Public Works Department Tender

View complete overview of Puducherry PWD Tender

Public Works Department - PWD Tender

Works
Civil And Construction
Excavation
Eprocure
Opening Date6 Mar 2024
Closing Date11 Mar 2024
Tender Amount₹ 9,95,335 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Drilling of borewell any where in Pondicherry including transportations in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, construction of mud pit (water available within a lead of 1.5Km) using rotary rig. -From 120mts and upto 150 mts. depth ending below ground level.

30

-

-

... More
Drilling of borewell any where in Pondicherry including transportations in alluvial soil, sedimentary strata of clay,sand stone, shale, pebbles, boulders etc. by first taking a pilot bore of 140mm / 150mm / 200mm and then enlarging to required dia by direct or reverse rotary mud circulation method,including fuel, labour for drilling, bentonite mud, water required for drilling at the site, construction of mud pit (water available within a lead of 1.5Km) using rotary rig. -From 150mts and upto 180 mts. depth ending below ground level.

30

-

-

... More
Reaming from 140/150 mm dia pilot bore to 300mm dia bore. Upto 60 mts depth ending below ground level.

60

-

-

... More
Reaming from 140/150 mm dia pilot bore to 300mm dia bore. From 60 mts and upto 90 mts depth ending from ground level

30

-

-

... More
Reaming from 140/150 mm dia pilot bore to 300mm dia bore. From 90 mts and upto 120 mts depth ending from ground level

30

-

-

... More
Reaming from 140/150 mm dia pilot bore to 300mm dia bore. From 120 mts and upto 150 mts depth ending from ground level

30

-

-

... More
Reaming from 140/150mm dia pilot bore to 300mm dia bore.From 150 mts and upto 180 mts depth ending from ground level.

30

-

-

... More
Reaming from 300 mm dia pilot bore to 400/450mm dia. Upto 60 mts depth ending below ground level.

60

-

-

... More
Reaming from 300mm dia pilot bore to 400/450mm dia bore. From 60 mts and upto 90 mts depth ending below ground level

30

-

-

... More
Reaming from 300mm dia pilot bore to 400/450mm dia bore. From 90 mts and upto 120 mts depth ending below ground level

30

-

-

... More
Reaming from 300mm dia pilot bore to 400/450mm dia bore. From 120 mts and upto 150 mts depth ending below ground level

30

-

-

... More
Reaming from 300mm dia pilot bore to 400/450mm dia bore .From 150 mts and upto180 mts depth ending below ground level.

30

-

-

... More
Charges for developing the borewells with air compressor of 600 CFM capacity (minimum 8 hours) including transportation labour and fuel charges for compressor and conducting yield test by "V" Notch methods.

10

-

-

... More
Supplying of UPVC plain casing pipe for borewells (Finolex /Jain / Supreme / True bore / Nandi) conforming to I.S. 12818 -1992 with relevent amendments with class designation 'CM' and with minimum wall thickness 10mm including transportation and stocking at site -200mm dia

150

-

-

... More
Supplying of UPVC ribbed screen slotted pipe for borewells (Finolex /Jain / Supreme / True bore / Nandi) conforming to IS 12818 -1992 with relevent amendments with class designation 'RS' and with minimum wall thickness 10mm including transportation and stocking at site - 200mm dia

30

-

-

... More
Lowering of UPVC plain casing pipe / ribbed screen slotted pipes into the borewell including cost of cleaning material, fixing of M.S centering guide size of 25mm x 3mm thick suitable for 200mm dia UPVC pipe, including cost of labour for positioning of assembly for lowering purpose using rig.

60

-

-

... More
Supplying transportation and packing of 8mm size down gauge graded pebbles including filling the annular space gradually complete. The pebbles disintegrated pieces. should be free from any disintegrated pieces.

4

-

-

... More
Supplying,transporting and packing of clay balls including filling the annular space gradually complete. The clay balls should be free from any sand particles.

12

-

-

... More
Providing and fixing M.S. top cover suitable for UPVC pipes including the cost of materials and labour etc.

1

-

-

... More
Providing and fixing of UPVC End Cap embedded in M.S. Cone suitable for UPVC casing pipe including the cost of materials and labour for jointing.

1

-

-

... More
Conducting electrical logging for the tube well of any depth after pilot drilling with electrical logger. The rate included technical person to conduct electrical logging at site transportation (to and fro) of the logger to site etc. complete

1

-

-

... More
Supplying and filling with gravel (excluding rock) in trenches , plinth, sides of foundations etc . In layers not exceeding 20 cm in depth consolidating each deposited layers by ramming and watering etc .complete including all lead and lift

71

-

-

... More
Surface dressing of the ground including removing vegetation and in - equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m - all kinds of soil

282

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.