Public Works Department Tender
View complete overview of Puducherry PWD Tender
Public Works Department - PWD Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date22 Jan 2025
Closing Soon3 Feb 2025
Tender Amount₹ 9,10,357
Costs
EMD
₹ 18,208Document Cost
₹ 525Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWDC3_17365_1Tender No
23-03/IPH/TN/2024-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://pudutenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supply of Quarry rubbish including stacking to department gauge for premeasurement and spreading required thickness
3
1367
4104
... More
Plain cement concrete m-15 mix with stone aggregates 20mm nominal size mechanically mixed and vibrated in foundation upto a depth of 1.50 metres below ground level and/or 1.50 metres above ground/bed level.
9
7767
69910
... More
Reinforced cement concrete M30 mix with minimum cement content 450 kg /cum using stone aggregate 20 mm nominal size mechanically mixed and vibrated for reinforced concrete work in slab excluding steel reinforcement, but including centering and shuttering, laid in position.
15
12774
191623
... More
Reinforced Cement Concrete in substructure complete as per drawing and technical specification -RCC Grade M30 with a minimum cement content 407 kg / cum upto 5m height - Using concrete mixer (Formwork-10%)
6.5
10073
65480
... More
Providing and laying cement concrete wearing coat M30 grade with a minimum cement content 405 kg / cum including reinforcement complete as per drawing and technical specification
1.2
18127
21753
... More
Steel reinforcement for R.C.C. works including bending, binding and placing in position - Thermo Mechanical Treated Bars Fe - 415 or more
3.1
108370
335948
... More
Centring and shuttering including strutting, propping etc. and removal of form work for - retaining walls, return walls, walls any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
32
870
27858
... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns,piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc. upto floor five level, excluding the cost of centering ,shuttering and finishing - 1:3:6 (1 cement : 3 fine aggregate : 6 graded stone aggregate 20mm nominal size)
10
8917
89178
... More
Providing and fixing 110 mm dia PVC pipes (4kg / cm2) in weep holes including cement concrete 1:5:10 (one cement : 5 sand : 10 graded stone aggregate ) and filling of pebbles etc.,
6
336
2018
... More
Providing and filling in foundation trenches and at the back of abutments, wing walls etc. and below pipe bed in layers not exceeding 150mm thick including watering and compacting including all lead and lifts. - Selected granular material in filling.
8.5
2739
23287
... More
Providing and laying unscreened Gravel boulders to a specified consolidated thickness for sub base course including stacking of the materials to the departmental gauge on road side for pre measurement. The volume of stack calculated as per actual measurement shall be reduced by 15% for looseness in stacking to arrive at the net quantity. The rate including labour charges for spreading and hand packing to the required camber and graded and rolling with power roller hire and fuel charges for all tools and plants employed and the cost of boulders etc., complete as directed by the Engineer-in-charge.
9
922
8304
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%