Puducherry Power Corporation Limited Tender

View complete overview of Puducherry PPCL Tender

Puducherry Power Corporation Limited - PPCL Tender

Services
Civil And Construction
Civil Works Others
Building Construction
Eprocure
Opening Date19 Sep 2022
Closing Date2 Nov 2022
Tender Amount₹ 26,57,400 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

C114 Reconstruction Of Quarters Compound Wall In Residential Area Of Ppcl, T.r.pattinam, Karaikal

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
code No;4.1.10 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40mm nominal size

17

-

-

... More
code No;5.1.2 Providing and laying in position specified grade of reinforced cement concrete , excluding the cost of centering , Shuttering , finsishing and reinforcement - All work upto plinth level 1:1.5:3 (1cement: 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)

20

-

-

... More
code No;5.9.5 Centering and shuttering including strutting , propping etc and removal of form for - Lintels , beams , plinth beams , girders , bressumers and catilevers

120

-

-

... More
code No;5.22.6 Steel reinforcement for R.C.C.work including straightening, cutting, bending, placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars (TISCON / VIZAG / IISCO / SAIL / JSW) Fe - 415 or more

5715

-

-

... More
code No;6.1.2 Brick work with common burnt clay F.P.S. (non modular ) bricks of class designation 3.5 in foundation and plinth in - cement mortar 1:6 (1 cement : 6 coarse sand)

18

-

-

... More
code No;6.4.2 Brick work with common burnt clay F.P.S (non modular ) bricks of class designation 3.5 in superstructure above plinth level upto floor five level in all shapes and sizes in - cement mortar 1:6 ( 1 cement : 6coarse sand)

110

-

-

... More
code No;13.4.1 12 mm cement plaster of mix 1:4 (1 cement :4 course sand)

600

-

-

... More
code No;13.5.1 15mm cement plaster on rough side of single or half brick wall of mix - 1:4 (1 cement : 4 coarse sand)

590

-

-

... More
code No;13.39.2 Colour washing such as green, blue or buff to give an even shade - New work (two or more coats) with a base coat of whiting

1190

-

-

... More
code No;15.2.2 Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead - nominal concrete 1:4:8 or leaner mix (including equivalent design mix)

28

-

-

... More
code No;15.7.4 Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead - in cement mortar

125

-

-

... More
code No;20.2.1 Boring, providing and installing bored cast-in-situ reinforced cement concrete pile of specified diameter and length below the pile cap 1:1.5:3 in cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with, bentonite solutions and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc., all complete, including removal of excavated earth with all lifts and leads (length of pile for payment shall be measured up to bottom of pile cap).300mm dia. piles.

255

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.