Zilla Parishad Tender
... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 24,400Document Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_DZPK_101305_1Tender No
ZP-KLD-T-8/2023-24Tender Authority
Zilla Parishad ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
RCC M/20 using 20mm and down graded crusher broken hard granite coarse aggregate as per IS 456 & IS 516 including hoisting, lowering, laying concrete in layers not exceeding 0.15mtr in depth and compacting each layer by using vibrators, watering, curing for required period including finishing the exposed surface smooth providing grooves, beads whether necessary including cost, conveyance, royalty & taxes of all materials, labour charges, T&P excluding the cost of MS rod but including centering and shuttering etc. complete in all respect as per specification & direction of Engineer-in-charge but excluding GST.
-
-
-
... More
i) Column Footing
11.44
75188
6572.38
... More
ii) Column up to Roof
2.59
17022
6572.38
... More
a) First Floor
2.59
17264
6665.77
... More
Plinth beam
5.11
33584
6572.38
... More
Roof beam
5.25
34505
6572.38
... More
Ground Floor
5.25
34995
6665.77
... More
a) First Floor
-
-
-
... More
iv) Lintel band
2
13144
6572.38
... More
First Floor
2
13331
6665.77
... More
Slab
-
-
-
... More
a) Ground Floor
11.25
73939
6572.38
... More
a) First Floor
11.25
74989
6665.77
... More
Stair case Ground floor
2.66
17482
6572.38
... More
a) First Floor
2.66
17730
6665.77
... More
vii) Chajja (GF)
0.08
525
6572.38
... More
a) First Floor
0.08
533
6665.77
... More
Rigid & smooth centering & shuttering for RCC works including cost of materials complete in GF
-
-
-
... More
Column beam
96.57
70155
726.47
... More
a) First Floor
96.57
84186
871.77
... More
Lintel GF
24.35
6083
249.83
... More
a) First Floor
24.35
7300
299.8
... More
Chajja
-
-
-
... More
a) Ground Floor
1.46
587
402.26
... More
a) First Floor
1.46
704
482.71
... More
Stair case
-
-
-
... More
a) Ground Floor
15.17
9321
614.44
... More
a) First Floor
15.17
11185
737.33
... More
Roof slab
-
-
-
... More
a) Ground Floor
71.51
28765
402.26
... More
a) First Floor
71.51
34518
482.71
... More
cutting, bending, binding and tying the MS Rods and placing in position including cost, conveyance, royalty & taxes of all materials including cost of binding wire 18 to 20 guage, labour charges, T&P etc. complete as per specification & direction of Engineer-in-Charg but excluding GST but excluding GST.
-
-
-
... More
a) Ground Floor
40.38
359026
8891.19
... More
a) First Floor
28.6
255034
8917.3
... More
Fly ash Brick Masonry of 23cm X 11cm X 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance + 8 percent in cement mortar (1:6) including soaking bricks in water for required period, laying bricks in layer after applying cement mortar of required thickness including racking out joint and curing for required period including cost, conveyance, royalty and taxes of all materials, labour charges, T&P, scafolding etc. complete as per specification and direction of the Engineer-in-Charge but excluding GST.
-
-
-
... More
i) Foundation & plinth
12.51
75589
6042.35
... More
i) Ground floor
38.83
238264
6136.1
... More
a) First Floor
38.83
249641
6429.1
... More
12mm thick cement plaster in cement mortar (1:6) in brick works including racking out the joints, removing oily substances, bromming and providing cement plaster including watering, curing for required period including cost, conveyance, royalty & taxes of all materials, labour charges, T&P etc. complete as per specification & direction of Engineer-in-charge but excluding GST.
-
-
-
... More
a) Ground Floor
118.55
19821
167.2
... More
b) 1st Floor
118.55
20251
170.83
... More
16mm thick cement plaster in cement mortar (1:6) in brick works including racking out the joints, removing oily substances, bromming and providing cement plaster including watering, curing for required period including cost, conveyance, royalty & taxes of all materials, labour charges, T&P etc. complete as per specification & direction of Engineer-in-charge but excluding GST.
-
-
-
... More
a) Ground Floor
219.13
51673
235.81
... More
b) 1st Floor
173.92
41952
241.22
... More
Supplying, fitting and fixing M.S. door & wndow made out of structure steel flat etc.
-
-
-
... More
a) Ground Floor
1132.5
146409
129.28
... More
b) 1st Floor
1132.5
146409
129.28
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements