40% complete as per direction of Engineer in charge and as per site requirement.CSR item No. 19.4 (a)

465

12732

27.38

... More
Laying graded filter material 150mm thick in two layers i.e.1st layer 75mm thick filter size up to 2.4 mm and 2nd layer 75 mm thick filter size 2.4 mm to 40mm. It includes supply and carriage of filter material from Mirthal to site of work including all taxes,royalty etc.Complete as per site requirement & as per directions of Engineer-In charge.

22.5

22533

1001.46

... More
Providing and placing cement concrete 1:2:4 computerised batch mixed 125mm thick on side slopes of CC Lining "C" Slabs. It includes cost of sand, shingle and cost of mixing charges. It also includes cost of carriage of concrete from plant to site of work. The cement shall be supplied by the Deptt. Free of cost, but the carriage of cement from Deptt. Store UnchiBassi to plant will be done by the contractor complete in all respect as per site requirement and as per directions of Engineer in charge.The rates including cost of water, curing protecting bad weather conditions.

18.75

76962

4104.65

... More
Providing and placing cement concrete 1:2:4 computerised batch mixed 125mm thick on side slopes of CC Lining "B" Slabs. It includes cost of sand, shingle and cost of mixing charges. It also includes cost of carriage of concrete from plant to site of work. The cement shall be supplied by the Deptt. Free of cost, but the carriage of cement from Deptt. Store UnchiBassi to plant will be done by the contractor complete in all respect as per site requirement and as per directions of Engineer in charge.The rates including cost of water, curing protecting bad weather conditions.

19.69

83896

4261.26

... More
Providing and placing cement concrete 1:2:4 computerised batch mixed 125mm thick on side slopes of CC Lining "A" Slabs. It includes cost of sand, shingle and cost of mixing charges. It also includes cost of carriage of concrete from plant to site of work. The cement shall be supplied by the Deptt. Free of cost, but the carriage of cement from Deptt. Store UnchiBassi to plant will be done by the contractor complete in all respect as per site requirement and as per directions of Engineer in charge.The rates including cost of water, curing protecting bad weather conditions.

19.69

86979

4417.87

... More
Providing and placing cement concrete 1:2:4 computerised batch mixed 100mm thick for coping of CC Lining. It includes cost of sand, shingle and cost of mixing charges. It also includes cost of carriage of concrete from plant to site of work. The cement shall be supplied by the Deptt. Free of cost, but the carriage of cement from Deptt. Store UnchiBassi to plant will be done by the contractor complete in all respect as per site requirement and as per directions of Engineer in charge.The rates including cost of water, curing protecting in bad weather conditions.

3.38

12724

3769.94

... More
Laying boulder masonry in 1:4 cement sand motor for restoring parapet wall on top of CC Lining. It includes S&C/o boulder size not less than 150mm from Madhopur to site of Work @ 20% of the total required quantity and also includes cost of S&C/o coarse sand from Mirthal to site of work. The cement shall be supplied by the Deptt. free of cost, but the carriage of cement from Deptt. Store UnchiBassi to site of work will be done by the contractor. Complete in all respect as per site requirement and as per directions of Engineer in charge.

19.69

54806

2783.73

... More
Providing and placing cement concrete 1:2:4 hand mixed 50mm thick for coping of Boulder masonry. It includes cost of sand, shingle and cost of mixing charges. It also includes cost of carriage of material from mirthal to site of work. The cement shall be supplied by the Deptt. Free of cost, but the carriage of cement from Deptt. Store UnchiBassi to site of work will be done by the contractor complete in all respect as per site requirement and as per directions of Engineer in charge.The rates including cost of water, curing protecting in bad weather conditions.

0.84

2132

2526.34

... More
Laying coarse sand grouting at leakage point at RD3204,3670,3800,4686 and 5400M of MHC. It includes supply and carriage of coarse sand from Mirthal to site of work. It also includes all T&P and labour required for executing the job. Complete in all respect as per directions of Engineer-In-Charge and as per site requirements

250

414668

1658.67

... More
Making a ring bundh in bed of the channel with empty cement bags filled with sand and placing/laying in position within 30M and subsequent removal after completion of work. It includes cost of EC bags, sand, sewing’s and strings. Complete in all respect as per directions of Engineer in-charge.

1923.08

106500

55.38

... More
Supply of bentonite clay powder wherever required to site of work at R/side RD 3204-M, 3670-M, 3800-M 4686-M, 5400-M of MHC-

25000

125000

5

... More
Supply man day required for the work of cement pressure grouting. It is proposed that 10 No. unskilled worker are required in one shift for sieving and lay / pouring cement for grouting. So that the unskilled worker are required in two shift = 2x10x15 = 300 Man days.

300

125859

419.53

... More
Hire charges of air compressor 500 Cfm capacity. It includes of all operational i.e. cost of fuel, lubricant operation carriage of the same at site of work. up & down. Complete in all respect as per directions of Engineer in charge.

240

600000

2500

... More
Hire charges of two Nos. water pump 1 HP for water supply arrangement for grouting unit.

30

12000

400

... More
Hire charges of diesel generator for area lightning arrangement at RD 3204, 3670, 4686 &5400M of MHC-I. It includes of all operational i.e. cost of fuel, lubricant operation carriage of the same at site of work. up & down. Complete in all respect as per directions of Engineer in charge.

15

37500

2500

... More
Carriage of cement bags from Deptt. Store Unchi Bassi to site of work At RD 3204, 3670, 3800, 4686 &5400 M R/Side of MHC-I

5141

42979

8.36

... More
Supply of bostic compound 20 Kg. per bag packing

20

35200

1760

... More
Supply of bostic primer

20

3800

190

... More
Supply GI nipple 2’ long 1” dia.

120

24000

200

... More
Supply GI nipple 4’ long 1” dia.

120

46800

390

... More
Supply GI nipple 10’ long 1” dia.

60

51000

850

... More
Supply of lead wool.

60

13200

220

... More
Supply of rubber hose pipe ¼” di(10M Roll)

4

2800

700

... More
Cotton waste

60

2400

40

... More
Manila rope

120

21600

180

... More
Nylon rope

12

2820

235

... More
Mulbary Basket

35

2100

60

... More
Plastic tarpal

30

4200

140

... More
Ordinary paint

5

975

195

... More
Painting Brush (4")

5

1000

200

... More
LED Lamp 45 watt

10

9200

920

... More
PVC cable two core 6mm (90 M Roll) Aluminum.

1

2300

2300

... More
PVC wire 7/22 Copper (90M Roll)

1

2850

2850

... More
Shade for 500 Watt lamp

2

1480

740

... More
Halogen light 500 Watt Complete

2

2390

1195

... More
PVC wire 4mm single core(90M Roll)

1

4400

4400

... More
Lamp 500 Watt

10

1200

120

... More
PVC tape

3

30

10

... More
Fibre Board Expansion Joints Providing and fixing 20 mm thick compressible fibre board in expansion joints complete as per drawings and technical clause 2605 of MORT&H specifications. CSR Ref. 24.61(a)

291.6

12463

42.74

... More
Filling of sealing compound in 20mm wide and 15mm deep joints of side lining of MHC-I. It includes the cost of sealing compound confirming to I.S. code No. 1834/1984 & cost of material labour and fuel etc. required for executing the job. Complete in all respect as per Deptt. Design and P.W.D. specification and as per direction of Engineer in charge.

291.6

14020

48.08



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.