Public Works Department Tender

View complete overview of Puducherry PWD Tender

Public Works Department - PWD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date20 May 2022
Closing Date25 May 2022
Tender Amount₹ 7,57,271 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
13.16.1 6mm Cement Plaster of mx 1:3 (1 Cemnt: 3 fine sand)

6.2

-

-

... More
5.9.2 Centering and shuttering including strutting, propping etc and removal of form for - Walls (any thickness) including attached pilasters, butteresses , plinth and string courses etc.

4.5

-

-

... More
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level with - cement mortar 1:6 (1 cement : 6 coarse sand).

22

-

-

... More
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavation) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and lift upto 1.5m - all kinds of soil.

40.5

-

-

... More
30.11 Supplying with gravel for apron and revetment.

117

-

-

... More
30.14 Dry stone pitching on slopes to required thickness and profile with hammer dressed garnite stones having no side less than 15 cum for revetment works, preparing surface etc., complete.

55.5

-

-

... More
2.27 Supplying and filling in plinth with river sand under floors, including watering ramming consolidating and dressing complete.

11.5

-

-

... More
4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size).

19.5

-

-

... More
5.22.6 Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars (TISCON / VIZAG/ IISCO / SAIL / JSW) Fe - 415 or more.

216

-

-

... More
2.28.1 Surface dressing of the ground including removing vegetation and in - equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m - all kinds of soil.

1020

-

-

... More
13.48.2 Painting wood work with deluxe multi surface paint of required shade. Two or more coat applied @0.90 ltr / 10sqm over an under coat of primer applied @ 0.75 ltr / 10 sqm of approved brand and manufacture.

26

-

-

... More
Basic Code No. 0129 Engaging of sewer cleaner for removing sewage and complete as directed by the Engineer-in-charge.

50

-

-

... More
Basic Code No. 0025 Hire Charges for engaging of excavator – 60 including cost of services of operating staff and supply of lubricating oil and fuel charges etc. complete as directed by the Engineer-in-charge.

12

-

-

... More
30.9 Supplying and placing in position HDPE cement bags filled with sand for breach closing / diversion arrangement. The cost includes the cost of empty HDPE bags, labour charges for filling the bags and placing in position , removing the bags from site after completing the work etc., complete.

150

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.