Public Works Department Tender
View complete overview of Puducherry PWD Tender
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date14 Jun 2024
Closing Date24 Jun 2024
Tender Amount₹ 6,94,287
Costs
EMD
₹ 13,886Document Cost
₹ 525Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDC2_15781_1Bid Award Id
ViewTender No
05/PW/SBDII/2024-25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://pudutenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size)
22
-
-
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level - 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40mm nominal size)
20
-
-
... More
Centring and shuttering including strutting , propping etc. and removal of form work for – retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
68
-
-
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering , shuttering , finishing and reinforcement - All work upto plinth level 1:1.5:3 (1cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size).
5
-
-
... More
Reinforced cement concrete work in walls (any thickness) , including attached pilasters, buttresses , plinth and string courses , fillets , columns , pillars , piers , abutments , posts and struts etc. upto floor five level excluding cost of centering , shuttering , finishing and reinforcement - 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size).
1.3
-
-
... More
Centering and shuttering including strutting , propping etc and removal of form for - Lintels , beams , plinth beams , girders , bressumers and cantilevers.
10
-
-
... More
Centering and shuttering including strutting , propping etc and removal of form for - Columns , Pillars , Piers , Abutments , Posts and Struts.
13
-
-
... More
Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars (ISI BRAND OF APPROVED MAKE) Fe - 415 or more
900
-
-
... More
Providing and placing M30 grade cover block for RCC work all levels
370
-
-
... More
Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete above plinth level - Thermo - Mechanically Treated bars (ISI BRAND OF APPROVED MAKE) Fe - 415 or more.
110
-
-
... More
Steel work in built up tubular (round,square or rectanglar hollow tubes etc.) trusses etc., including cutting , hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete - hot finished seamless type tubes.
1200
-
-
... More
Steel work welded in built up sections / framed work , including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required – in gratings, frames, guard bar, ladder, railings, brackets,gates and similar works.
650
-
-
... More
6mm cement plaster of mix -1:3 ( 1 cement : 3 fine sand).
25
-
-
... More
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead - in cement mortar.
7
-
-
... More
Disposal of Moorum / building rubbish / similar unserviceable dismantled or waste material by mechanical transport including loading, transporting unloading within a lead of 10km for all lifts, complete all as per the directions of Engineer-in-charge.
7
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements