Panjab University Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Panjab University - PU Tender
Civil And Construction
Civil Works Others
Building Construction
Eprocure
Opening Date22 Feb 2022
Closing Date3 Mar 2022
Tender Amount₹ 14,97,974
Costs
EMD
₹ 30,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_PU_64575_1Bid Award Id
ViewTender No
6114/EE/MtcTender Authority
Panjab University ViewPurchaser Address
-Website
http://http://puchd.ac.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).
2.82
-
6642
... More
Centering and shuttering including strutting, propping etc. and removal of form for :
-
-
-
... More
Lintels, beams, plinth beams, girders, bressumers and cantilevers.
30.86
-
405
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
-
-
-
... More
Thermo-Mechanically Treated bars.
199.85
-
70
... More
20 mm cement plaster of mix
-
-
-
... More
1:4 (1 cement: 4 coarse sand
266.94
-
225
... More
Finishing walls with Acrylic Smooth exterior paint of required shade :
-
-
-
... More
New work (Two or more coat applied @ 1.67 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)
336.03
-
117
... More
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
336.03
-
60
... More
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade:
-
-
-
... More
Old work (one or more coats)
100
-
38
... More
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. Note: - This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done.
3864.15
-
174
... More
Providing and laying two coats latex bonding agent with the help of painting brush to be applied on existing RCC surface for proper bonding of proposed concrete with existing RCC surface. Complete in all respect at all heights including leads and lifts as per existing building and to the entire satisfaction of engineer-in-charge.
18.52
-
200
... More
Making drills in existing R.C.C slab for 10 and 12 mm dia for rebaring of M.S.Bars with fisher chemical for R.C.C slab connect with new RCC slab/work including lead & lift in any height complete in all respect to the entire satisfaction of the Engineer-in-Charge.
3108
-
200
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements