Tamil Nadu Generation And Distribution Corporation Limited Tender

View complete overview of Puducherry TANGEDCO Tender

Tamil Nadu Generation And Distribution Corporation Limited - TANGEDCO Tender

Eprocure
Opening Date12 Mar 2020
Closing Date21 May 2020
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
RCC. 1:1 1/2:3 mix using 12 mm to 20mm HBS metal(machine crushed) for cable duct wall with formwork including cost of all labour, materials, water charges, lead, lift, etc, complete. But excluding cost fo steel reinforcement (by using mixer machine).

18

-

-

... More
RCC. 1:1 1/2:3 mix using 12 mm to 20mm HBS metal(machine crushed) for cable duct cover slab with formwork including cost of all labour, materials, water charges, lead, lift, etc, complete. But excluding cost fo steel reinforcement (by using mixer machine).

4

-

-

... More
Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.

5475

-

-

... More
PCC 1:3:6, using 20mm HBG metal foundation without form work including cost of cement, all materials,water charges, labour, lead, lift, etc. complete.

94

-

-

... More
PCC 1:2:4, using 20mm HBG metal foundation without form work including cost of cement, water charges, all materials, labour, lead, lift, etc. complete.

39

-

-

... More
PCC 1:2:4, using 20mm HBG metal foundation with form work including cost of cement, all materials, labour, lead, lift, etc. complete.

98

-

-

... More
Supply & Fabrication, Transport & fixing of GI angles for cable duct with anchorage and placing in position as directed by the engineer at site including cost of angles,cutting and all labour, lead, lift, etc. Complete

238

-

-

... More
Plastering with CM. 1:3 mix 12mm thick for ceiling,fol, bath, RCC pillars, sunshade, loft, etc., including cost of materials, labour, water charges, lead, lift, watering, curing, etc., complete.

268

-

-

... More
Supply and spreading of quarry dust inside the yard as per std. spec.including cost of materials ,labour lead,lift etc.complete.

161

-

-

... More
Supply and apreading of 12-20mm of HB stone inside the yard as per std. spec.including cost of materials ,labour lead,lift etc

161

-

-

... More
Colour washing two coats with approved qulity of colour pigments over one coat of white cement including cost of all materials , labour lead and lift etc complete.

242

-

-

... More
Supplying and laying PVC pipe 110 mm outer dia 6kg/ cm2 ISI make for laying the sewer line including cost of pvc pipe coupling lbour for cutting laying fixing tighting etc including earth work excavation and refilling trench etc complete

18

-

-

... More
Collection, supplying, stacking and spreading & filling of red gravel including compaction,cost of all materials lead lift labour etc complete as per the direction of site engineer.

723

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.