Electricity Department Tender
View complete overview of Puducherry Electricity Department Tender
Electricity Department Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date12 Feb 2024
Closing Date26 Feb 2024
Tender Amount₹ 42,32,000
Costs
EMD
₹ 1,05,800Document Cost
₹ 1,770Tender Fee
Refer Documents
Summary
Repairing Of 16mva Power Transformer At 110/22kv Bahour Sub Station, Kattukuppam, Electricity Department, Puducherry.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EDOM_15313_2Bid Award Id
ViewTender No
01/ED/SE-OM-PR/EE-RS/23-24Tender Authority
Electricity Department ViewPurchaser Address
-Website
http://pudutenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Removing of defective coil after dismantling yoke channel and lamination block
1
-
-
Detailed examination of transformer to identify the cause for the defects
1
-
-
Rewinding the HV coil (R phase) including all materials
1040
-
-
Rewinding the LV coil (R phase) including all materials
700
-
-
Fixing the healthy and re-winding coil including insulation material and fixing of lamination and yoke channel.
1
-
-
Bracing and tapping the take-off leads of new winding and formation of star connection
1
-
-
Preliminary drying out the core and winding in the hot air chamber
1
-
-
Overhauling the OLTC mechanism and contracts and testing the same
1
-
-
Taking all the connection leads and fixing with the metal parts for both HV and LV
1
-
-
Testing of CT Ratio, Knee Point Voltage, etc.
1
-
-
Reconditioning of Flitch Plate by welding, heating and threading.
1
-
-
Fixing of top cover and HV, LV Bushing and all accessories with gasket
1
-
-
Reassemble the dismantling accessories, top-up the oil after repairing.
1
-
-
Complete painting of transformer with two coats of aluminium paint (outer side)
1
-
-
Loading charges at firm’s work
1
-
-
Unloading /loading charges of the repaired unit at allotted site
1
-
-
Insulation materials
350
-
-
Top pressure Ring
1
-
-
Copper re-insulation LV (Labour)
1400
-
-
Copper re-insulation HV (Labour)
2080
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements