Panjab University Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Panjab University - PU Tender
Machinery and Tools
Eprocure
Opening Date9 Mar 2023
Closing Date5 Apr 2023
Tender Amount₹ 14,90,000
Costs
EMD
₹ 29,800Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_PU_72220_1Bid Award Id
ViewTender No
122-32/STTender Authority
Panjab University ViewPurchaser Address
-Website
http://http://puchd.ac.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Speed: 1.25 MPS
-
-
-
... More
Travel in Metres: 11 MTS, Approx.
-
-
-
... More
Stops-Openings: G.F to 3rd Floor (4 Stops 4 Openings) All Opening on same side
-
-
-
... More
Power Supply:3 Phase AC-400 Volts +/-10% Variation, 50 Hz =+/-5% Variation
-
-
-
... More
Operation: Simplex full Collective with or without attendant
-
-
-
... More
Machine Location: Meta 100 MRL - Gearless machine loacated in the shaft on top of the guiderails
-
-
-
... More
Controller:V3F Microprocessor Based Simplex Selective Collective Control system (location Door Column at Top Floor)
-
-
-
... More
Communication: Loop Type Serial Communication
-
-
-
... More
Ropes: Flat Polyurethane-Coated Belts.
-
-
-
... More
Cab Finish: Stainless Steel in Honeycomb Finish 1.5mm, Rear side Handrails in Car and Granite Flooring
-
-
-
... More
Cab Ventilation: Air Fan at ceiling
-
-
-
... More
Hoist way Required: 1900MM (W) x 1900MM (D) (Pit size will be checked by the firm at site and will be accounted for accordingly while quoted the rate).
-
-
-
... More
Pit depth Required: 1600 MM
-
-
-
... More
Overhead : 4200 MM
-
-
-
... More
Car Size: As per Amend No. 1 to IS 14665 (Part 3/Sec 1) 2000 (1100mm W X 1300 mm D X 2200 mm H)
-
-
-
... More
Hoist way Entrance : Protected by centre opening sliding stainless steel doors honeycomb finish, thickness of sheet 1.5mm minimum.
-
-
-
... More
Car Entrance : Protected by centre opening sliding stainless steel doors honeycomb finish, thickness of sheet 1.5mm minimum.
-
-
-
... More
Entrance Size: 800 MM (W) x 2000 MM (H)
-
-
-
... More
Door Operator: AC/DC Door Operator
-
-
-
... More
Door Operation: Automatic D.C Power/ A.C. V3F door operation with adjustable door opening & closing timing.
-
-
-
... More
Leveling accuracy: +/- 5 mm independent of load in the car.
-
-
-
... More
Entrance Protection System: High Performance Contract Free Infra Red curtain - 2 Dimensional
-
-
-
... More
Guide rails: Tounge & Groove Guide rails
-
-
-
... More
Human Interface Device (HID): 1. Adjustable Guide shoes
-
-
-
... More
2. 2 phase Fireman Drive.
-
-
-
... More
3. Digital Direction and position indicators in car at all landings.
-
-
-
... More
4. Floor annuncetor with music.
-
-
-
... More
5. Full Car operating panel.
-
-
-
... More
6. Micro Movement L.E.D. based Buttons.
-
-
-
... More
7. Hands Free Press and Speak intercom (2way intercom-press & speack).
-
-
-
... More
8. Load Weighing Device with Overload By - pass Feature, overload warning with annunciator.
-
-
-
... More
9. Stainless steel Hand rail on rear side.
-
-
-
... More
10. Stainless False Ceiling in Plain Finish.
-
-
-
... More
11. Steel items such as Machine Beams, Door frames sill Angles, fascia Plates, Sill Angle/ Sill Support, Spring Buffers as per I.S.
-
-
-
... More
12. Car Platform constructed out of Cold Rolled Grain Oriented Formed Sheets of Steel.
-
-
-
... More
13. Voltage stabilizer for control system.
-
-
-
... More
14. Phase failure detection.
-
-
-
... More
15. Correction drive.
-
-
-
... More
16. Granite flooring
-
-
-
... More
17. 1 hour fire rated door.
-
-
-
... More
18. Fire Man Switch
-
-
-
... More
19. Motor tested for 180 starts per hour.
-
-
-
... More
20. Provision of Brail signage's and Auditory signals.
-
-
-
... More
21. Automatic rescue device to automatically bring the Elevator to a landing in case of power or controller failure provided with sealed Mtc. Free Batteries of suitable rating for 7 operations of ARD in a day with duration of 30 min. The batteries shall be of reputed make (Exide/Standard).
-
-
-
... More
22. Emergency alarm & Light (Concealed) with re-chargeable battery.
-
-
-
... More
23. Audio signal in case of emergency stop/any interruption should be provided in the lift car.
-
-
-
... More
24. Auto light & Fan off.
-
-
-
... More
25. DOT matrix LED D & P indicators in Car & landings- orange color.
-
-
-
... More
26. Push Button-Orange LED illumination.
-
-
-
... More
Installation & Commissioning : Additional car gate lock to prevent the car door to be opened from inside the car in case is not at floor level
-
-
-
... More
Civil Work: The Job includes installations, testing, commissioning as required to complete the work in all respect including cost of all material, T&P, Carriage & Labour etc. The hook required to hang the lift room will be arranged & install by the firm itself.
-
-
-
... More
Standard & Rules. : The firm shall provide scaffolding, M.S. Joint/ Channels, Pit ladders and minor Civil works etc. as required at no extra payment. Lift License of firm
-
-
-
... More
The Complete lifts including testing, Commissioning and safety provisions shall confirm to various Indian standard and rules with up to date amendments as mentioned below:-
-
-
-
... More
• IS 14665 (Part 1 to 3); 2000
-
-
-
... More
• IS 14665 (Part 5); 1999
-
-
-
... More
• IS 4591 = 1968
-
-
-
... More
• IS 1735 = 1975
-
-
-
... More
• Bombay lifts Act.
-
-
-
... More
• Indian Electricity Rules 1956
1
1490000
1490000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements