Civil And Construction
Building Construction
Eprocure
Opening Date24 Dec 2024
Closing Date2 Jan 2025
Tender Amount₹ 5,78,406
Costs
EMD
₹ 11,568Document Cost
₹ 525Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDC3_17201_1Tender No
20-04/PW/BRK/2024-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwd.py.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying in position specified grade of reinforced cement concrete , excluding the cost of centering , shuttering , finsishing and reinforcement - All work upto plinth level 1:1.5:3 (1cement : 1.5 fine aggregate : 3 graded stone aggregate 20 mm nominal size)
5
9236
46185
... More
Reinforced cement concrete work in walls (any thickness) , including attached pilasters, buttresses , plinth and sting courses , fillets , columns , pillars , piers , abutments , posts and struts etc. upto floor five level excluding cost of centering , shuttering , finishing and reinforcement - 1:1.5:3 (1 cement : 1.5 fine aggregate : 3 graded stone aggregate 20mm nominal size)
2
10519
21039
... More
Centering and shuttering including strutting , propping etc and removal of form for - Lintels , beams , plinth beams , girders , bressumers and catilevers
33
719
23745
... More
Centering and shuttering including strutting , propping etc and removal of form for - Columns , Pillars , Piers , Abutments , Posts and Struts
26
996
25907
... More
Steel reinforcement for R.C.C.work including straightening, cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars Fe - 500D or more
940
114
107498
... More
Brick work with common burnt clay F.P.S (non modular ) bricks of class designation 3.5 in superstructure above plinth level upto floor five level in all shapes and sizes in - cement mortar 1:6 ( 1 cement : 6 fine aggregate)
12
10684
128210
... More
12mm cement plaster of mix -1:4 ( 1 cement : 4 fine aggregate)
63
343
21618
... More
15mm cement plaster on the rough side of single or half brick wall of mix - 1:4 (1cement : 4 fine aggregate)
55
397
21845
... More
6mm cement plaster of mix 1:3 (1 cement : 3 fine aggregate)
20
283
5678
... More
Finishing walls with textured exterior paint of required shade - New work (Two or more coats applied @ 3.28 ltr / 10 sqm) over and including priming coat of exterior primer applied @ 2.20 kg / 10 sqm
125
234
29341
... More
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.- in cement mortar
20
1903
38074
... More
Boring , providing and installing bored cast -in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring , with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc, by percussion drilling using direct mud circulation (DMC) or bailer and chisel technique by tripod and mechanical winch machine all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured upto bottom of pile cap) - 450 mm dia piles - Note: Truck Mounted rotary/TMR/Tubewell boring machine shall not be used
40
2435
97430
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%