GAIL India Limited Tender
... More
If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.
Costs
EMD
₹ 27,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
GEM/2025/B/5884321Tender No
GEM/2025/B/5884321Tender Authority
GAIL India Limited ViewPurchaser Address
-Website
http://bidplus.gem.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
TenS47_d53645fc-a198-4116-a52d1738149662948_buycon9.gail.noida@gembuyer.in.pdf
list-of-categories-where-trials-are-allowed_1712126171.pdf
BOQ Items
... More
By Boring of minimum 150 mm dia boreholes as specified in specific requirement through all kinds of soil excluding hard rock
-
-
-
... More
On River/ Water Bodies Bank
350
1222
427763
... More
On River/ Water Bodies Bank, by sides of Roads, Railways etc.
-
-
-
... More
In River / Water Bodies Bed
75
1876
140715
... More
In River / Water Bodies Bed including making necessary arrangement for supplying floating plate form, boring / drilling/ other associated equipment & shifting etc all complete. Note: Measurement should be for actual depth from bed level.
-
-
-
... More
Drilling through rock/boulder strata
-
-
-
... More
Drilling through rock/boulder strata (Considered when Rock quality designation (RQD) is min 25%) with minimum Nx size bit as per instruction of Engineer-in-charge.
-
-
-
... More
On River/ Water Bodies Bank
50
2347
117395
... More
On River/ Water Bodies Bank, by sides of Roads, Railways etc.
-
-
-
... More
In River / Water Bodies Bed
25
2751
68794
... More
In River / Water Bodies Bed including making necessary arrangement for supplying floating plate form, boring / drilling/ other associated equipment & shifting etc all complete. Note: Measurement should be for actual depth from bed level.
-
-
-
... More
Field Investigations
-
-
-
... More
Conducting Standard Penetration Tests
320
96
30867.2
... More
Conducting Standard Penetration Tests in Boreholes as specified.
-
-
-
... More
Collecting 100 mm dia undisturbed sample
64
72
4613.12
... More
Collecting 100 mm dia undisturbed sample form boreholes as specified.
-
-
-
... More
Collecting Disturbed samples from Bore Holes
256
72
18452.48
... More
Collecting Disturbed samples from Bore Holes
-
-
-
... More
Conducting the following laboratory tests
-
-
-
... More
Conducting the following laboratory tests in NABL or equivalent accredated labarotary as per ISO/IEC 17025
-
-
-
... More
Atterberg's Limit
320
59
18995.2
... More
Atterberg's Limit (Liquid Limit & Plastic Limit)
-
-
-
... More
Natural Moisture Content
320
59
18995.2
... More
Bulk and Dry Density
320
59
18995.2
... More
Specific gravity and Void ratio
320
59
18995.2
... More
Ground Water level
20
96
1929.2
... More
Grain Size Analysis and IS Classification
320
59
18995.2
... More
Shear Strength Parameters
75
59
4452
... More
Shear Strength Parameters (Cohesion and Friction Angle)
-
-
-
... More
Chemical Analysis of Soil
20
96
1929.2
... More
Laboratory test on rock sample
-
-
-
... More
Laboratory test on rock sample as specified/ as decided by EIC
-
-
-
... More
Core Recovery (RQD)
20
121
2438
... More
Mohr's Scale of Hardness
20
121
2438
... More
Point Load Test
20
121
2438
... More
Unconfined Compressive Strength
20
121
2438
... More
HYDROGRAPHICAL & HYDROLOGICAL SURVEY
-
-
-
... More
HYDROGRAPHICAL/TOPOGRAPHICAL & HYDROLOGICAL SURVEY: Conducting Topographic / Hydrographic survey for 50 meters on either sides of proposed pipeline alignment and dry bed shall be surveyed upto widths as mentioned below (refer note:1) and spot levels shall be taken at grids at 5m interval, as well as providing all men, tools, tackles, materials, survey boats, echo-sounder, drilling rigs, soil testing equipment, other equipment, other support facilities (including mobilization and demobilization and relocation of equipments, necessary plant and personnel at the sites on land and in water) necessary for the survey including collection of Historical / Hydrological data such as maximum velocity & discharge at HFL, scour bed level, width of water body at HFL ,other hydrological data and other river details such as meandering and river bed profile, existence of any bridge, hydraulic structure or reservoir within 10 Km U/S and D/S of the crossings for each river crossing site from the local / regional agencies such as CWC, Deptt of irrigation, Flood control Authority, PWD etc. and associated work and submitting Draft and Final Survey Report, Drawings, Maps, Data etc. (One Lot) in an approved format with full scale for Hydrological and Hydrographical Survey, Scour Depth, Stability of Bank Slopes, Analysis of pipeline depth and buoyancy calculations, Proposal for anti-buoyancy measures, Scour profile of the riverbed along the pipeline crossing along with scour calculations etc.,Technical Specification, in accordance with the implementation schedule and instructions of the Engineer-in-charge.The data shall be maximum of the recorded data in the last 25 years complete as listed in details in scope of work.
All works completed in all respect.
Note:
i) The banks on either side shall be surveyed up to 600 meters for Yamuna River as per requirement.
ii) Scour Calculation shall be in this scope.
iii) A consolidated report in three sets with final drawings/data/documents (Paper copies in Colour) and soft copy (both pdf and editable copies) shall be submitted.
-
-
-
... More
Hydrographical/Topographical & Hydrological Survey report
1
362520
362520
... More
Yamuna River, (Bank to Bank width 350 m approx.)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements