National Fertilizers Limited Tender
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Costs
EMD
₹ 25,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Nfn/civil/638/2024/05 Dated 06/07/2024 Providing And Laying Pavement And Construction Of Foundations For Shifting Of Ammonia Loading / Unloading Plate Form From East To West At Proposed New Horton Sphere Site In Ammonia Plant Inside Factory Area
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NFL_200578_1Tender No
NFN/CIVIL/638/2024/05 DATED 06/07/2024Tender Authority
National Fertilizers Limited ViewPurchaser Address
-Website
http://https://www.nationalfertilizers.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
i) 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size).
5
-
-
ii) 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size).
60
-
-
Centering and shuttering including strutting, propping etc. and removal of form work for :
-
-
-
i) Foundations, footings, bases for columns, floor sides etc.
60
-
-
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
-
-
-
i) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
70
-
-
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
-
-
-
i) Thermo-Mechanically Treated bars of grade Fe-500D or more.
5500
-
-
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement Mortar 1:6 (1 cement : 6 coarse sand).
2
-
-
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
-
-
-
i) Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
1
-
-
ii) Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix)
1
-
-
Providing and laying in position cement cocrete interlocking paver blocks conforming to IS: 15658 -2006, 100 mm thick having compressive strength 50N/mm2 (ISI Mark) of any design/shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.
400
-
-
Assisting in executing various job un-susceptible to measurement and other work which are not including in any items stated above/ scope of works as per instructions of the Engineer-in-Charge. :
-
-
-
i) For this purpose, contractor has to deploy one Skilled Labour for one day (For 8:00 hour), which will be treated as one unit of each operation.
10
-
-
ii) For this purpose, contractor has to deploy one Un-skilled Labour for one day (For 8:00 hour), which will be treated as one unit of each operation.
20
-
-
Total Quoted Amount (Withot GST) :
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements