National Fertilizers Limited Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Costs
EMD
Refer DocumentsDocument Cost
₹ 750Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_NFL_79903_2Bid Award Id
ViewTender No
NFB/E-312/AC/2021-22Tender Authority
National Fertilizers Limited ViewPurchaser Address
-Website
http://https://www.nationalfertilizers.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Central HVAC Units in New Ammonia Plant (One set consisting of 129.5T X 3 capacity HVAC unit per month for 12 months)
12
-
-
Package Units for SG Plant C/R (One set consisting of 3 x 11 T capacity AC unit per month for 12 months)
12
-
-
.-do- for Urea Plant C/R (One set consisting of 2x11 T capacity AC unit per month for 12 months)
12
-
-
.-do- for ESP C/R in CPP (One set consisting of 2x11 T capacity AC unit per month for 12 months)
12
-
-
.-do- for VFD room in SGP (One set consisting of 3x11 T capacity AC unit per month for 12 months)
12
-
-
.-do- for VFD room in Ammonia (One set consisting of 2x11T capacity AC unit per month for 12 months)
12
-
-
.-do- for ESP C/R in SGP (One set consisting of 1x11T capacity AC unit per month for 12 months)
12
-
-
Water cooled Air Pressurization unit in CPP (One set consisting of 21000 CFM capacity Air Pressurization unit per month for 08 months)
8
-
-
.-do-, Capacity 35000 CFM
8
-
-
Flame Proof Package AC Units (One set consisting of 2x3T + 1x5T capacity Shelter AC unit per month for 12 months)
12
-
-
Part B-1: Running and periodic maintenance of Portable AC Units, Water Cooler, Desert Cooler etc. of following Capacities and specification. (The Quantities for Part-B-1 shall be measured on actual basis).
-
-
-
Window type AC of capacity 0.75T (3 Numbers per month for 8 Months)
24
-
-
.-do- but 1.5T (164 Nos. X 8 Months)
1312
-
-
Split AC of capacity 1.0 T/1.5 T /2.0 T (142 Numbers per month for 8 Months)
1136
-
-
Split AC of capacity 3.0 T (6 Numbers per month for 8 Months)
48
-
-
Split AC of capacity 1.5T/2.0T (10 Numbers per month for 12 Months)
120
-
-
Water cooler of capacity 150 Ltr. (41 Numbers per month for 8 Months)
328
-
-
Water Cooler of capacity 380 Ltr (3 Numbers per month for 8 Months)
24
-
-
Desert cooler with one exhaust fan and one pump (277 Numbers per month for 8 Months)
2216
-
-
Refrigerator of capacity 100/165 Ltr. (21 Numbers per month for 12 Months)
252
-
-
Refrigerator of capacity 240/265 Ltr. (3 Numbers per month for 12 Months)
36
-
-
Refrigerator of capacity 300/400 Ltr. (7 Numbers per month for 12 Months)
84
-
-
Biological Oxygen Demand Incubator (2 Numbers per month for 12 Months)
24
-
-
Bottle cooler/Deep Freezer of capacity 100/150 Ltr. (3 Numbers per month for 12 Months)
36
-
-
Part B-2: Shifting of Portable AC Units, Water Coolers/ Refrigerators/ Bottle coolers/ BOD incubators/ Desert Coolers etc. of following capacities and specification. (The Quantities for Part-B-2 shall be measured on actual basis).
-
-
-
Shifting for new installation of AC/ Water coolers/ Refrigerators/ BOD Incubators, Desert cooler with in Factory & Township:
-
-
-
a) Different size of Portable AC of capacity up to 2 T/ Water coolers/ Bottle coolers/ BOD Incubators & Refrigerators.
10
-
-
b) Different size of Desert coolers
10
-
-
Strengthening of frame/stand/ply etc.for old installed AC and desert coolers in Factory and Township
-
-
-
a) Different sizes of portable AC upto 2 T
5
-
-
b) Different sizes of desert coolers
15
-
-
Shifting for new installation of AC, Desert cooler, Water cooler, Refrigerator from Factory to Township & vice versa
-
-
-
a) Different capacity of portable AC up to 2 T
10
-
-
b)Different capacity of water cooler up to 150 Ltr.
5
-
-
c)Different capacity of Refrigerator up to 400 Ltr.
2
-
-
d) Different capacity of Desert Coolers of all sizes
10
-
-
e)Bottle cooler/ Deep freezer/ BOD Incubators of all sizes
2
-
-
Providing & Fixing/ Replacement of Float Valve Assembly complete in all respects,15 mm nominal bore of Desert Coolers installed in factory & township.
150
-
-
Providing fixing/ Replacement of Flexible water line connections pipe 15 mm nominal bore& 30 cm long from the existing water lines to the Desert Coolers/ water coolers of factory & township.
200
-
-
Part B-3(i) REFRIGERATOR
-
-
-
Gas filling capacity upto 180 ltrs. (with new drier)
1
-
-
Gas filling capacity above 180 ltrs. Upto 400 ltrs.
1
-
-
Compressor replacement with reconditioned one capacity upto 180 ltrs.
1
-
-
-do- capacity above 180 ltrs. Upto 400 ltrs.
1
-
-
Replacement of cooling coil with new one upto 180 ltrs.
1
-
-
-do- above 180 ltrs. Upto 400 ltrs.
1
-
-
Replacement of condenser coil with new one upto 180 ltrs.
1
-
-
Replacement of condenser coil with new one-above 180 ltrs. Upto 400 litres
1
-
-
Replacement of defective thermostat with new one for all capacity
1
-
-
Replacement of defective relay with new one for all capacity
1
-
-
Replacement of thermostat knob for all capacity
1
-
-
Filter/Strainer with capillary for all capacity
1
-
-
Dryer for all capacity
1
-
-
OLP for all capacity
1
-
-
Relay for all capacity
1
-
-
Panel Gasket for 165 ltr. Capacity
1
-
-
Panel Gasket above 165 ltrs. Upto 400 ltr. Capacity
1
-
-
Part B-3(ii) DEEP FREEZERS/ BOD INCUBATOR/ BOTTLE COOLER
-
-
-
Gas filling any capacity
1
-
-
Compressor repairing charges of any capacity
1
-
-
Rewinding of fan motor
1
-
-
Replacing of defective relay with new one for all capacity.
1
-
-
Replacing thermostat with new one for all capacity
1
-
-
Filter/Strainer with capillary
1
-
-
O.L.P. for any capacity
1
-
-
Part B-3(iii) Air Conditioner -1.0 Te
-
-
-
Compressor replacement with reconditioned one
1
-
-
Fan motor repair
1
-
-
Thermostat
1
-
-
Selector switch
1
-
-
Starting capacitor
1
-
-
Running capacitor
1
-
-
Relay
1
-
-
Fan motor capacitor
1
-
-
Blower wheel
1
-
-
Fan
1
-
-
Strainer(copper) with capillary
1
-
-
Knob set
1
-
-
Filter Pad
1
-
-
New wiring kit
1
-
-
Front Grill (plastic)
1
-
-
Water tank
1
-
-
Condenser coil
1
-
-
Cooling coil
1
-
-
Gas filling (complete job welding/ including brazing)
1
-
-
Overload protector (OLP)
1
-
-
Air Conditioner -1.5 Te
-
-
-
Compressor replacement with reconditioned one
1
-
-
Fan motor repair
1
-
-
Thermostat
1
-
-
Selector switch
1
-
-
Starting capacitor
1
-
-
Running capacitor
1
-
-
Relay
1
-
-
Fan motor capacitor
1
-
-
Blower wheel
1
-
-
Fan
1
-
-
Strainer(copper) with capillary
1
-
-
Knob set
1
-
-
Filter Pad
1
-
-
New wiring kit
1
-
-
Front Grill (plastic)
1
-
-
Water tank
1
-
-
Condenser coil
1
-
-
Cooling coil
1
-
-
Gas filling (complete job welding/ including brazing)
1
-
-
Overload protector (OLP)
1
-
-
Air Conditioner -2.0 Te
-
-
-
Compressor replacement with reconditioned one
1
-
-
Fan motor repair
1
-
-
Thermostat
1
-
-
Selector switch
1
-
-
Starting capacitor
1
-
-
Running capacitor
1
-
-
Relay
1
-
-
Fan motor capacitor
1
-
-
Blower wheel
1
-
-
Fan
1
-
-
Strainer(copper) with capillary
1
-
-
Knob set
1
-
-
Filter Pad
1
-
-
New wiring kit
1
-
-
Front Grill (plastic)
1
-
-
Water tank
1
-
-
Condenser coil
1
-
-
Cooling coil
1
-
-
Gas filling (complete job welding/ including brazing)
1
-
-
Overload protector (OLP)
1
-
-
Part B-3(iv) WATER COOLER
-
-
-
Compressor replacement with reconditioned one
1
-
-
Fan motor replacement
1
-
-
Fan motor repair
1
-
-
Thermostat
1
-
-
Starting capacitor
1
-
-
Running capacitor
1
-
-
Relay
1
-
-
Overload Protector
1
-
-
Fan motor capacitor
1
-
-
Fan blade complete
1
-
-
Strainer (copper) with capillary
1
-
-
New wiring kit
1
-
-
Tank rubber gasket
1
-
-
Condenser coil
1
-
-
Cooling coil
1
-
-
Tap valve
1
-
-
Float valve with float
1
-
-
Gas filling complete job welding/including brazing etc.
1
-
-
Part B-3 (v) DESERT COOLER
-
-
-
Fan motor rewinding and repairing
1
-
-
Water pump replacement with new one Submersible Type
1
-
-
Pump motor rewinding/repairing
1
-
-
Cleaning and painting of complete cooler
1
-
-
Replacement of suction filter parts with new one
1
-
-
Front Grill (Plastic)
1
-
-
Speed Regulator
1
-
-
On-off switches
1
-
-
Fan motor capacitor
1
-
-
PVC hose for water distribution
1
-
-
Water distribution cap (Plastic)
1
-
-
Water discharging elbows (Plastic)
1
-
-
New wiring kit
1
-
-
Electronic speed regulator make Anchor
1
-
-
NOTES TO ANNEXURE 1) All the consumables and non consumable material are to be supplied by NFL for Part-A except refrigerant gas R-12/134a, R-22 and Nitrogen Gas, which shall be supplied by contractor at no additional charges. 2) Vacuum Pump, Gas transfer pump, Condensing unit and empty mafron gas cylinders are also to be arranged by the contractor as and when required without any delay or additional charges. 3) For Part B-1 & B-2, the rates are inclusive of all material required for completion of job and no additional payment shall be made to the contractor. 4a) For Part B-3 (I) to (v), the rates are inclusive of all material required for completion of job and no additional payment shall be made to the contractor. b) Rates have been taken for the machines presently not in maintenance schedule and shall be added later on. c) These items are not to be operated in normal conditions. d) Gas filling include checking & repair of leaking points in gas circuit and shall b carried out by the contractor at no additional cost. 5) For any clarification regarding job execution, refer to the Job Specifications & Scope of work.
-
-
-
Part B-3(vi) REPAIR JOBS & REFRIGERANT GAS
-
-
-
Repair of Crank Shaft of FRICK Make 606 compressor by grinding of connecting rod segments, re-metalling of Big End Bearings with white metal matching to connecting rod segments size, Re-metalling of Main Body Bush with white metal and shaft by spray welding process as per actual size given & cleaning of oil ports.
1
-
-
Repair of Crank Shaft of FRICK Make 303 compressor by grinding of connecting rod segments, re-metalling of Big End Bearings with white metal matching to connecting rod segments size, Re-metalling of Main Body Bush with white metal and shaft by spray welding process as per actual size given & cleaning of oil ports.
1
-
-
Supply of Refrigerant Gas R-12
1
-
-
Supply of Refrigerant Gas R-22
1
-
-
Supply of Refrigerant Gas 134a
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements