Public Works Department Tender
View complete overview of Puducherry PWD Tender
Public Works Department - PWD Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date22 Jan 2025
Closing Date3 Feb 2025
Tender Amount₹ 16,19,646
Costs
EMD
₹ 32,393Document Cost
₹ 525Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWDC3_17366_1Bid Award Id
ViewTender No
23-04/IPH/TN/2024-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://pudutenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level - 1:1.5:3 (1 cement : 1.5 fine aggregate : 3 graded stone aggregate 20mm nominal size)
42
8545
358926
... More
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
8
3454
27638
... More
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge in cement mortar
17
1903
32363
... More
Providing and fixing 110 mm dia PVC pipes (4kg / cm2) in weep holes including cement concrete 1:5:10 (one cement : 5 sand : 10 graded stone aggregate ) and filling of pebbles etc.,
6
336
2018
... More
Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as per direction of Engineer-in-charge, within a lead of 50m - all kinds of soil
65
279
18179
... More
Supplying and filling in plinth with river sand under floors, including watering, ramming consolidating and dressing complete
2
2639
5279
... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns,piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc. upto floor five level, excluding the cost of centering ,shuttering and finishing - 1:3:6 (1 cement : 3 fine aggregate : 6 graded stone aggregate 20mm nominal size)
21
8917
187273
... More
Centering and shuttering including strutting, propping etc and removal of form for - Walls (any thickness) including attached, pilasters, butteresses, plinth and string courses etc.
165
870
143641
... More
12mm cement plaster of mix -1:4 ( 1 cement : 4 fine aggregate)
165
343
56618
... More
Providing and laying unscreened Gravel boulders to a specified consolidated thickness for sub base course including stacking of the materials to the departmental gauge on road side for pre measurement. The volume of stack calculated as per actual measurement shall be reduced by 15% for looseness in stacking to arrive at the net quantity. The rate including labour charges for spreading and hand packing to the required camber and graded and rolling with power roller hire and fuel charges for all tools and plants employed and the cost of boulders etc., complete as directed by the Engineer-in-charge.
11
922
10149
... More
GST @ 18 for item No.13
1
1827
1827
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements