Panjab University Tender

... More
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Panjab University - PU Tender

Works
Civil And Construction
Eprocure
Opening Date30 Apr 2022
Closing Date26 May 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Waterproofing Membrane:- Applying cold applied syntetc adhessive-- Shalibond- APP 1.5mm for APP membrane having lap shear strength (Membrane to Membrane) after 7 days more than 3MPA on substrate by brush or Trowel. Allow the solvent to evaporate and start fixing Tarfelt APP on adhessive white if is still Tacky. Tarfelt APP Non woven polyester based pilable membrane with release film should have elongation @break longitudinal &Transverse side--30% tested at ASTM D --5147, Tensile strength tested at ASTM D -5147 longitudinal--250N/5 CM & at Transverse-- 120N/5 CM & Tearing strength at N/7.5 cm tested at--ASTM D 5147longitudinal strength--- 250 & Transverse-- 90 for overlapping of joints, rub the polyethelene side of membrane by wire brush apply synthetic adhesive over rubbed area & allow it to be tacky and then affix bituminous side of tarfelt AAP after removal of release film for lonitudinal & Transverse joints overlaps of 75mm & 100mm respectively is desire. Seal all the corners of membrane with shall bond APP or its equivalent. Allow the system to cure for 3 to 4 days.

-

-

-

... More
Protection of Waterproofing membrane:- For UV protection, Tarfelt APP water proofing membrane shall be finally coated with bituminous based Aluminium paints or as per decided by Engineer-in-Charge. Complete in all respect to the entire satisfaction of the Engineer-in-Charge.

2100

-

710



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.