Opening Date22 Aug 2024
Closing Date29 Aug 2024
Tender Amount₹ 41,01,646
Costs
EMD
₹ 82,033Document Cost
₹ 525Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDC1_16394_1Bid Award Id
ViewTender No
03/PW/EE/BRN/2024-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://pudutenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and laying bituminous macadam with hot mix plant of capacity not less than 40 -60 TPH using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 507.7 of MoRTH specification, 4th Revision, to achieve the desired compaction. - using grade II metal and bitumen 60/70 grade.
178
-
-
Providing and laying bituminous concrete with HMP of capacity not less than 40 to 60 TPH using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 509 of MoRTH specification, 4th Revision, complete in all respects - Using grade-II material.-Bitumen 60/70
107
-
-
Cement concrete 1:3:6 mix with stone aggregates 20mm nominal size mechanically mixed and vibrated in foundation upto a depth of 1.5 metres below ground level and 1.5 metres ground/bed level.
50
-
-
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc .complete - 40mm thick with 20mm nominal size stone aggregate
545
-
-
Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead - nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
12
-
-
Scarifying the existing granular road surface to a depth of 50mm and disposal of scarified material within all lifts and leads upto 1000 metres - by manual means.
3300
-
-
Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m - all kinds of soil
9
-
-
Supply of Quarry rubbish including stacking to department gauge for premeasurement and spreading required thickness
2
-
-
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size)
2
-
-
Centring and shuttering including strutting, propping etc. and removal of form work for - foundations, footings, bases for columns
630
-
-
Steel reinforcement for R.C.C. Works including bending, binding and placing in position - Thermo Mechanical Treated Bars (ISI brand approved make) Fe - 415 or more
0.1
-
-
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5m
3
-
-
Cement plaster 12mm thick in cement mortar 1:3
620
-
-
Providing, hoisting and fixing precast RCC cover slabs for drain (upto plinth level) of lengh varying upto 1.80m and varying thickness from 100mm to 20mm including the cost of required centering, shuttering and finishing smooth with neat cement punning on exposed surface but excluding cost of reinforcement with 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggretate 20mm nominal size). The rate is inclusives of all taxes.