Public Works Department Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Public Works Department - PWD Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date4 May 2020
Closing Date15 May 2020
Tender AmountRefer Documents
Costs
EMD
₹ 1,56,854Document Cost
₹ 5,000Tender Fee
₹ 5,900
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_CEPW_47369_1Bid Award Id
ViewTender No
01/ 2 Dated 01.05.2020Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwdpunjab.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and applying primer coat with bitumen Emulsion S.S on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.85kg/sqm complete as per technical clause 502 of MORT&H specifications
3712.5
-
24.49
... More
Providing and applying tack coat with bitumen using emulsion R.S pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface/granular surface treated with prime coat after cleaning the surface complete as per technical clause 503 of MORT&H specifications
11000
-
8.39
... More
Providing and laying Dense graded bituminous macadam (Grade-II) 50mm to 75mm thick with contniuous type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.50%, carriage of mixed material to site of work, laying with paver finisher mechanical to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 505 of MORT&H specifications
NOTES:-
(i) Job mix formula for the dense bituminous macadam shall be provided by the agency and shall be got approved from Punjab PWD, B&R Research Laboratory Patiala before adoption at site for execution.
(ii) The specification of this item for analytic purpose is kept with bitumen content @ 4.50% weight of mix variation as compared with job mix formula shall be paid/ deducted accordingly. The limits of variation shall be worked out with the approved formula.
TECHNICAL NOTE:-
I.) Apart from the conformity with the grading and quantity requirement of individual ingredients exhibited above the mix aggregate i.e. coarse and fine aggregate for dense bituminous concrete shall meet all requirements set forth clause 505 of MORT&H specifications.
II.) The final grading for the aggregates required for dense bituminous macadam confirming to table 500.10 of MORT&H specifications shall be determined after getting the dense bituminous macadam designed from Punjab PWD, B&R Research Laboratory Patiala after obtaining 60% of material. The design mix so finally approved shall be termed as the approved mix. The aggregates shall be hydrophobic and of low porosity. The aggregates shall satisfy the physical requirement set forth in table 500-6 (addendum to latest revision).
III.) The approved mix shall exhibit the following details source and location of all material:-
(a) Binder expressed as percentage by weight of total mix.
(b) Course expressed as percentage by weight of total mix.
(c) Crushed bajri expressed as percentage by weight of total mix.
(d) Fine aggregate expressed as percentage by weight of total mix.
(e) A single definite percentage passing each sieve for mixed aggregates.
(f) Density of dense bituminous macadam after compaction will be not less than 2.30 gm/CC
275
-
7632.08
... More
Providing and laying bituminous concrete (Grade-II) 30mm-45mm thick with continuous hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5.4%, carriage of mixed material to site of work, laying with paver finisher mechanical to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of MORT&H specifications
NOTES:- (i) Job mix formula for the bituminous concrete shall be provided by the agency and shall be got approved from Punjab PWD, B&R Research laboratory Patiala before adoption at site for execution.
(ii) The specifications of this item for analytic purpose is kept with bitumen content @ 5.4% weight of mix variation as compared with job mix formula shall be paid/ deducted accordingly. The limits of variations shall be worked out with the approved formula.
TECHNICAL NOTE:- i.) Apart from the conformity with the grading and quantity requirement of individual ingredients exhibited above the mix aggregate i.e. coarse and fine aggregate for bituminous concrete shall meet all requirements set forth clause 507 of MORT&H specifications.
ii.) The final grading for the aggregates required for bituminous concrete confirming to table 500.17 of MORT&H specifications shall be determined after getting the bituminous concrete designed from Punjab PWD, B&R Research Laboratory Patiala after obtaining 60% of material. The design mix so finally approved shall be termed as the approved mix. The aggregates shall be hydrophobic and of low porosity. The aggregates shall satisfy the physical requirement set forth in table 500-6 (addendum to latest revision).
iii.) The approved mix shall exhibit the following details, source and location of all material:- (a) Binder expressed as percentage by weight of total mix.
(b) Course expressed as percentage by weight of total mix.
(c) Crushed bajri expressed as percentage by weight of total mix.
(d) Fine aggregate expressed as percentage by weight of total mix.
(e) A single definite percentage passing each sieve for mixed aggregates
(f) Density of bituminous concrete after compaction will be not less than 2.35 gm/CC.
165
-
8515.87
... More
Construction of Side Drain as per design provided by Engineer-in-Charge complete in all respect as per PWD Specification
678
-
1463
... More
Videography/Photography of Road before start of work, during execution and after completion as per direction of Engineer in Charge.
1
-
1000
... More
Heritage & Culture Cess @ 1.00%
7348094
-
0.01
... More
Routine Maintenance of construction work as periodicity to routine maintenance mentioned in the technical specification (For 2nd Year)
1
-
54544.43
... More
Routine Maintenance of construction work as periodicity to routine maintenance mentioned in the technical specification (For 3rd Year)
1
-
79627.13
... More
Routine Maintenance of construction work as periodicity to routine maintenance mentioned in the technical specification (For 4th Year)
1
-
126923.32
... More
Routine Maintenance of construction work as periodicity to routine maintenance mentioned in the technical specification (For 5th Year)
1
-
160020.61
... More
kk
1
-
1
... More
Total Construction Work (Quoted Amount) + Maintenance cost
1
-
1
... More
Total amount of Construction Work (In Figures)&( In Words)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements