Ministry Of Road Transport And Highways Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Ministry Of Road Transport And Highways - MORTH Tender

Services
Civil And Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date11 Jun 2024
Closing Date8 Aug 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Bridge/Structural Engineer

39

-

-

... More
Senior Pavement Specialist

24

-

-

... More
Senior Quality cum Material Expert

24

-

-

... More
Road Safety Expert

23

-

-

... More
SUB-TOTAL-1

-

-

-

... More
SUB-PROFESSIONAL STAFF :

-

-

-

... More
Survey Engineer

34

-

-

... More
Assistant Highway Engineer

84

-

-

... More
CAD Expert

12

-

-

... More
Environmental Engineer

6

-

-

... More
Assistant Bridge Engineer

24

-

-

... More
Assistant Quality cum Material Engineer

24

-

-

... More
Quantity Surveyor

32

-

-

... More
SUB-TOTAL-2

-

-

-

... More
Total(Sub Total 1 + Sub Total 2):

-

-

-

... More
II. SUPPORT STAFF

-

-

-

... More
Office Manager (24+60 = 84 months)

84

-

-

... More
Accountant cum Cashier (24 months)

24

-

-

... More
Steno cum Computer Operator (24+60 = 84 months)

84

-

-

... More
Office Boy (1 no) (24+60 = 84 months)

84

-

-

... More
Note : Billing rates as indicated above shall be increased in accordance of clause 6.2(a) Special Conditions of Contract for the personnel of all categories namely (i) key Personnel; (ii) sub-professional personnel and (iii) Support staff. The increase as above shall be payable only on the remuneration part of Key Personnel, Sub-Professional Personnel and support staff. However, for evaluation of Bid propsals, the quoted initial rate shall be multiplied by the total time input for each position on this contract, i.e. without considering the increase in the billing rates.

-

-

-

... More
Total:

-

-

-

... More
III. Transportation (Fixed rate on rental basis) *The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run

-

-

-

... More
Innova or equivalent not more than 2 years old) (1*24 (Construction Period) + 1*60 (DLP)) =84 Rate per month

84

-

-

... More
Scorpio or equivalent 4 x 4 vehicles (not more than 2 years old) (1*24 (Construction Period)) Rate per month

24

-

-

... More
Bolero or equivalent 4 x 4 vehicles (not more than 2 years old) (1*24 (Construction Period) + 1*60 (DLP)) =84 months Rate per month

84

-

-

... More
Total:

-

-

-

... More
IV. Duty Travel to Site (Fixed Costs) (For all Lengths of projects): Professional and Sub- Professional Staff (Trips)

-

-

-

... More
To Head Quarter

10

-

-

... More
To Regional Office, Chandigarh

10

-

-

... More
Total:

-

-

-

... More
V. Office Rent (Fixed Costs) - Minimum200 sq m area of office shall be rented. The rent cost includes maintenance, cleaning, repairing etc. complete (Rate per Month)

-

-

-

... More
200 sqmt (During Construction period)

24

-

-

... More
50 sqmt (During Maintenance /DLP period)

60

-

-

... More
Total:

-

-

-

... More
VI. OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs) (Monthly Rate) 24 months (Consturction) + 60 months (Maintenance)

-

-

-

... More
Office Supplies

84

-

-

... More
Drafting Supplies

84

-

-

... More
Computer Running Costs

84

-

-

... More
Domestic and International Communication

84

-

-

... More
Total:

-

-

-

... More
VII. OFFICE FURNITURE AND EQUIPMENT (Rental)

-

-

-

... More
During Construction period (24 months)

24

-

-

... More
During Maintenance /DLP period (60 months)

60

-

-

... More
The cost shall include rental charges towards all such furniture and equipmentas required for proper functioning of office. Office furniture shall include executivetables, chairs, visitorchairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone(2external & 10internallines),photocopier(15ppm,12000copiesper month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD- 250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded antivirus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.

-

-

-

... More
Total:

-

-

-

... More
VIII. REPORTS & DOCUMENTS PRINTING (Rate per Copy)

-

-

-

... More
Monthly reports (Design and Construction) No. of Reports-84 x No. of Copies-3 (84x3)

252

-

-

... More
Half yearly Reports No. of Reports-8 x No. of Copies-3 (8x3)

24

-

-

... More
Various others reports as provided in the Concession Agreement such as Completion Report No. of Reports-3 x No. of Copies-3 (3x3)

9

-

-

... More
Total:

-

-

-

... More
Road Survey Equipment (Rate per Km / Nos) The cost shall include carrying out survey using equipment, manpower, software and report processing.

-

-

-

... More
Surface defects detection and roughness measurement using Network Survey Vehicle

17.01

-

-

... More
Pavement strength measurement using FWD

17.01

-

-

... More
Bridge inspection using Mobile Bridge Inspection Unit

1

-

-

... More
Road signs inspection using Retro Reflectometer

17.01

-

-

... More
Total:

-

-

-

... More
Contingencies:

-

-

-

... More
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of Contingency shall be operated with the specific approval from Competent Authority in MoRT&H / Bro. (Fixed Amount of Rs. 10,00,000 shall be entered)

1

-

-

... More
Total Cost Net of Goods and Service Tax: **Total cost net of Goods and Service Tax shall be considered for Financial Evaluation. Note: Payment will be made as per stipulations of the conditions of conntract.

-

-

-

... More
Goods and service Tax

-

-

-

... More
TOTAL COSTS (Including GST)

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.