Electricity Department Tender

View complete overview of Puducherry Electricity Department Tender

Electricity Department Tender

Services
Metal Fabrication
Eprocure
Opening Date29 Jul 2020
Closing Date10 Sep 2020
Tender Amount₹ 24,50,328 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Erection Of 6 Nos. Of 22/0.433 Kv 315 Kva Dtrs At Various Location In Puducherry Region

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of F-Clamp

21

-

-

... More
Supply of H.T Stay set complete with material as required

10

-

-

... More
Supply of LT 3 Phase cross arm with suitable pole clamp

32

-

-

... More
Supply of LT shackle insulator with metal part.

62

-

-

... More
Supply of LT pin insulator with Pin

39

-

-

... More
Supply of CI knobs

28

-

-

... More
Supply of L.T Stay set complete with material as required.

3

-

-

... More
Supply and Labour charges for erection of 30 ft RCC stud pole.

2

-

-

... More
Labour charges for fixing of H.T Stool for 22 KV OH Line.

84

-

-

... More
Labour charges for fixing of 22KV pin insulator with G.I. Pin.

106

-

-

... More
Labour charges for fixing of 22KV strain disc insulator with metal parts.

54

-

-

... More
Labour charges for erection of LT 3 Phase cross arm with suitable pole clamp.

32

-

-

... More
Labour charges for fixing of LT shackle insulator with metal part.

62

-

-

... More
Labour charges for erection of fixing of LT pin insulator with Pin

39

-

-

... More
Labour charges for fixing of F clamp

21

-

-

... More
Labour charges for fixing of CI knobs

28

-

-

... More
Labour charges for erection of H.T Stay set complete including excavation of pit

10

-

-

... More
Labour charges for erection of L.T Stay set complete including excavation of pit.

3

-

-

... More
Supply and labour for erection of DP Transformer structure complete including excavation,erection of 30' RCC pole, refilling of 30' RCC pole and concreting 0.6 x 0.6 x 1.5 mts. and coping 0.6 x 0.6 x 0.5 mts. in 1:3:6 ratio using cement. 20mm HBG metal and sand, (30' RCC pole, DP structure materials, Bed channel, S/ C AB switch, 5'6" channel cross arm, HG Fuse, LAS, Pin Insulators, center support, M.S Angle 50x50x6 stay sets (if required), erection of earth electrode and construction of 4 nos of earth pit, GI wire No.6 for earthing all metal parts, Copper No. 4 wire for earthing of 18 KV Lightning arrestor and separate earthing for Transformer LT earth bush, painting 2 coat of aluminium paint for all channels, metal parts etc. and two coats of cement colour painting, to RCC pole etc., including cost of concreting materials such as cement,20mm HBG Metal, sand, aluminium & cement paint, copper No. 2,4 & 16 for jumper connections, HG Fuse arrangement, earthing of LAS, 'B' Class G.I Pipe 50mm dia for earthing, 12 mm alkathene pipe, HT/LT Danger & name board SS, MS 5/8 bolt nuts & washers (required size ) etc., Including loading and unloading charges for DTRs and conductor to be supplied by the Department.

4

-

-

... More
Supply and Labour charges for erection of DP Transformer structure complete including excavation, erection of 42' rail pole, refilling of 42' rail pole and concreting 0.6 x 0.6 x 2 mts. and coping 0.6 x 0.6 x 0.5 mts. in 1:3:6 ratio using cement. 20mm HBG metal and sand, 42' rail pole, DP structure materials, Bed channel, S/ C AB switch, 5'6"channel cross arm, HG Fuse, LAS, Pin Insulators, Center support, M.S Angle 50x50x6, stay sets (if required), erection of earth electrode and construction of 4 nos of earth pit, GI wire No.6 for earthing all metal parts, Copper No. 4 wire for earthing of 18 KV Lightning arrestor and separate earthing for Transformer LT earth bush, painting 2 coat of aluminium paint for all channels, metal parts etc. and two coats of cement colour painting, to rail pole etc., including cost of concreting materials such as cement, 20mm HBG Metal, sand, aluminium & cement paint, copper No. 2,4 & 16 for jumper connections, HG Fuse arrangement, earthing of LAS, 'B' Class G.I Pipe 50mm dia for earthing, 12 mm alkathene pipe, HT/LT Danger & name board SS, MS 5/8 bolt nuts & washers (required size ) etc., Including loading and unloading charges for DTRs and conductor to be supplied by the Department.

2

-

-

... More
Supply and Labour charges for erection of 30’ RCC pole including excavation of pole pit and concreting, 0.6 x 0.6 x 1.5 Mts. and coping 0.6 x 0.6 x 0.5 Mts. in 1:3:6 ratio using 20 mm HGB Metal, earthing of RCC pole including supply of concreting materials and No. 6 G.I wire for earthing.

20

-

-

... More
Supply and Labour charges for erection of 42' Rail pole including excavation of pole pit and concreting, 0.6 x 0.6 x 2 Mts. and coping 0.6 x 0.6 x 0.5 Mts. in 1:3:6 ratio using 20 mm HGB Metal, earthing of Rail pole including supply of concreting materials and No. 6 G.I wire for earthing.

5

-

-

... More
Labour charges for fixing of 5'6' channel cross arm with suitable clamp

45

-

-

... More
Supply and Labour charges for providing of LT feedering arrangement for taking connection from the LT bush of the transformer including supply of 50x10mm aluminium flat, Aluminium socket for cable and required quantities of 3.5 core X 300 Sqmm. UG Cable.(as per site condition)

12

-

-

... More
Labour Charges for straining of ACSR conductor 7/3.35 Sq.mm including binding etc. as required

819

-

-

... More
Labour Charges for straining of ACSR conductor 7/2.59 Sq.mm including binding etc. as required

6421

-

-

... More
Labour charges for Dismantling of 24' RCC Pole

4

-

-

... More
Supply and Labour charges for erection of 30' RCC pole (LT), including concreting and earthing.

3

-

-

... More
Labour charges for Dismantling of LT Lines

3

-

-

... More
Provision of H.T Guarding one span of 70 Mts. Average with G.I .Wire (Including supply of all required materials)

152

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.