If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Costs
EMD
₹ 1,63,842Document Cost
₹ 5,000Tender Fee
₹ 5,900
Summary
Providing Ring Main System For Emergency Electrical Backup Rajindra Hospital Patiala Phase I
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEPW_128544_1Bid Award Id
ViewTender No
Tender Notice No 14 Dated 08.10.2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwdpunjab.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
S/E of Heat shrinkable cable end termination/ Straight through joint kit for 11 KVA /6.6 KV (E) XLPE Cables as approved & desired by Enginer in charge:-
Heat Shrinkable End Termination for cable size 240-400 sq. mm, 3Core (Outdoor Type)
16
87573
5473.35
DOUBLE WALLED CORRUGATED (DWC) HDPE PIPES:
Supply and erection of Double Walled Corrugated (DWC) HDPE pipe to be laid 1mtr. below ground level including excavation placing the pipe in position and back filling with excavated soil etc. of the required size:-
Double Walled Corrugated HDPE Pipe 120/ 103.5mm (Outer/ Inner dia.)
204
59317
290.77
MS CHANNELS/ FLATS:
Supply and Erection of MS angle iron (Channel)/ MS Flats of suitable size with cutting, bending and necessary holes as desired by Engineer-in-charge at site:-
MS angle iron size 100mm x 50mm x 6mm thick
100
63589
635.89
Supply and erection of heavy duty brass single compression gland for cable end termination duly complete with checknuts etc. including making necessary connections:-
Brass Gland for Aluminium cable 3/3½/4 Core size 240sq.mm
16
7200
450.06
Supply stringing and sagging of aluminium conductor steel reinforced (ACSR) on poles including binding with insulators using aluminium wires complete as desired by the Engineer in charge of the site:-
ACSR-WEASEL conductor (30 sq. mm)
Size (6/2.55 Al.+1/2.55mm GI)
1000
37080
37.08
PCC POLES:
Supply and erection of pre-stressed cement concrete pole of suitable length with a given planting depth confirming to IS-1678/ 1960/1978 below ground level in excavated pit of suitable dimensions complete in all respect as approved by Engineer-in-charge at site:-
PCC Pole Overall Length 11 metre, Planting depth 1.80 metre, W/L 400 kg
20
180832
9041.61
CABLE TRAY:
Supply and erection of MS perforated cable tray (MS Sheet thickness 2mm) with DA gray paint on the existing surface with the help of MS angle iron support (to be painted with approved paint) of size 50mm x 50mm x 6mm thick to be fixed with fastners/ nut & bolts etc., complete in all respect as desired by the Engineer-in-charge and as per PWD General Specifications:-
Cable Tray Size 450mm x 50mm x 50mm (2mm thick)
100
190262
1902.62
Earthing earth rod 20 mm dia for providing earth connections upto line earth with G.I. Wire 8 S.W.G. (4mm dia.). The rod shall be tapered at one end and flatted on other end. The hole size 10mm dia shall be drilled on the flatened side for facilitating connection with G.I. wire and thimble etc. The rod shall be erected in ground upto complete length vertically:-
GI Earth rod 20 mm dia., 3 mtr. Long
20
25494
1274.74
Cement concrete 1:2:4
With stone ballast or shingle
mixing by manual means
20
96163
4808.17
Providing and fixing Wooden Arrangement for fixing of 11kv HT cable on 11 meter PCC poles including priming coat .complete in all respect . CSR Based
40
30762
769.06
Nuts & Bolts of all sizes and length required
100
8217
82.17
Excavation of trenches in a Streets, Lanes or in Open Area for Storm Sewers and Manholes to Full Depths as Shown in Drawings,excluding Shoring, Timbering of Poling Board Frame System Type, dressing to correct sections and dewatering, provision for diversion for traffic, protection of existing services i.e. telephone cables ,electric lines,water supply lines and gas lines.night signals, profiles, Pegs, Sight rails, boning rods, crossing over trenches for access to the houses, watching, fencing etc., fixing and maintenance of caution boards, refilling trenches, watering of refill in 15 cm layers, ramming and restoration of surface to original conditions and removal of Surplus Spoil from the Site of Works, for all Works other than connections to Ventilating Shafts upto a Lead of 15 mtr
For depth not exceeding 2 m. below Ground level
All classes of soil except rocky
20
4719
235.98
Construction of brick masonry inspection chambers size as given below upto 0.60 metre average depth in 1:5 cement sand mortar, CC 1:48 ( 150mm thick) in foundation, cement concrete 1:2:4 benching 12.50mm thick cement plaster 12 with a floating coat of 1mm thick of neat cement, R.CC. 124 slabs 100mm thick cement Concrete topping 50mm thick with 455mm x 455mm, 455mm x 610mm inside R.Cc inspection chamber cover and frame (Weight as per I.S.I specifications) painted with |3 coats of black bitumastic paint conforming to 1.S.I complete as per standard design.
600mm x 900mm inside with 455mm x 455mm cover and frame light duty double| seal
8
114477
14309.69
Crane 3 tonnes
120
45650
380.42
HT & LT LINE ITEMS:
Supply & erection of 'D' iron clamp 50mm x 6mm flat iron complete with fixing bolts and nuts (16mm x 200mm) including making holes in the pole as approved by Engineer-in-charge.
40
7888
197.22
COPPER EARTHING (Upto 14 metre in Length):
Earthing with electrolytic Copper Tape rivetted (with 5Nos. copper rivets)/Steel Nut & bolts (with 4Nos. 32mm long, 8mm thick with washer and double nut) to 30cm x 120cm x 2mm thick copper plate (made cylindrical) burried 10.50 metre (34.44 feet) below ground level in the hole of excavation having bore dia. 125mm and surrounded by salt & charcoal dust mixture (20 kg.) including fixing the Copper Tape recessed in wall and in floor etc., up to 14metre in Length (including bore Length). G.I. pipe 20mm dia. (A-class), 9metre long should be laid in the hole of excavation 1 feet below ground level and having GI Reducer 50mm x 20mm with PVC Cap (For pouring water) fixed on the top level of the pipe. 300mm x 300mm x 300mm deep haudi of First class bricks finished with 1:4 cement plaster and haudi covered with cast iron lid having size 300mm x 300mm (Heavy) around the hole of excavation:-
Earthing with 25mm x 5mm Copper Tape (upto 14Metre in Length)
8
207819
25977.41
COPPER EARTHING STRIP (As Additional Length):Fixing additional Length of earthing with Copper Tape (On Surface/Flushed) with petty material as required etc.:-
Additional Length 25mm x 5mm thick Copper Tape
80
83184
1039.8
SITC of non-extendable outdoor Ring Main Unit of 630 A/800A , 4 way ( 3Load breaker Switch+1 VCB) non-motorised and manual LBS and VCB with mechanical interlocks to avoid unsafe operation as per site requirment..
RMU must have following specifications.
Relays- 3 Overcurrent & Earth fault protection with display & self power supply
Metal Enclosed switchgear: IEC 60298, General Purpose switches: IEC 60265, Disconnectors and Earthing switches: IEC 60129,Switch Fuse Combination: IEC 60420,Circuit Breakers: IEC 60056,Common clauses: IEC 60694
Pressure of SF6 gas: 1.3 bar at 20 degree C( absolute) or 0.3 Bar relative , Cable bushings: DIN 47636, Temperature class: -25 C indoor, Degree of protection:- SF6 tank: IP 67, main enclouser IP 54 or more
Busbars: EC grade Cu , Rated current busbars: 630 A/800A, Rated current cable switch disconnector : 630 A/800A
Short time withstand current (3 sec) cable switch disconnector : more than or equal to 21 kA
Short time withstand current (3 sec) vacuum circuit breaker: more than or equal to 21 kA
1 V: Vacuum circuit breaker 12kV, 630A/800A , 21kA or more for 3 sec, Triple pole Vacuum Circuit Breaker, with independent Non Motorised mechanism and fully rated earth switch, with provision for earth of the cable. Earthing of the outgoing cable is achieved by the use of CB in series with the off- load disconnector /selector switch. This enhances the making capacity of the earth switch. 1 no. set of Protection CT 100-50/1 A, 2.5 VA, 5P10, Low energy tripping coil for tripping the CB in gault condition
1- Air insulated cable boxes for bottom entry of single run of 3-core cable up to 300sq. mm. 1- Over current & Earth Fault Relay with digital display & Self Powered. Complete in all respects as desired by engineer incharge.
