Construction Of 6 Class Room Building In Gghss At Sithalampattu In Villupuram District.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying and filling of conveyed gravel by lorry in basement filling including stacking for premeasurement, conveyance loading and unloading charges and all other incidential charges and including filling laying watering and consolidating etc., complete as directed by the dept., Officers and complying with standard specification.

108.2

-

-

... More
Cement Concrete 1:5:10 (One Cement, Five M-sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification.

16.6

-

-

... More
Cement Concrete 1:5:10 (One Cement, Five M-sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification.

22.05

-

-

... More
Providing Pre construction Anti termite treatment for the building including all chemicals as per standard specifications. Labour charges for preparing the areas for treatment spraying chemicals and other incidential charges etc., complete. The rate shall be inclusive of giving anti-termite treatment to the building for the following four stages including breaking the termite mounds making holes with crow bars at an intervel of 12"to a depth of 8" in the periphery of building and pouring chemicals etc., complete as per ISI 6313-1981 and. The antitermite chemicals used should have 0.5% concentration with 3L solution for the entire operation etc. as directed by the Engineer incharge and including cost of chemicals labour transportion etc, Stage:1 Spraying Anti-termite treatement chemicals solution for the foundation before laying the foundation concrete bottom and sides of the foundation. Stage:2 Spraying anti-termite chemicals solution to the grade beams level spraying has to be done for the grade beams brick masonry in the superstructure in contact with back fill earth. Stage:3 Spraying anti-termite chemicals solution on sand for the flooring before laying the flooring concrete. The treatment has to be carried out on the sand filling the basement after leveling operation is over.

-

-

-

... More
Stage:4 Spraying anti-termite chemicals solution around the building outside of the building by making crow bar holes at an intervel of 12" to a depth of 8" around the building before laying the plinth projection. This holes has to be be closed after the treatment.

188.35

-

-

... More
Brick work in Cement Mortar 1:6 (One cement and Six M-sand) using best quality of Second Class Ground Moulded Chamber Burnt Bricks of size 9" x 4-3/8" x 2-3/4" for foundation and basement including curing, etc., complete complying with standard specification.

-

-

-

... More
For Foundation and Basement

54.4

-

-

... More
For Superstructure in Ground Floor

39.2

-

-

... More
For Superstructure in First Floor

40.7

-

-

... More
For Superstructure in Second Floor

51.4

-

-

... More
For Superstructure in Third Floor

16.9

-

-

... More
Brick partition walls of 11.50cm thickness using best quality Second Class Ground Moulded Chamber Burnt Bricks of size 9" x 4-3/8" x 2-3/4" in Cement Mortar 1:3 (One Cement and Three M-Sand) using hoop iron reinforcement if found necessary including curing etc. complete and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately)

-

-

-

... More
For Superstructure in Ground Floor

3.78

-

-

... More
For Superstructure in First Floor

3.78

-

-

... More
For Superstructure in Second Floor

3.78

-

-

... More
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)

114.6

-

-

... More
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at about 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)

-

-

-

... More
For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc.

882

-

-

... More
For plane surfaces such as rectangular or square RCC columns, sunshades, top and bottom slab of RCC boxing, etc.

415

-

-

... More
For Circular Columns.

13.65

-

-

... More
Providing and laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 350 kg/mᶾ and maximum water cement ratio of 0.50, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5.0 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m.) 7670 kg. of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. (No separate payment will be made by the Department for the excess usage of materials).

-

-

-

... More
For Foundation and Basement

43.75

-

-

... More
For Superstructure in Ground Floor

46.4

-

-

... More
For Superstructure in First Floor

43.5

-

-

... More
For Superstructure in Second Floor

45.45

-

-

... More
For Superstructure in Third Floor

7.8

-

-

... More
Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC 1:2:4 (one cement, two M-sand and four aggregates), using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed.

-

-

-

... More
50mm thick slab using 20mm HBGS jelly

40.2

-

-

... More
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification.(Contractor has to make his own arrangements for the supply of steel and binding wire)

236.41

-

-

... More
Paving the floor with best approved quality fine polished Kota stone slabs of size above 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M-sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.

390.1

-

-

... More
Paving the floor with Cement based Hydraulically pressed pattern design Antiskid tiles of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)

41.9

-

-

... More
Paving the floor (staircase steps) with kota stone of size below 600mm x 600mm x20 mm) design of 20mm thick of approved quality and colour laid in Cement Mortar 1:3 (One Cement and Three M-sand) 20mm thick and pointed with white cement mixed with colouring pigment at the rate of 0.40 Kg. / sq.m., curing, etc., complete.

138.7

-

-

... More
Supplying and fixing of unbreakable dust free, easy to erase, class room writing board of size 3.60mX1.20m made up 8mm thick green colour ceramic sheet pasted on the front side 12mm thick ply board and backside of ply board is pasted with flex board sheet the outer beading of the writing board will be fixed with aluminium hi section of size 25mm, the board will be fixed firmly on the wall using 3 inch screws the rates includes cost of all materials labour approved quality, etc., complete complying with standard specifications and as directed by departmental officers Excluding GST.

6

-

-

... More
Plain Cement Concrete 1:2:4 (one cement, two M-sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specifications and as directed by the departmental officers.

13.65

-

-

... More
Paving the Top of roof with Solar Reflective ceramic tiles (Required design) of 305x305x7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M-sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)

144.7

-

-

... More
Supplying and fixing in position best approved of BIS quality PVC rain water down fall pipes having a pressure of 4 kg/sq.cm including cost of necessry PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc., and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cast of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of "U" clamp at the centre of the pipe line in addition to those for more than 3 metre pipe length, etc., complete complying with standard specification.

-

-

-

... More
110mm dia PVC Pipe (Three Floors )

123

-

-

... More
Plastering with Cement Mortar 1:5 (One cement and Five M-sand), 12mm thick with Plasticizer in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.

1550

-

-

... More
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothly with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (water proof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (water proof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. (The rates are inclusive of hire charges for grinding machine with wheel,cost of sand paper (water proof abrasive sheet), coat of putty blade, labour charges for grinding the joints and sand papering,two coats of putty,scrapping the putty area to level the surface smooth,etc., complete.The putty should be got approved by the Executive Engineer before use on work.

665

-

-

... More
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three M-Sand) 10mm thick with Plasticizer including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers.

430

-

-

... More
Painting two coats of newly plastered wall surface with ready mixed Plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.

1265

-

-

... More
Painting two coats of newly plastered wall surface with ready mixed Exterior emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.

835

-

-

... More
Supplying and fixing of M.S.grill of approved design for grill gate, grill work to doors and windows openings ramp etc., using necessary mild steel flats for inner and outer members which should be fixed on edges including priming coat of best approved quality red oxide primer etc., complete complying with standard specification.

2497

-

-

... More
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)

350.75

-

-

... More
Supplying and fixing in position steel balustrades using 20mm square rods spaced at 150mm centre to centre so that the two balustrades in each step shall be placed centrally and the top of balustrades connected with the hand rails (cost of hand rail shall be measured and paid separately) by means of MS flats of size 40mm x 6mm in the groove 40mm x 6mm provided at the bottom of hand rail; the bottom of balustrades shall be fixed on to the top of step concrete. An additional MS flat of size 50mm x 6mm shall be provided at the centre of balustrades connecting all square rods to the entire length including cost of square rods, flat and applying one coat of red oxide primer to the iron surfaces, etc., complete complying with standard specification and as directed by the departmental officers.

35.52

-

-

... More
Supplying and fixing 40mm dia GI pipe for staircase hand rail including labour charges for cutting, welding and fixing with MS flats (excluding cost of flat), etc., as directed by the Departmental Officers.

44.4

-

-

... More
Manufacturing, supplying and fixing of Steel doors with following specification. MS angle of size 40x40x6mm at 3.5 kg/m used for outer frame and MS Angle of size 35x35x5mm at 2.6 Kg/m for the shutter frame. Stiffeners with 32x6mm at 1.5 Kg/m MS Flat is provided as the lock rail of the door and welded intact on both ends to the shutter frame. 18 G CR Sheets of best quality is laid as panel in the shutter frames. 18x5mm at 0.70 kg/m MS flat is welded over the 32x6mm at 1.50kg/m MS Flat on the rear side of the door, sandwitching the CR Sheet for rigidity. Additional stiffeners with 18x5mm at 0.7 Kg/m MS flats are provided diagonally on the rear side of the shutter. 300mm length of hinges 2 Nos, for shutter is provided. 6 Nos. of 250mm length hold fasts 200mm length specified at the ends are welded to the outer frame of the door. Tower bolt 2 Nos. at the top provided. 250x16mm size of Two aldrops are provided in single leaf door at lock rail section in the door for inner and outer provided and one rotating locking arrangements for the inner side of the door and additional provision for locking arrangements for lock is provided on the rear side of the door at an appropriate place and 1 No. of M.S. handle of heavy duty. A tie bar is provided at the bottom of the outer frame to prevent twisting of the frame during transportation and fixing. All members are given one coat of red oxide primer as directed by the departmental officers. The rate includes cost of all materials, labour charges, transportation, taxes and all other incidental charges, etc., complete.

