Bharat Sanchar Nigam Limited Tender

If you want to inquire about any e-tender the Punjab government has posted, Bidassist gives a one-stop solution i.e. being a registered bidder you will find every eprocurement Punjab tender on BidAssist.There is no need to enter all the details on the website of etender.up.nic.in as BidAssist helps you find the specific Punjab etender you're looking for. Read further to learn how to search and bid for etender Punjab.

Bharat Sanchar Nigam Limited - BSNL Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date28 Nov 2024
Closing Date7 Dec 2024
Tender Amount₹ 3,22,576 
Notes
Download

Costs

Summary

P/o Concrete Pole Inte Deowal Hsp

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Provision of Concrete Poles with barbed wire fencing in place of fallen/damaged /Tilted front Compound wall(Left from main Gate) and Construction of Right side Compound Wall of T.E Building Deowal under Hoshiarpur BA.
Provision of Concrete Poles with barbed wire fencing in place of fallen/damaged /Tilted front Compound wall(Left from main Gate) and Construction of Right side Compound Wall of T.E Building Deowal under Hoshiarpur BA. .
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc..

15

-

-

... More
Brick work with Cleaned F.P.S. bricks recovered from demolshing of brick work and supplied free of cost at site of work by the department in Cement mortar 1:6 (1Cement : 6 Coarse sand) in foundation and plinth complete as per the direction of Engineer-In-Charge.

12

-

-

... More
Brick work with Cleaned F.P.S. bricks recovered from demolshing of brick work and supplied free of cost at site of work by the department in Cement mortar 1:6 (1Cement : 6 Coarse sand) in superstructure above plinth level up to floor V level in all shapes and sizes complete as per the direction of Engineer-In-Charge.

3.5

-

-

... More
12 mm cement plaster of mix :

-

-

-

... More
1:6 (1 cement: 6 fine sand)

65

-

-

... More
15 mm cement plaster on the rough side of single or half brick wall of mix :

-

-

-

... More
1:6 (1 cement: 6 fine sand)

65

-

-

... More
6 mm cement plaster of mix :

-

-

-

... More
1:3 (1 cement: 3 fine sand)

15

-

-

... More
Finishing walls with Acrylic Smooth exterior paint of required shade :

-

-

-

... More
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm)

165

-

-

... More
Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.

-

-

-

... More
With cement mortar 1:4 (1 cement : 4 fine sand)

20

-

-

... More
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.

-

-

-

... More
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

1.5

-

-

... More
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.

-

-

-

... More
In cement mortar

15

-

-

... More
Removing mortar from bricks and cleaning bricks including stacking within a lead of 50 m (stacks of cleaned bricks shall be measured) :

-

-

-

... More
From brick work in cement mortar

7650

-

-

... More
Dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead.

45

-

-

... More
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.

20

-

-

... More
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading,transporting, unloading to approved municipal dumping ground or asapproved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved

5

-

-

... More
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.

-

-

-

... More
With G.I. barbed wire

1000

-

-

... More
Supplying at site pre cast pre stressed reinforced cemment concrete Standards post of mix 1:1.5:3 (1 cement : 1.5 coarsesand : 3 graded stone aggregate 12.5 mm nominal size) reinforced with 4 nos.carbonated steel wire 3 mm thick , including making holes @ 300 mm c/c for fixing the barbed wire & carriage at site etc. all complete as per direction of Engineer-in- charge .

-

-

-

... More
Size of post 2.44 x 0.10 x 0.10 M

30

-

-

... More
Fixing of RCC Standard Post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only used for barbed wire with horizontal lines and diagonal lines etc. complete in line and level after straightening and scaffolding etc. all complete as per the directions of Engineer in Charge..(Note :- Cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :-

30

-

-

... More
Providing and fixing SS nuts, hooked bolts and washers for fixing the barbed wire in horizontal lines of approved dia. etc. all complete as per the directions of Engineer-in-Charge.

30

-

-

... More
Dismantling and refixing of existing angle iron post 50x50x5 mm ( Lenght upto 2.20 M) on top of Compound wall in line and level after straightening includung welding where ever required and scaffolding etc. all complete as per the directions of Engineer in Charge ( Note :- Angle iron post will be supplied by the department free of cost and cement concrete blocks shall be paid for seperately).

10

-

-

... More
Credit for old unserviceable and rusted barbed wire and MS angles received after dismantling

100

-

-

... More
Credit for old unserviceable bricks received after dismantling.

200

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.