Public Works Department Tender
View complete overview of Puducherry PWD Tender
Public Works Department - PWD Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date4 Feb 2025
Closing Date11 Feb 2025
Tender Amount₹ 12,70,213
Costs
EMD
₹ 25,404Document Cost
₹ 525Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWDC3_17566_1Bid Award Id
ViewTender No
27-06/PW/BRK/2024-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwd.py.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Reinforced cement concrete work in walls (any thickness) , including attached pilasters, buttresses , plinth and sting courses , fillets , columns , pillars , piers , abutments , posts and struts etc. upto floor five level excluding cost of centering , shuttering , finishing and reinforcement - 1:1.5:3 (1 cement : 1.5 fine aggregate : 3 graded stone aggregate 20mm nominal size)
5
10519
52597
... More
Centering and shuttering including strutting , propping etc and removal of form for - Lintels , beams , plinth beams , girders , bressumers and catilevers
52.5
719
37776
... More
Centering and shuttering including strutting , propping etc and removal of form for - Columns , Pillars , Piers , Abutments , Posts and Struts
62
996
61779
... More
Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete above plinth level - Thermo - Mechanically Treated bars Fe - 500D or more
600
114
68616
... More
Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars Fe - 500D or more
1800
114
205848
... More
Brick work with common burnt clay F.P.S (non modular ) bricks of class designation 3.5 in superstructure above plinth level upto floor five level in all shapes and sizes in - cement mortar 1:6 ( 1 cement : 6 fine aggregate)
31
10684
331210
... More
12mm cement plaster of mix -1:6 ( 1 cement : 6 fine aggregate)
134
329
44142
... More
15mm cement plaster on the rough side of single or half brick wall of mix - 1:6 (1cement : 6 fine aggregate)
134
380
51026
... More
6mm cement plaster of mix 1:3 (1 cement : 3 fine aggregate)
91
283
25837
... More
Finishing walls with acrylic smooth exterior paint of required shade - New work (two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre / 10 sqm
350
155
54387
... More
Boring , providing and installing bored cast -in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring , with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc, by percussion drilling using direct mud circulation (DMC) or bailer and chisel technique by tripod and mechanical winch machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured upto bottom of pile cap) - 450 mm dia piles - Note: Truck Mounted rotary/TMR/Tubewell boring machine shall not be used
95
2434
231300