Public Works Department Tender

View complete overview of Puducherry PWD Tender

Public Works Department - PWD Tender

Works
Civil And Construction
Solid Waste Management
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date9 Oct 2024
Closing Date7 Nov 2024
Tender Amount₹ 1,95,88,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Attending following repair and service inMain Pumping Station as detailed below:- A. Removing the existing submersible pumps from the MPS, servicing the same to put the pump in operating condition and installation at the same location – 2 Nos B. Removing the existing control panels, supply & installation of new set of VFD control panels suitable for 40 HP submersible pumps, input connections with the existing cables complete work as per the site requirement – 6 Nos C. Supply and installation of Junction box with pump control devices for connecting with pump and control panel including cables –6Sets.

1

-

-

... More
Attending following repair and service inMechanical Fine Screen as detailed below:- A. Servicing the existing fine screens with the authorized service person and put the same in good operation condition – 2 Nos B. Repairing the existing inlet Gates and put the same in good operation condition – 3 Nos C. Supply and installation of new conveyor belt to suit the existing conveyor system and put the same in operating condition – 1 No D. Supply and installation of new Local push button -3 Nos

1

-

-

... More
Attending following repair and service inGrit Mechanism as detailed below:- A. Removing the sludge & grit at the Grit Mechanism tank and cleaning the same at site- 2 Nos B. Repair / Service the grit mechanism and put the same in operating condition at site including if any spare parts requirement- 2 Nos

1

-

-

... More
Attending following repair and service in Chlorination System as detailed below:- A. Testing of existing chlorine gas cylinders and filling of chlorine gas including transport expenses - 3 Nos B. Replacing the existing copper tubes with new copper tube and installation of the same – 2 Nos C. Supply and installation of new gas leak sensor for sensing the chlorine gas leak- 2 Nos D. Servicing of the existing EOT system and put the same in good operating system at site – 1 No E. Service/ Repair of the full chlorination system, replacement of spare parts if anything required and put the same in good operation condition- 2 Nos F. Repair / Service of existing Booster pump and put the same in operating condition – 1 No G. Repair / Service of existing Blower and put the same in operating condition-2 Nos H. Repair of the existing electrical control panel including replacement of missing components and put the same in operating condition – 1 No zzzzzzzzzz F. D. Servicing of the existing EOT system and put the same in good operating system at site – 1 No A. Service/ Repair of the full chlorination system, replacement of spare parts if anything required and put the same in good operation condition- 2 Nos B. Repair / Service of existing Booster pump and put the same in operating condition – 1 No C. Repair / Service of existing Blower and put the same in operating condition-2 Nos D. Repair of the existing electrical control panel including replacement of missing components and put the same in operating condition – 1 No

1

-

-

... More
Attending following repair and service inTreated Water Pump as detailed below:- A. Removing the existing control panels, supply & installation of new set of VFD control panels suitable for the submersible pumps includingpump protection devices, input connections with the existing cables complete work as per the site requirement – 2 Nos

1

-

-

... More
Attending following repair and service inTreated Water Pump as detailed below:- A. Supply and installation of condensers for the capacitor panel 250 KVAR– 1 No

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.