Puducherry Power Corporation Limited Tender

View complete overview of Puducherry PPCL Tender

Puducherry Power Corporation Limited - PPCL Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date4 Aug 2023
Closing Date8 Sep 2023
Tender Amount₹ 5,14,480 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Z-047 Corroded Pipelines Replacement In Plant Area

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Steam-Turbine Generator area Lubrication oil cooler Cooling water line 6 inch inlet pipe line to LUB oil cooler near Ejector about 4 meter long with 1 number of 4 ” elbow and one 4 inch Tee at a height of 2 meter floor level to be replaced.

1

-

-

... More
Steam-Turbine Generator Air-cooler Cooling water line 4 inch inlet pipe line to Generator cooler control room side about 2 meter long with 1 number of 4 ” elbow at a height of 2 meter floor level to be replaced.

1

-

-

... More
Gas Turbine Erection of New water filter system GT lub oil cooler with modification of pipe line ( Both inlet and outlet pipe line), valves, bellows, flanges, etc as per instruction of Engineer In-charge and as per the layout of drawing enclosed.

1

-

-

... More
Gas Turbine Generator cooler Generator cooler from wall entry point to Generator – complete set of inlet and outlet pipe line 6 inch with bends, bellows and fittings to be replaced by new and also to be rerouted as per instruction of engineer in-charge. Refer drawing -3.

1

-

-

... More
Steam turbine oil system AOP and EOP discharge pipe line NRV (3 inch and 4 inch) providing by modification of discharge line by providing fabricated distance pieces with flanges suitable for existing system.

1

-

-

... More
Gas Booster Compressor (GBC) GBC1,3,4 cooling water inlet line 4 inch pipe line each 6 meters with elbow and fittings as per the existing system to be replaced as per instruction of Engineer in-charge.

1

-

-

... More
Gas Booster Compressor (GBC) GBC 2,3,5 cooling water outlet line 4 inch pipe each 6 meters with elbow and fittings as per the existing system to be replaced as per instruction of Engineer in-charge.

1

-

-

... More
Gas Booster Compressor (GBC) GBC 1,2 and 3 Gas discharge pipe line rerouting in order to remove inter cooler tube bundle without disturbing the intercooler shell as per instruction of Engineer in -charge. Refer GA drawing no-2. Needs IBR welder with NDT testing (Radiography test)

1

-

-

... More
Instrument Air Compressor (IAC) Cooling water inlet 3 inch pipe line of 24 meter with 2 elbows to be replaced near raw water pump house pipe rack.

1

-

-

... More
Cooling Water Pump House (CWPH) Cooling water pump discharge header line 3 inch inter connection line about 6 meter with elbow 2 nos and tee one no. to be replaced.

1

-

-

... More
Auxiliary Cooling Water Pump House (ACWPH) Auxiliary Cooling water pump-1 suction rubber bellow to be provided with flanges as per the instruction of engineer in –charge and pump suction and discharge line 1 meter length to be replaced.

1

-

-

... More
Cooling Water Pump Number-1 (CWP-1) Discharge Swing check valve fixed in CWP system to be removed by cutting and welding. New valve to be installed by cutting and welding.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.