Public Works Department Tender
View complete overview of Puducherry PWD Tender
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date8 Feb 2024
Closing Date19 Feb 2024
Tender Amount₹ 76,29,199
Costs
EMD
₹ 1,52,584Document Cost
₹ 1,050Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDC1_15237_1Bid Award Id
ViewTender No
81/PW/EE/BRN/2023-24Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://pudutenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg. per sqm. on the prepared bituminous / granular surface cleaned with mechanical broom. (As per MoRTH specification, 4th Revision)
21210
-
-
Providing and laying bituminous macadam with hot mix plant of capacity not less than 40 -60 TPH using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 507.7 of MoRTH specification, 4th Revision, to achieve the desired compaction. - using grade II metal and bitumen 60/70 grade.
531
-
-
Providing and laying bituminous concrete with HMP of capacity not less than 40 to 60 TPH using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 509 of MoRTH specification, 4th Revision, complete in all respects - Using grade-II material.-Bitumen 60/70
320
-
-
Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes.
515
-
-
Supplying and filling with gravel (excluding rock) in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes capacity including all leads and lift (Payment will be made based on level measurement)
420
-
-
Providing and fixing of retro - reflectorised cautionary, mandatory & informatory sign as per IRC:67 made of aluminium sheet encapsulated lens with high intensity grade sheeting vide Clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm X 75 mm X 6 mm ( 3.5 mtrs height - 6.8kg/mtr = 23.8kg , with board support angle 35x35x6mm-2.30 mtrs - 3kg/mtr = 6.9kg and anchor flat - 0.5kg)firmly fixed to the ground by means of properly designed foundation with M15 Grade cement concrete 45 cm X 45 cm X 60 cm , 60cm below ground level as per approved drawing. - 60 cm equilateral triangle . (including cost of angle iron towards cost of drilling holes, nuts , bolts etc.,)
12
-
-
Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of aluminium sheet encapsulated lens reflective (diamond grade sheet) with high intensity grade heeting vide Clause 801.3, fixed over aluminium sheeting, 2mm thick with area not exceeding 0.9sqm supported on a mild steel single angle iron post 75 X 75 X 6mm (3.9mtrs height - 6.8kg/mtr = 26.52kg ,with
board support angle 35x35x6mm - 3.8mtrs - 3kg/mtr = 11.40kg and anchor flat 0.50kg )firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 X 45 X 60 cm, 60cm below ground level.
3.5
-
-
Providing and fixing 3m make reflective road studs of category 'A' raised pavement markers made out of poly carbonate/ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromaticity values conforming to ASTM D4280. The reflective raised pavement makers shall also confirm the length, height and width of the body shall be less than 100mm, 15mm and 90mm and base of marker shall be flat within 1.3mm (3m equivalent). The marker shall support a load of 13635Kg tested in accordance with ASTM D4280. Lenses shall be moulded of polycarbonate or methyl methecrylate conforming ASTM D788. The area of each retro reflectory surface shall not be less than 13.0 sq.cm. The slope or retro reflectory surface shall be 35+5 degree to base. Each reflector shall have a CIL not less values specified in table 1 of said MORTH circular and two cylindrical polymer shanks not less than 20mm diameter and not less than 30mm length shall be provided for better anchorage with bituminous grout or epoxy mortar all as per the MORTH.
144
-
-
Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres) including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections
100
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements