Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender
Combined ShapeCreated with Sketch.Awarded Tender: Contract Date - 17 Oct 2019

Ministry Of Power

Moga, Punjab

  • Opening Date

    03 Sep 2019

  • Closing Date

    17 Sep 2019

  • Tender Amount

    Refer document

  • EMD

    -

Reminder

Follow

Download
Are you Looking for Joint Venture Partners, Contractor Consortium, Back-to-Back Contractor, Project Financier?
We will help you to find the right match for FREE.
Summary

Sanitary Napkins Incinetator Machine With Smoke Control Unit

Don't have sufficient eligibility, BG funds or resources?
We will help you to find the right match for FREE.
BOQ Items

No BOQs Available

Bid Number: GEM/2019/B/339630 Dated: 03-09-2019 Bid Document Bid Details Bid End Date/Time 17-09-2019 15:00:00 Bid Life Cycle (From Publish Date) 90 (Days) Bid Offer Validity (From End Date) 30 (Days) Ministry/State Name Ministry Of Power Department Name Na Organisation Name N/a Office Name Powergrid, Corporate Office, Gurgaon Total Quantity 2 Item Category Sanitary Napkins Incinetator Machine with Smoke Control Unit Experience with Government Required 1 Year (s) MSE Exemption For Years Of Experience And Turnover Yes Startup Exemption For Years Of Experience And Turnover Yes Bid to RA enabled No Sanitary Napkins Incinetator Machine With Smoke Control Unit ( 2 pieces ) Technical Specifications * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) GENERAL Type - * Purpose Burn used Sanitary Napkins to sterile ash and stop automatically * Color - * Operation Mode Electronically operated, fully Automatic * Loading Type - * 1 / 8 Stand provided No Yes, No Number of chambers Two * Trap Door available Yes * All MS parts Powder coated Yes * Spare parts should be available for Minimum 5 years from date of supply Yes * All electrical parts are ISI Marked Yes * DIMENSIONS OF MAIN UNIT Thickness of thermal Insulation material (mm) 40 25, 40 Thickness of MS/SS sheet of housing cabinet (external) (mm) 1.2 * Thickness of MS/SS sheet of burning chamber (internal) (mm) (Min) 5 5 Or higher Machine Width(mm) - * Machine Depth (mm) - * Machine Hight(mm) - * Machine Weight(kg) 51-250 5-15, 16-30, 31-50, 51-250 Door width(mm) - * Door height(mm) - * Thickness of door (mm) 60 60.0 Internal/burning chamber shape - * Flexible emission Outlet pipe dia (mm) - 25, 40, 50, 63, 76 Detachable ash tray length (mm) - * Detachable ash tray width (mm) - * Detachable ash tray height (mm) - * Stand Height (mm) - * Stand Width (mm) - * Stand Depth (mm) - * 2 / 8 MATERIAL OF MACHINE UNIT Material of Housing cabinet (External) Mild Steel(CRCA) sheet Mild Steel(CRCA) sheet, Stainless Steel sheet of SS-304 grade Material of Burning chamber (Internal) Mild Steel(CRCA) sheet Mild Steel(CRCA) sheet, Stainless Steel sheet of SS-304 grade Finish of MS parts of cabinet Epoxy anti rust proof painting for superior finish * Material of Thermal Insulation High Density Ceramic Board High Density Ceramic Fiber sheet, High Density Ceramic Board CONSTRUCTIONAL FEATURES Thermal insulation of burning chamber housed in outer chamber Yes * Burning Chamber tray provided Yes * Emission Outlet pipe location - * Means of connecting the unit outlet with flue gas emission pipe - * Type of door lock provided Latch lock * CONTROL & FUNCTIONAL FEATURES Temperature indicator provided Yes * Timer provided Yes * Auto cut-off temperature display Yes * Digital display to see actual and set temperature No * Minimum Burning temperature (degree C) 800 * Burning Capacity per day (Number of Napkins) 200-500 200-500 Burning Capacity at a time (Number of Napkins) 16-25 16-25 Residue Ash per Napkin (gms) 1 * Burning time of full capacity Napkins/pads (minutes) 10 10.0 3 / 8 Skin temperature of the unit under operation (deg C) 0-15 * Installation, training, demonstration and plumbing included Yes * ELECTRICAL AND SAFETY FEATURES Automatic digital controller for time Yes * Automatic digital controller for temperature Yes * Equipment ON/OFF indicator provided Yes * Power supply - * Electrical Power Consumption(Watt) - * Minimum length of power chord to be supplied along with machine (mtr) 2 * Type of Heater Ceramic heater containing coil * Power saver (auto power cut-off) Yes * Safety MCB provided (16A to 30A) Yes * Protection against electric shock when checked as per IS:302-1/2008 Yes * Minimum Insulation Resistance (IR) at 500 VDC (Mega Ohm) 2 * Maximum Electrical Insulation and Leakage current as per IS:302-1/2008, (mA) 0.21 * Maximum Eart

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.