Ministry Of Road Transport And Highways Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Ministry Of Road Transport And Highways - MORTH Tender

Services
Civil And Construction
Road Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date5 Sep 2024
Closing Date4 Oct 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Cs For Dpr (i) Bypass Of Town Kot Ise Khan (nh-703b) Km.8.500-12.00 (ii) Bypass Of Town Bhikwind (nh-703b) Km.72.800-76.300 (iii) Bypass Of Town Bagha Purana

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Highway Engineer

5

-

-

... More
Meterial Engineer cum Geotechnical Engineer

6

-

-

... More
Survey Engineer

7

-

-

... More
Traffic/Road Signage/Marking and Safety Expert

4

-

-

... More
Environmental Specialist

3

-

-

... More
Quantity Surveyor

6

-

-

... More
Land Acquistion Expert

10

-

-

... More
Utility Expert

4

-

-

... More
SUB-TOTAL-1

-

-

-

... More
SUB-PROFESSIONAL STAFF :

-

-

-

... More
Sub-Professional-1

-

-

-

... More
Sub-Professional-2

-

-

-

... More
Sub-Professional-3

-

-

-

... More
Sub-Professional-4

-

-

-

... More
Sub-Professional-5

-

-

-

... More
Sub-Professional-6

-

-

-

... More
Sub-Professional-7

-

-

-

... More
SUB-TOTAL-2

-

-

-

... More
Total (Sub Total 1 + Sub Total 2):

-

-

-

... More
Note: For proper assessment of utility estimates and proper drainage system provisions, DPR consultant shall also engage an utility expert and drainage expert at sub-professional level, with relevant technical expertise in respective fields.

-

-

-

... More
II. SUPPORT STAFF

-

-

-

... More
Office Manager

-

-

-

... More
Typist

-

-

-

... More
Office Boy

-

-

-

... More
Night Watchmen

-

-

-

... More
Total:

-

-

-

... More
III. Transportation (Fixed Costs) Rate/Month

-

-

-

... More
The vehicles provided by the consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants

-

-

-

... More
Total:

-

-

-

... More
IV. Duty Travel to Site (Fixed Costs): Note: Rate quoted includes Hotel charges, travel cost etc. complete.

-

-

-

... More
Duty Travel to Site (LS)

1

-

-

... More
Total:

-

-

-

... More
V. Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairing etc. (Rate per Month)

-

-

-

... More
Office Rent (Fixed Costs)

1

-

-

... More
Total:

-

-

-

... More
VI. OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs) Rate/Month

-

-

-

... More
Office Supplies

-

-

-

... More
Drafting Supplies

-

-

-

... More
Computer Running Costs

-

-

-

... More
Domestic and International Communication

-

-

-

... More
Total:

-

-

-

... More
VII. OFFICE FURNITURE AND EQUIPMENT (Rental)

-

-

-

... More
Office Furniture and Ecquipment (LS)

1

-

-

... More
Total:

-

-

-

... More
VIII. REPORTS & DOCUMENTS PRINTING (Rate per Copy)

-

-

-

... More
Monthly report (3 copies per Month)

30

-

-

... More
Inception Report & QAP

3

-

-

... More
Environment and Social Impact Screening Report

4

-

-

... More
Draft Feasibility Report

4

-

-

... More
Final Feasibility Report

6

-

-

... More
Strip Plan with LA Reports

6

-

-

... More
Draft LA and Clearances I Report

4

-

-

... More
Final LA and Clearances I Report

4

-

-

... More
Draft Environmental Assessment Report & RAP

4

-

-

... More
Final Environmental Assessment Report and RAP

6

-

-

... More
Draft Detailed Design Report & Drawings etc.

4

-

-

... More
Draft EMP

4

-

-

... More
Draft Bidding Documents

4

-

-

... More
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.

6

-

-

... More
Final EMP.

6

-

-

... More
Final Bidding Documents

6

-

-

... More
Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each)

9

-

-

... More
LA & Clearances II Report

6

-

-

... More
Total:

-

-

-

... More
Note: In case of splitting of the project in packages after alignment is finalized, the additional payment in respect of reports and document printing shall be made on prorate basis of accepted financial proposal according to additional number of documents submitted, as mentioned above

-

-

-

... More
IX.Survey and Investigation: A. Topographical Survey (Fixed Rate)

-

-

-

... More
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.

37

-

-

... More
Detailed topographic surveys using mobile / aerial LiDAR or better Technology

37

-

-

... More
B. Investigation (Fixed Cost)

-

-

-

... More
Road and Bridge Inventory

-

-

-

... More
FWD Test and Pavement Evaluation

-

-

-

... More
Roughness Survey

-

-

-

... More
Axle Load Survey

-

-

-

... More
Material Survey and Investigation

-

-

-

... More
Sub-grade Investigation

-

-

-

... More
Traffice Survey

-

-

-

... More
Socio-economic & Census Survey/Studies

-

-

-

... More
Land Acquisition Studies

-

-

-

... More
Any other Investigations/Surveys

-

-

-

... More
*Sub-Soil Investigation (Boring)

-

-

-

... More
a) Boring in all type of soils (other than hard rock)

1500

-

-

... More
b) Boring in hard rock

200

-

-

... More
Total:

-

-

-

... More
Note:*Quantities of boring shall be taken from Financial Proposal Form No.V. for financial evaluation, the sequantities and rates quoted by the consultant will be considered. However, payment shall be made on the actual quantity of boring at rates quoted above by the consultant, which may be substantially more or less than the estimated quantities.

-

-

-

... More
C. Network Survey and GPR

-

-

-

... More
Network Survey of the existing Highways as a repository for civil works as per directions from Authority.

1

-

-

... More
GPR Survey for detection of under ground utilities

1

-

-

... More
Total:

-

-

-

... More
X. Cost of Supply and Fixing Boundary pillars

-

-

-

... More
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )

1

-

-

... More
Total:

-

-

-

... More
XI. Land Acquisition Team including support staff and logistics/ transportation. [A.] Land Acquisition Team including support staff :

-

-

-

... More
Ex-Land Revenue Inspector/ Officer or equivalent (1x8)

8

-

-

... More
Ex-Kanoogo/Girdwar or equivalent (1x8)

8

-

-

... More
Ex-Patwari or Equivalent (1x8)

8

-

-

... More
Typist (2x8)

16

-

-

... More
Peon (1x8)

8

-

-

... More
Number of Land acquisition Teams (One Only)

-

-

-

... More
Sub-Total [A]:

-

-

-

... More
B. Logistics for Land Acquisition Team

-

-

-

... More
Computer including necessary peripherals (2x8)

16

-

-

... More
Printers (2x8)

16

-

-

... More
Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km (1x8)

8

-

-

... More
Number of Land acquisition Teams (One Only)

-

-

-

... More
Sub-Total [B]:

-

-

-

... More
Total (Sub Total [A] + Sub Total [B]):

-

-

-

... More
Note: (i) The consultant shall provide one land acquisition expert along with allied team and supporting logistic as envisaged in clause 5.1.5.1 of TOR for each 100 km stretches proposed for DPR preparation or part thereof subject to the condition that such 100 km length shall not stretch beyond two adjoining districts (For example total length of package is 343 km, there will be four team).

-

-

-

... More
Estimate of costs for Expatriate consultants (in Indian Rupees) I. REMUNERATION OF EXPATRIATE STAFF including per diem allowances.

-

-

-

-

-

-

... More
Sub-Professional-1

-

-

-

... More
Sub-Professional-2

-

-

-

... More
Sub-Professional-3

-

-

-

... More
Sub-Professional-4

-

-

-

... More
Sub-Professional-5

-

-

-

... More
Sub-Professional-6

-

-

-

... More
Sub-Total-I:

-

-

-

... More
II. Mobiliation and Demobilization

-

-

-

... More
A. International Airfares (Fixed costs)

1

-

-

... More
B. Inland Travel in Home Country (Fixed costs)

1

-

-

... More
C. Other Missc expenses (like DA, internal travel expenses other incidentals)

1

-

-

... More
SUB-Total-II:

-

-

-

... More
Total(Sub Total-I + Sub Total-II):

-

-

-

... More
Total Cost Net of Goods and Service Tax: **Total cost net of Goods and Service Tax shall be considered for Financial Evaluation. Note: Payment will be made as per stipulations of the conditions of conntract.

-

-

-

... More
Goods and service Tax

-

-

-

... More
TOTAL COSTS (Including GST)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.