-

-

-

... More
Single Leaf

4.8

-

-

... More
Manufacturing, supplying and fixing of Steel doors with following specification. MS angle of size 40x40x6mm at 3.5 kg/m used for outer frame and MS Angle of size 35x35x5mm at 2.6 Kg/m for the shutter frame. Stiffeners with 32x6mm at 1.5 Kg/m MS Flat is provided as the lock rail of the door and welded intact on both ends to the shutter frame. 18 G CR Sheets of best quality is laid as panel in the shutter frames. 18x5mm at 0.70 kg/m MS flat is welded over the 32x6mm at 1.50kg/m MS Flat on the rear side of the door, sandwitching the CR Sheet for rigidity. Additional stiffeners with 18x5mm at 0.7 Kg/m MS flats are provided diagonally on the rear side of the shutter. 300mm length of highes 4 Nos. for shutters is provided. 6 Nos. of hold fasts 200mm length spliced at the ends are welded to the outer frame of the door. 250mm lenght of Tower bolt 2 Nos., one at the top and the other at bottom are provided. 250x16mm size of One aldrop is provided in case of double leaf door at lock rail section in the door. Additional provision for locking arrangements for lock is provided on the rear side of the door at an appropriate placeand 2 Nos. MS Handles of Heavy duty . MS flat 32x4mm at 1.10 Kg/m is provided on the edge of the one shutter to conceal the gap between the two shutters. A tie bar is provided at the bottom of the outer frame to prevent twisting of the frame during transportation and fixing. All members are given one coat of red oxide primer as directed by the departmental officers. The rate includes cost of all materials, labour charges, transportation, taxes and all other incidental charges, etc., complete.

-

-

-

... More
Double Leaves

17.28

-

-

... More
Manufacturing, supplying and fixing of steel entrance door with the following specifications, MS Angle of size 40 x 40 x 6mm at 3.5 Kg/m are used for outer frames and MS Angle of size 35 x 35 x 5mm at 2.6 Kg / m for the shutter frames. Stiffeners with MS Flat 32 x 6mm at 1.50 Kg / m is provided for fixing the aldrop for the door and welded intact 18 gauge CR Sheet is laid as panel in the shutters and welded intact of 1/3 bottom portion of the shutters, 2/3 portion at top provided with MS Grill at 20 Kg/m2 as per design and laid as panel in the shutters. Necessary ‘J’ section having MS Angle 46 x 25 x 3mm at 2.28 Kg/m is provided in between MS Grill and CR Sheet for compact fixing of the grill and sheet in position. The design and style for the upper panel should be approved by the departmental officers. MS Flat 18 x 5mm at 0.7 Kg/m is welded as additional stiffeners at the rear side of the shutter in the bottom panel for strength and durability. MS Flat 32 x 4mm at 1.10 Kg/m is provided over the edge of one shutter in case of double door, to conceal the gap between the shutters. 300mm length of hinges - 4 Nos., are provided at an appropriate place in the outer frame. 6 Nos. of hold fasts of 200mm in length spliced at the ends are welded to the outer frame of the door. 250mm length of Tower bolts 2 Nos. one at top and the other at the bottom are provided. 250x16mm one number aldrop is provided at an appropriate place in the doors; 2 Nos. of MS Handles of Heavy duty. A tie bar is provided at the bottom of the outer frame to prevent twisting of frame during transportation or fixing. All members are given one coat of red oxide primer as directed by the departmental officers. The rate includes cost of all materials, labour charges, taxes, transportation to site of work, loading, unloading and all other incidental charges, etc., complete.

-

-

-

... More
Double Leaves

12.18

-

-

... More
Manufacturing, supplying and fixing of steel door emergency exit with the following specifications, MS Angle of size 40 x 40 x 6mm at 3.5 Kg/m are used for outer frames and MS Angle of size 35 x 35 x 5mm at 2.6 Kg/m for the shutter frames. Stiffeners with MS Flat 32 x 6mm at 1.50 Kg / m is provided for fixing the aldrop for the door and welded intact 18 gauge CR Sheet is laid as panel in the shutters and welded intact of 1/3 bottom portion of the shutters, 2/3 portion at top provided with MS Grill at 15 Kg/Sq.m as per design and laid as panel in the shutters. The openable shutter also provided to cover the 2/3 grill portion with 18 gauge CR sheet with shutter frame made out of MS angle of size 35 x 35 x 5mm @ 2.60 Kg / m. and stiffeners with MS flat of of size 32x6mm at 1.5 kg/m. The additional stiffeners of size 18x5mm at 0.70 Kg/m is welded intact with door shutter. Necessary furniture fittings also provided for this shutter as directed by the departmental officers. Necessary ‘J’ section having MS Angle 46 x 25 x 3mm at 2.28 Kg/m is provided in between MS Grill and CR Sheet MS Flat 18 x 5mm at 0.7 Kg/m is welded as additional stiffeners at the rear side of the shutter in the bottom panel for strength and durability.

-

-

-

... More
MS Flat 32 x 4mm at 1.10 Kg/m is provided over the edge of one shutter in case of double door, to conceal the gap between the shutters. 2 Nos. of 300mm length of hinges in case of single leaf door and 4 Nos. of 300mm length of hinges in case of double leaf doors are provided at an appropriate place in the outer frame. 6 Nos. of hold fasts of 200mm in length spliced at the ends are welded to the outer frame of the door. 250mm length of Tower bolts 4 Nos. one at top and the other at the bottom are provided. In case of double leaf door one number aldrop is provided at an appropriate place in the doors; two numbers of 250x16mm length and 2 Nos. of Handle heavy duty aldrop in single leaf door. A tie bar is provided at the bottom of the outer frame to prevent twisting of frame during transportation or fixing. All members are given one coat of red oxide primer as directed by the departmental officers. The rate includes cost of all materials, labour charges, taxes, transportation to site of work, loading, unloading and all other incidental charge, etc., complete

-

-

-

... More
Double Leaves

17.28

-

-

... More
Manufacturing, supplying and fixing in position of Steel Windows with the following specifications. Outer frames of Windows made of 'Z' Section F7D of size 33 x 25 x 3 mm at 1.419 Kg/m and mullion 'J' Section (F4B) of size 46 x 25 x 3 mm at 2.28 Kg/m and shutter section of made of F7D of 33 x 25 x 3 mm at 1.419 Kg/m as specified in IS 7452/1990. Each openable shutter should not exceed a width of 600 mm to enable separate operations and easy maintenance. The panel of the shutter to be covered with 18 Gauge cold rolled sheet of superior quality and welded intact with shutter frames. Horizontal stiffeners using 18 x 5 mm MS Flat at 0.70 kG/M at 3 Nos for each shutters and additional diagonal stiffeners of the same MS Flats at all the four corners of each shutters to the suitable length welded to the shutters, for holding the CR sheets in position firmly.4 numbers of sturdy hinges and Two number of handle-cum-latch of special type made with 18x5mm MS Flats are revetted to the shutters at an appropriate height in window. Suitable opening is left for its easy operation. A stopper square rod for handle is provided in the mullion section at suitable place to catch the window handle. Each window shutter having an adjustable stay made out of 18x5mm at 0.70 kg/m MS flat of length 320mm with three adjustable position. A matching peg is provided in the outer frame of the window at suitable place. 4 Nos. of hold fasts of 120mm length spliced at the ends are welded to the out frame of the window by using MS flat of 18x5 mm at 0.70 kg/m, welded to the shutter at two place equivalent from each other from top and bottom of the shutter. An MS square bar of 12mm size is welded to the inner face of the window at an equal interval not exceeding 100mm edge to edge between them. All members are painted with one coat of anti-corrosive

-

-

-

... More
red oxide primer as directed by the departmental officers. All sections should be in confirmed with IS7452/1990. The cost includes cost of all materials, labour charges and other incidental charges, etc., complete.

-

-

-

... More
Steel Sheeted Windows with Four Leaves

43.2

-

-

... More
Providing Cup-board Shutter using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work.

15.12

-

-

... More
Supplying and Fixing of Brass Dye Cast Letters of approved size and colour. The colour treatment process is achieved with MRF colour coat and then the processed coloured layer is set into the kiln for the heat treatment process for the following sizes.

-

-

-

... More
15 cm Size Tamil Brass Letters

21

-

-

... More
Emblem (15") ( Tamil Stainless Steel Letters)

1

-

-

... More
Supply and fixing of stored pressure ABC (Mono Ammonium Phospate) Powder Type Fire Extinguisher of 6 kg. capacity as per IS:15683 with pressure gauge, discharge hose & control nozzle, wall mounting bracket, safety clip etc., including conveyance, all incidental charges, neccessary scaffolding and re-doing the dismantled portions to its original condition wherever found neccessary etc, complete as per standard specification and as directed by the Departmental Officers. Make: EXCELLENT / SAFETY FIRST / EQUIVALENT

3

-

-

... More
Supply and fixing of Carbon-di-Oxide Gas Type 2 kg. capacity Fire Extinguisher as per New IS15683, complete with control valve, discharge hose with horn, wall mounting bracket, safety clip etc., including conveyance, all incidental charges, neccessary scaffolding and re-doing the dismantled portions to its original condition wherever found neccessary etc., complete as per standard specification and as directed by the Departmental Officers. Make: EXCELLENT / SAFETY FIRST / EQUIVALENT

3

-

-

... More
GST @ 18%

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.