Panjab University Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Panjab University - PU Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date15 Dec 2023
Closing Date16 Jan 2024
Tender Amount₹ 22,76,432 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
a) Panal Size { L = ( 0.300 + 0.325 ) / 2 = 0.3125.} x { B = ( 0.340 + 0.2436 ) / 2 = 0.2918} = L x B ( 0.3125 x 0.2918 ) Area 0.9118 sqm

0.09

1397

15332

... More
b) Panal Size { L = ( 0.300 + 0.325 ) / 2 = 0.3125.} x { B = ( 0.525 + 0.640 ) / 2 = 0.5825} = L x B ( 0.3125 x 0.5825 ) Area 0.1820 sqm

0.18

2790

15332

... More
c) Panal Size { L = ( 0.300 + 0.330 ) / 2 = 0.315} x { B = ( 1.505 + 1.365 ) / 2 = 1.435} = L x B ( 0.315 x 1.435 ) Area 0.4520 sqm(Ref:-N.S.)

0.45

6930

15332

... More
Refixing of already Removed Panels

-

-

-

... More
Installation of already removed panel by cleaning the residual material / mortar from the base wall and adjacent panel edges with hand tools and fixing 40 mm panels back with mouldings etc, including setting in cement mortar 1:3 (1 cement : 3 coarse sand) below. Cost of required centering, shuttering, clamping etc, complete.

-

-

-

... More
3 x 1.2 x 0.300 = 1.08 sqm (Ref:-N.S.)

1.08

9645

8931

... More
Removal and Refixing of Dislodged Panels

-

-

-

... More
Reinstallation of dislodged panels of TYPE A 300cm X 900cmx 40mm from its current location by cleaning the mortar from surfaces all around the panel and the base wall with hand tools and fixing panels back with mortar 1:3 (1 cement : 3 coarse sand) on wall below. Cost of required centering, shuttering, clamping etc, complete.(Ref:-N.S.)

23

190095

8265

... More
Securing in place displacement Panel (out of plane by less than ¾”)

-

-

-

... More
Fixing in place of loose panel, less than ¾” out of its plane into its original position after removing the loose mortar from the joints on the sides and back where possible and filling joints with with mortar 1:3 (1 cement : 3 coarse sand) below. Cost of required centering, shuttering, clamping etc, complete.

-

-

-

... More
OPTIONAL: Pinning/anchoring with anchoring system as specified if needed in any particular case(Ref:-N.S.)

64

538304

8411

... More
Filling of Cracks

-

-

-

... More
Cracks treatment: Small fractures should be cut along the line of feature and clean with water jet and plugged with Cement mortar with Crack -X powder or Paste placed by hand. When the mortar has cued the fracture should be grouted with liquid mortar { The quantity of water should be enough to create a very mobile grout with 10% Dr fix Pagel ZS 10 with 1:1 cement mortar ( 1 Cement : 1 fine sand)}(Ref:-N.S.)

51

100878

1978

... More
Treatment of Exposed rebar (25 %) with corrosion only till the surface

-

-

-

... More
Providing corrosion inhibitor or primer after scraping the reinforcement for any damage to its outer layer with sandpaper and rust remover and installing a new patch over it to match the existing panel as specified in 6mm dia rod as required

-

-

-

... More
16 no x 0.20 sqm = 3.2 sqm(Ref:-N.S.)

3.2

2582

807

... More
Treatment Exposed rebar - Corroded and unwinded

-

-

-

... More
Replacement of the corroded portion of the reinforcement, by welding with a new reinforcement of the same diameter and strength and coating with corrosion inhibitor and finishing by providing a patch to match the existing panel as specified in as specified in 6mm dia rod as required

-

-

-

... More
10 no x 0.40 sqm = 4.0 sqm(Ref:-N.S.)

4

149648

37412

... More
Patch repair for loss of material

-

-

-

... More
Providing cementitious patch repair above plinth level up to floor five level cast in citu reinforced cement concrete ( RCC slab 35 mm thick + Pebble dash Top layer plaster with a mixture of washed pebble or crushed stone 6 mm to 12.5 mm nominal size, with ( White Cement 3:1 marble powder by weight) in proportion of 4 : 7 ( 4 white cement powder mix : 7 marble chips ) by volumn, including White cement & pigment slurry etc as per MOCK-UP schudile over under layer of 35mm thick Reinforced cement concrete panal, furrowing the under layer with scratching tool before laying Top layer of 5mm thick toplayer with white cement Stone as existing panal (Ref:-N.S.)

66

54252

822

... More
Repointing for Open joints

-

-

-

... More
Providing recessed pointing around the panels to finally secure them in place. Pointing of cement sand mortar 1:2: (1 cement : 2 clean washed coarse river sand) with admixture of marble dust matching the panel shade.

-

-

-

... More
Flush pointing around panels with cement and coarse sand in the ratio 1:3 (1 cement : 3 washed clean river coarse sand).

999.74

468878

469

... More
3 side x 40.15 =120.45 m x 8.3 ={ 999.735sqm )

-

-

-

... More
Replacing previous repair with a new patch

-

-

-

... More
Providing a new patch repair as per no 8 or no 9, after removal of previously applied cement over the panels or for failed patches, specially along the top and bottom.

-

-

-

... More
Providing treatment to reinforcement and/or providing aggregate on the surface of the panels as specified above, as per the condition of the panel after removal of previously applied cement.(Ref:-N.S.)

183

197823

1081

... More
Vegetation Removal

-

-

-

... More
Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts.(Ref:-N.S.)

173.6

6249

36

... More
B- Site Specifications

-

-

-

... More
Protection

-

-

-

... More
Providing protection to the work, adjacent surfaces, and the area below the work at all levels.

-

-

-

... More
Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge

-

-

-

... More
25 mm average thickness(Ref:-N.S.)

28.32

2208

78

... More
Scaffolding

-

-

-

... More
Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, upto 25 metre height, above ground level, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and / or pointing and/ or applying chemical and removing it thereafter. Thescaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works.

1020.74

244977

240

... More
3 side x 40.15 =120.45 m x 8.3 ={ 999.735sqm + ( 35m x 0.600m = 21.00sqm) } = 1020.74 sqm

-

-

-

... More
C- New work Specifications (Terrace and base)

-

-

-

... More
Protection for the top edge

-

-

-

... More
Stone work, plain in copings, cornices, string courses and plinth courses, upto 75 mm thick in Cement mortar 1:6 (1 cement : 6 coarse sand), including pointing with white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade.

-

-

-

... More
White sand stone(Ref:-N.S.)

2.16

191910

89002

... More
Protection of the bottom edge profile

-

-

-

... More
Removal of previously applied cement at the bottom of the building profile (Where the panels end).(Ref:-N.S.)

-

-

-

... More
Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2).

-

-

-

... More
25 mm average thickness in 2 layers.(Ref:-N.S.)

21.25

9796

461

... More
Cleaning the surface of Building

-

-

-

... More
Cleaning the stone surface and removing dirt, dust, bird dropping, grease, oil, algae, fungus, monkey beats, vegetable growth etc., including providing, applying and washing the surface with liquid Ammonia Chemical of 5% solution and other chemical cleaning agent as approved by Archaeological Survey of India/ Engineer-in-charge, of approved brand and manufacturer, with the help of required scrubbers and also cleaning with machine operated water jet mixed with desired quantity of fine silica where ever required, without causing any scratching/ damage to the stone surface and finally washing the surface with clean water with the help of pressure jet machine, complete in all respect, including taking all precautions to safeguard ventilators, windows, doors etc. by suitable covering so as to avoid any damage to the building/ structure, all as per direction of Engineer-in-charge (The rate is inclusive of all materials & labours involved except scaffolding). (Ref:-N.S.)

705.5

98064

139



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.