Public Works Department Tender
View complete overview of Puducherry PWD Tender
Public Works Department - PWD Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date7 Mar 2024
Closing DateCancelled
Tender Amount₹ 8,67,809
Costs
EMD
₹ 17,356Document Cost
₹ 525Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDC2_15606_1Bid Award Id
ViewTender No
TN.42/PW/IRRN/2023-2024-5-CALLTender Authority
Public Works Department ViewPurchaser Address
-Website
http://https://pwd.py.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supplying and filling with quarry dust in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering etc. complete including all lead and lift.
17
-
-
Extra for providing and mixing ordinary Portland cement 43 grade of approved brand and manufacture in quary rubbish / stone dust at the rate of 3 bags of cement per cum of quary rubbish / stone dust mixing in a mechanical mixer. The rate is inclusive of all lead and lift etc., complete all as directed by the Engineer-in-charge.
17
-
-
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size)
17
-
-
Centring and shuttering including strutting , propping etc. and removal of form work for - foundations, footings, bases for columns
26
-
-
Centring and shuttering including strutting , propping etc. and removal of form work for - retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
200
-
-
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns,piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping,bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc. upto floor five level, excluding the cost of centering ,shuttering and finishing - 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size)
54
-
-
12mm cement plaster of mix -1:4 ( 1 cement : 4 fine sand)
340
-
-
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size)
5
-
-
Making of bund wall with HDPE cement bags filled with stone dust/quary rubbish for discharge regulation, breach closing/ diversion arrangement. The rate includes head load the cost of empty HDPE bags, cost of stone dust, labour charges for filling the bags and placing in position of its purpose working in or under foul/slush condition ,in or under water and / or liquid mud, including pumping out water as required all as directed by the Engineer-in-charge
300
-
-
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5m
20
-
-
Disposal of debris within a lead of 5Km radius, beyond initial lead od 50m and filling up in the low lying areas as directed by the Engineer - in- charge.
71
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements