Puducherry Power Corporation Limited Tender
View complete overview of Puducherry PPCL Tender
Puducherry Power Corporation Limited - PPCL Tender
Civil And Construction
Pipe Line Project
Eprocure
Opening Date4 Aug 2023
Closing Date8 Sep 2023
Tender Amount₹ 5,14,480 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 10,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Z-047 Corroded Pipelines Replacement In Plant Area
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_PPCL_13402_1Bid Award Id
ViewTender No
Z-047 Corroded Pipelines Replacement in Plant AreaTender Authority
Puducherry Power Corporation Limited ViewPurchaser Address
-Website
http://http://ppclgov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Z-047 Tender Document for the Works of Corroded Pipelines Replacement in PPCL Power Plant Area
BOQ Items
Steam-Turbine Generator area Lubrication oil cooler Cooling water line 6 inch inlet pipe line to LUB oil cooler near Ejector about 4 meter long with 1 number of 4 ” elbow and one 4 inch Tee at a height of 2 meter floor level to be replaced.
1
-
-
Steam-Turbine Generator Air-cooler Cooling water line 4 inch inlet pipe line to Generator cooler control room side about 2 meter long with 1 number of 4 ” elbow at a height of 2 meter floor level to be replaced.
1
-
-
Gas Turbine Erection of New water filter system GT lub oil cooler with modification of pipe line ( Both inlet and outlet pipe line), valves, bellows, flanges, etc as per instruction of Engineer In-charge and as per the layout of drawing enclosed.
1
-
-
Gas Turbine Generator cooler Generator cooler from wall entry point to Generator – complete set of inlet and outlet pipe line 6 inch with bends, bellows and fittings to be replaced by new and also to be rerouted as per instruction of engineer in-charge. Refer drawing -3.
1
-
-
Steam turbine oil system AOP and EOP discharge pipe line NRV (3 inch and 4 inch) providing by modification of discharge line by providing fabricated distance pieces with flanges suitable for existing system.
1
-
-
Gas Booster Compressor (GBC)
GBC1,3,4 cooling water inlet line 4 inch pipe line each 6 meters with elbow and fittings as per the existing system to be replaced as per instruction of Engineer in-charge.
1
-
-
Gas Booster Compressor (GBC)
GBC 2,3,5 cooling water outlet line 4 inch pipe each 6 meters with elbow and fittings as per the existing system to be replaced as per instruction of Engineer in-charge.
1
-
-
Gas Booster Compressor (GBC)
GBC 1,2 and 3 Gas discharge pipe line rerouting in order to remove inter cooler tube bundle without disturbing the intercooler shell as per instruction of Engineer in -charge. Refer GA drawing no-2. Needs IBR welder with NDT testing (Radiography test)
1
-
-
Instrument Air Compressor (IAC)
Cooling water inlet 3 inch pipe line of 24 meter with 2 elbows to be replaced near raw water pump house pipe rack.
1
-
-
Cooling Water Pump House (CWPH)
Cooling water pump discharge header line 3 inch inter connection line about 6 meter with elbow 2 nos and tee one no. to be replaced.
1
-
-
Auxiliary Cooling Water Pump House (ACWPH)
Auxiliary Cooling water pump-1 suction rubber bellow to be provided with flanges as per the instruction of engineer in –charge and pump suction and discharge line 1 meter length to be replaced.
1
-
-
Cooling Water Pump Number-1 (CWP-1)
Discharge Swing check valve fixed in CWP system to be removed by cutting and welding. New valve to be installed by cutting and welding.
1
-
-