4
3394264
848566
Servicing & testing of 11 KV VCB . The following procedure done at site by engineer:- a) Checking of panel LV compartment: Check if protection relays and annunciators have operated. Reset the record if required. Secondary wiring and fuses. Fuses should be tested for continuity and inspected for signs of deterioration.
Auxiliary switches, indicating devices and interlocks Auxiliary switches should be kept in a clean and operational condition.
b) Check on metal parts: The degree of rusting and peeling of paint surfaces.
c) Noise Identification: Check for any abnormal sound from components, control and potential transformers or the panel.
d) Space Heater: The operation of all heaters, where fitted should be verified, new heater should be provided where needed
e) Main and Earth busbars connections: Ensure that all connections are tight, and that good contact is maintained. This examination should include opening the boots for torque checks on the busbar bolt joints. Peeling or discoloration of insulation sleeves may be an indication of overheating.
f) Shutters:The shutter mechanisms should be verified for correct operation.
g) Isolating contacts: The isolating contacts should be examined for discoloration and deformation.
h) Earthing switches (if any): Earthing switches should be examined for correct operation.
i) Current transformers (CT) and voltage transformers (VT):
Steps should be taken to ensure that voltage transformers are isolated and discharged to earth before commencing of work. For CT Any connections removed for checking/testing after completion of testing, must be correctly refitted.
j) checking of IR value of Main Bus bar and put varnish as needed after proper cleaning and drying.
other things as required on site and desired by engineer in charge.
14
325836
23274
Servicing & testing of Air Circuit Breaker upto 2500 Amps,. The following procedure done at site by engineer:- Cleaning of breaker with CRC-2-26 Removal of old grease and re-greasing the same with recommended grease.
Check condition of arcing contact and gap between fixed and moving arcing contacts shall be checked.
Checking the reset mechanism, tripping of breaker through push button
Checking tripping of ACB through protection release
Tripping of ACB manually through volt metric release.
Checking presence and proper tightening of hardware.
Checking presence of all circlips
Checking condition and alignment of jaw contact with cradle terminals
Checking condition of ACB wiring Checking proper closing of all poles together
Checking working of anti-pumping device in case of EDO ACB
Checking alignment of SIC and its operation
Checking condition of arc chutes
Checking ACB tripping through shunt release
Checking motor operation in case of EDO ACB
Checking closing coil operation in case of EDO ACB
Checking continuity and proper changeover of aux contact block
Checking of release by secondary injection for 0/L, S/C, E/F
Setting of release as per the load
Checking the healthiness of CT's
The spare parts, accessories would have to be provided by customer.
Complete in all respect as desired by engineer in charge of the work.
20
143000
7150
Supply of Maintenance kit ACB . The following procedure done at site by engineer:- ACB maintenance kit consisting of all the essential consumables like Greases, Cleaning spray, Dusters,
Scrubber and Hardware required to carry out the correct maintenance of ACB (Any defective spares parts of ACB to be provided by Customer) including cleaning agents (petrol) charges with to and fro charges. Complete in all respect as desired by engineer in charge of the work.
10
23600
2360