Puducherry Adidravidar Development Corporation Limited Tender
View complete overview of Puducherry Puducherry Adidravidar Development Corporation Limited Tender
Puducherry Adidravidar Development Corporation Limited Tender
Eprocure
Opening Date5 Feb 2019
Closing Date14 Feb 2019
Tender Amount₹ 27,26,269
Costs
EMD
₹ 54,525Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_PADCO_4444_1Bid Award Id
ViewTender No
2330/PADCO/EW/2018-19/1Tender Authority
Puducherry Adidravidar Development Corporation Limited ViewPurchaser Address
-Website
http://pudutenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Code no: 4.92A Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type A 13.2mm stone for screening and gravel for binding to fill up the interstices of coarse aggregate, watering and compacting to the required density - by manual means - Water bound macadam Gr-II with stone creening 13.2mm metal. (As per MoRTH specification, 4th Revision)
284
-
-
Code no: 5.1(Corrigendum) Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of
0.60 kg/sqm using mechanical means. (As per MoRTH specification, 4th Revision
3150
-
-
Code no: 5.2(Corrigendum) Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg. per sqm. on the prepared bituminous / granular surface cleaned with mechanical broom. (As per MoRTH specification, 4th Revision)
3150
-
-
Code no: 5.3A(Corrigendum) Providing and laying bituminous macadam with hot mix plant of capacity not less than 40 to 60 TPH using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 507.7 of MoRTH
specification, 4th Revision, to achieve the desired compaction.- Using grade I metal and bitumen 60/70 grade.
158
-
-
Code no: 5.7A(Corrigendum) Providing and laying semi-dense bituminous concrete with HMP of capacity not less than 40 - 60 TPH using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 508 of MoRTH
specification, 4th Revision, complete in all respects - Using grade-I material and bitumen 60/70 grade.
79
-
-
Code no: 6.1.MO Cleaning the existing W.B.M. road surface including removing of binding material and other foreign matter with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous treatment. As per clause no 502.4.2 and 503.3.1 of MOST specification.
3150
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements