Public Works Department Tender

View complete overview of Puducherry PWD Tender

Public Works Department - PWD Tender

Works
Agriculture or Forestry Works
Eprocure
Opening Date9 Mar 2024
Closing DateCancelled
Tender Amount₹ 6,36,71,554 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Collection and supply of stone boulders at Various weights including the charges for conveyance , pre - weighing the loaded vehicles and post - weighing the empty vehicle and placing the boulders to the required slope and section by using suitable machinery including handling and packing charges ,crane charges etc., complete . The payment will be made based on weight basis. The quantity will be counter checked by way of volumes computed based on pre-levels and post-levels of the section and the volume thus computed will be arrived in weight after reducing for the corresponding voids depending on the size of stone boulders . This rate shall include the costs of formation of approach track for transportations of materials men and machinery for the placing and dumping the boulders in position for groins / sea protection wall / rock revetment as per sectional drawing and harbouring works also etc., complete. The specific gravity of stone shall be from 2.90 to 3.02. Armour layer after deducting 40% voids. Using 1.25 tonne to 2.00 tonne

3850

-

-

... More
Providing Armour layer of rubble Mounded Breakwater with 1 T weighing Tetrapods, Conveying in contractors transport Including Preweighing and post weighing for purpose of measurement and dumping into sea with required width and side slopes with necessary equipment and devices as per the drawings and specification .

530

-

-

... More
Nourishing of sand between the groynes From Puducherry port to Pillaichavady. The rate includes transportation loading and unloading, spreading and leveling etc Complete and as directed by Engineer in Charge

100000

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.