Electricity Department Tender
View complete overview of Puducherry Electricity Department Tender
Electricity Department Tender
Metal Fabrication
Eprocure
Opening Date29 Jul 2020
Closing Date10 Sep 2020
Tender Amount₹ 24,50,328 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 64,300Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Erection Of 6 Nos. Of 22/0.433 Kv 315 Kva Dtrs At Various Location In Puducherry Region
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_CCPOW_6482_1Bid Award Id
ViewTender No
123/ED/EECTTC/IPDS/20-21Tender Authority
Electricity Department ViewPurchaser Address
-Website
http://pudutenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Technical Specification - General
Technical Specification Materials
BOQ Items
... More
Supply of F-Clamp
21
-
-
... More
Supply of H.T Stay set complete with material as required
10
-
-
... More
Supply of LT 3 Phase cross arm with suitable pole clamp
32
-
-
... More
Supply of LT shackle insulator with metal part.
62
-
-
... More
Supply of LT pin insulator with Pin
39
-
-
... More
Supply of CI knobs
28
-
-
... More
Supply of L.T Stay set complete with material as required.
3
-
-
... More
Supply and Labour charges for erection of 30 ft RCC stud pole.
2
-
-
... More
Labour charges for fixing of H.T Stool for 22 KV OH Line.
84
-
-
... More
Labour charges for fixing of 22KV pin insulator with G.I. Pin.
106
-
-
... More
Labour charges for fixing of 22KV strain disc insulator with metal parts.
54
-
-
... More
Labour charges for erection of LT 3 Phase cross arm with suitable pole clamp.
32
-
-
... More
Labour charges for fixing of LT shackle insulator with metal part.
62
-
-
... More
Labour charges for erection of fixing of LT pin insulator with Pin
39
-
-
... More
Labour charges for fixing of F clamp
21
-
-
... More
Labour charges for fixing of CI knobs
28
-
-
... More
Labour charges for erection of H.T Stay set complete including excavation of pit
10
-
-
... More
Labour charges for erection of L.T Stay set complete including excavation of pit.
3
-
-
... More
Supply and labour for erection of DP Transformer structure complete including excavation,erection of 30' RCC pole, refilling of 30' RCC pole and concreting 0.6 x 0.6 x 1.5 mts. and coping 0.6 x 0.6 x 0.5 mts. in 1:3:6 ratio using cement. 20mm HBG metal and sand, (30' RCC pole, DP structure materials, Bed channel, S/ C AB switch, 5'6" channel cross arm, HG Fuse, LAS, Pin Insulators, center support, M.S Angle 50x50x6 stay sets (if required), erection of earth electrode and construction of 4 nos of earth pit, GI wire No.6 for earthing all metal parts, Copper No. 4 wire for earthing of 18 KV Lightning arrestor and separate earthing for Transformer LT earth bush, painting 2 coat of aluminium paint for all channels, metal parts etc. and two coats of cement colour painting, to RCC pole etc., including cost of concreting materials such as cement,20mm HBG Metal, sand, aluminium & cement paint, copper No. 2,4 & 16 for jumper connections, HG Fuse arrangement, earthing of LAS, 'B' Class G.I Pipe 50mm dia for earthing, 12 mm alkathene pipe, HT/LT Danger & name board SS, MS 5/8 bolt nuts & washers (required size ) etc., Including loading and unloading charges for DTRs and conductor to be supplied by the Department.
4
-
-
... More
Supply and Labour charges for erection of DP Transformer structure complete including excavation, erection of 42' rail pole, refilling of 42' rail pole and concreting 0.6 x 0.6 x 2 mts. and coping 0.6 x 0.6 x 0.5 mts. in 1:3:6 ratio using cement. 20mm HBG metal and sand, 42' rail pole, DP structure materials, Bed channel, S/ C AB switch, 5'6"channel cross arm, HG Fuse, LAS, Pin Insulators, Center support, M.S Angle 50x50x6, stay sets (if required), erection of earth electrode and construction of 4 nos of earth pit, GI wire No.6 for earthing all metal parts, Copper No. 4 wire for earthing of 18 KV Lightning arrestor and separate earthing for Transformer LT earth bush, painting 2 coat of aluminium paint for all channels, metal parts etc. and two coats of cement colour painting, to rail pole etc., including cost of concreting materials such as cement, 20mm HBG Metal, sand, aluminium & cement paint, copper No. 2,4 & 16 for jumper connections, HG Fuse arrangement, earthing of LAS, 'B' Class G.I Pipe 50mm dia for earthing, 12 mm alkathene pipe, HT/LT Danger & name board SS, MS 5/8 bolt nuts & washers (required size ) etc., Including loading and unloading charges for DTRs and conductor to be supplied by the Department.
2
-
-
... More
Supply and Labour charges for erection of 30’ RCC pole including excavation of pole pit and concreting, 0.6 x 0.6 x 1.5 Mts. and coping 0.6 x 0.6 x 0.5 Mts. in 1:3:6 ratio using 20 mm HGB Metal, earthing of RCC pole including supply of concreting materials and No. 6 G.I wire for earthing.
20
-
-
... More
Supply and Labour charges for erection of 42' Rail pole including excavation of pole pit and concreting, 0.6 x 0.6 x 2 Mts. and coping 0.6 x 0.6 x 0.5 Mts. in 1:3:6 ratio using 20 mm HGB Metal, earthing of Rail pole including supply of concreting materials and No. 6 G.I wire for earthing.
5
-
-
... More
Labour charges for fixing of 5'6' channel cross arm with suitable clamp
45
-
-
... More
Supply and Labour charges for providing of LT feedering arrangement for taking connection from the LT bush of the transformer including supply of 50x10mm aluminium flat, Aluminium socket for cable and required quantities of 3.5 core X 300 Sqmm. UG Cable.(as per site condition)
12
-
-
... More
Labour Charges for straining of ACSR conductor 7/3.35 Sq.mm including binding etc. as required
819
-
-
... More
Labour Charges for straining of ACSR conductor 7/2.59 Sq.mm including binding etc. as required
6421
-
-
... More
Labour charges for Dismantling of 24' RCC Pole
4
-
-
... More
Supply and Labour charges for erection of 30' RCC pole (LT), including concreting and earthing.
3
-
-
... More
Labour charges for Dismantling of LT Lines
3
-
-
... More
Provision of H.T Guarding one span of 70 Mts. Average with G.I .Wire (Including supply of all required materials)
152
-
-