Electricity Department Tender
Eprocure
Opening Date9 Oct 2020
Closing Date17 Nov 2020
Tender Amount₹ 44,33,658 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 1,12,780Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Erection Of 10.38 Kms. Of 11kv Ambagarathur Feeder
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_CCPOW_6851_1Bid Award Id
ViewTender No
16/ED/EE-CTTC/DDUGJY/20-21Tender Authority
Electricity Department ViewPurchaser Address
-Website
http://pudutenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Technical Specification General
BOQ Items
... More
Supply of 11 KV Strain disc with metal parts.
267
-
-
... More
Supply of F Clamp with stay clamp.
243
-
-
... More
Supply of HT stay set complete .
132
-
-
... More
Supply of Rail pole 105 Lbs and of length 13 Mts.
7
-
-
... More
Supply of R.C.C Pole of length (30') 9.144 Mts.
136
-
-
... More
Supply of R.C.C Stud Pole of length (30') 9.144 Mts.
1
-
-
... More
Supply of 11KV Double Contact 800Amps
1
-
-
... More
Supply of 5' 6'' channel cross arm
89
-
-
... More
Labour charges for erection of V cross arm with clamp.
139
-
-
... More
Labour charges for erection of HT Guarding
390
-
-
... More
Labour charges for erection of 11 KV Pin insulator with pin.
555
-
-
... More
Labour charges for erection of 11 KV Strain disc with metal parts.
267
-
-
... More
Labour charges for fixing of F Clamp with metal parts.
243
-
-
... More
Labour charges for erection of HT stay set complete including excavation of pit and cost of materials as required.
132
-
-
... More
Supply and Labour charges for erection of DP structure with out bed channel complete including erection of 30' RCC pole and concreting 0.6 x 0.6 x 1.5 mts. with coping 0.6 x 0.6 x 0.5 mts. in 1:3:6 ratio using 20mm HBG metal, fixing of DP structure materials,Double contact AB switch, erection of earth electrode with B class 50 mm Dia G.I pipe and earthing all metal parts etc. and two coats of cement colour painting to RCC pole etc., including cost of concreting materials such as cement,20mm HBG metal,sand,aluminium & cement paint, earthing materials HT/LT Danger boards, MS 5/8 bolt, nuts & washers (required size) etc.,Including loading and unloading charges for conductor to be supplied by the Department from Karaikal Sub stores to the work site.
3
-
-
... More
Supply and Labour charges for erection of DP Transformer structure with out bed channel complete including erection of 30' RCC pole and concreting 0.6 x 0.6 x 1.5 mts. with coping 0.6 x 0.6 x 0.5 mts. in 1:3:6 ratio using 20mm HBG metal, fixing of DP structure materials,Single contact AB switch erection of earth electrode with B class 50 mm Dia G.I pipe and earthing all metal parts etc. and two coats of cement colour painting to RCC pole etc., including cost of concreting materials such as cement,20mm HBG metal,sand,aluminium & cement paint, earthing materials HT/LT Danger boards, MS 5/8 bolt, nuts & washers (required size) etc., Including loading and unloading charges conductor to be supplied by the Department from Karaikal Sub stores to the work site.
2
-
-
... More
Labour charges for erection of 42' 105 lbs rail pole including excavation of pole pit and concreting, 0.6 x 0.6 x 2.1 mts and copping 0.6 x 0.6 x 0.6 mts in 1:3:6 ratio using 20 mm HBG metal ,earthing of rail pole including supply of concreting materials and No.6 G.I wire for earthing, Labour charges for loading, unloading & transportation of rail pole from Sub stores, Karaikal to the work site.
7
-
-
... More
Labour charges for erection of 30' RCC pole including excavation of pole pit and concreting,0.6 x 0.6 x 1.5 mts and copping 0.6 x 0.6 x 0.5 mts in 1:3:6 ratio using 20 mm HBG metal, earthing of RCC pole including supply of concreting materials and No.6 G.I wire for earthing, Labour charges for loading, unloading & transportation of 30'RCC pole from Head office Karaikal to the work site.
110
-
-
... More
Labour charges of erection of 30' RCC stud pole including excavation of pole pit, Including loading, unloading & transportation of RCC pole from Sub stores, Karaikal to the work site
1
-
-
... More
Labour charges for replacement of 1 No of the existing 11KV Single contact AB switch with new 11 KV, 800A double contact AB switch on the Existing 30' RCC 4 pole structure .
1
-
-
... More
Labour charges for fixing of 5'6' channel cross arm with suitable clamp
89
-
-
... More
Labour charge for straining of ACSR conductor of 7/3.35sq.mm including binding etc., as required.
5454
-
-
... More
Labour charge for straining of ACSR conductor of 7/4.09sq.mm including binding etc., as required.
14525
-
-
... More
Labour charge for Strengthening of ACSR conductor of 7/2.59 sq.mm in to ACSR conductor of 7/3.35 sq.mm. including binding etc., as required.
12966
-
-
... More
Labour charges for Dismantling of RSJ Pole.
6
-
-
... More
Labour charges for Dismantling of 30' RCC Pole
16
-
-
... More
Labour charges for Dismantling of Tubular pole
4
-
-
... More
Labour charges for Dismantling of Rail Pole
2
-
-