Department Of Local Administration Tender
View complete overview of Puducherry DLA Tender
Department Of Local Administration - DLA Tender
Civil And Construction
Road Construction
Eprocure
Opening Date15 Mar 2024
Closing DateCancelled
Tender AmountRefer Documents
Costs
EMD
₹ 39,740Document Cost
₹ 525Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DLA_15653_1Tender No
12/TRP-CP/Etender/2023-24Tender Authority
Department Of Local Administration ViewPurchaser Address
-Website
http://http://www.dla.go.th/en/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and laying semi-dense bituminous concrete with HMP of capacity not less than 40 - 60 TPH using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per clause 508 of MoRTH specification, 4th Revision, complete in all respects - Using grade-II material and using birumen 60/70 grade.
112
-
-
Providing and laying unscreened gravel boulders to a specified consolidated thickness for sub base course including satcking of the material to the departmental gauge on road side for pre – measurement the volume of stocks calculated as per the actual measurement shall be reduced by 15% for looseness in stacking to arrive at the net quantity. The rate shall including labour charges for spreading and hand packing to the required hire and fuel charges for all tools and plants employed and the cost of boulders etc., complete as directed by the Engineer-in-charge.
240
-
-
Hiring of JCB for clearing of earth and jungle etc. as directed by the Engineer-in-charge
40
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements