Works Department Tender
... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Works Department - EICCL Tender
Civil And Construction
Solid Waste Management
Building Construction
Eprocure
Opening Date16 Oct 2023
Closing Date31 Oct 2023
Tender Amount₹ 13,05,200
Costs
EMD
₹ 13,052Document Cost
₹ 6,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_EICCL_95704_4Bid Award Id
ViewTender No
eTCN-32/2023-24Tender Authority
Works Department ViewPurchaser Address
-Website
http://https://www.worksodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying R.C.C. work in M-20 grade with 20mm and down grade black hard granite crusher broken stone chips of approved quality from quarry with smooth centering and shuttering hoisting and laying in layers including cost, conveyance, royalty and taxes of all materials, labour, T&P etc. complete as per direction of the Engineer-in-charge. Column Base Footing
10.68
68338
6398.75
... More
Plinth Beam
5.65
39451
6982.64
... More
Column & Beam Superstructure
6.91
111594
16149.66
... More
LINTEL
1.49
19979
13409.32
... More
CHAJJA
5.11
5700
1115.63
... More
ROOF SLAB
6.17
78691
12753.94
... More
Cover SLAB
0.63
5539
8730.63
... More
RCC WELL RING
31.83
32726
1028.15
... More
Providing M. S. Reinforcement for R.C.C. work including cutting, bending, binding & tying the grills & placing in position with cost of M. S. Rod and binding wire of 18 to 20 gauge including cost of all materials, labour, T&P etc. Complete as per direction of the Engineer-in-charge.
24.71
209057
8460.46
... More
Fly Ash Brick masonary 23 x 11 x 8 in C.M. in (1:6) in including cost, conveyance, royalties, taxes of all materials, labour, T&P etc. Complete as per direction of the Engineer-in-charge. Foundation and Plinth (G.F.)
27.61
136027
4926.76
... More
Super Structure (G.F.)
44.83
222602
4965.47
... More
2.5 cm. thick grading concrete (1:2:2) on roof slab with 6mm. size hard granite chips on new work including cost conveyance, royalty, taxes of all materials, labour, T&P etc. complete as per direction of the Engineer-in-charge.
49.37
16135
326.83
... More
Providing16mm thick cement plaster in C. M. (1:6) finished smooth to inside surface including cost conveyance, royalty, taxes of all materials, labour, T&P etc. complete as per direction of the Engineer-in-charge.
200.1
43283
216.31
... More
Providing 12mm thick cement plaster with C.M. (1:6) finished smooth over kerb wall and patches including cost, conveyance, royalty & taxes of materials, labour, T&P etc. complete as per direction of the Engineer-in-charge.
236.33
35815
151.55
... More
Supplying, fitting and fixing Kota tile in floors of size 600mm x 600mm of approved make confirming to IS 13755 laid on 20 mm thick cement mortar (1:4) (1 cement:4 course sand) and filling joints with white cement of approved qualiy including cost of all materials, labour T&P etc required for the work all complete as per direction of the Engineer-in-Charge.(For new work only)
41.73
48395
1159.74
... More
Supplying, fitting & Fixing Ceramic wall Tile & riser of step on12mm thick C.P (1:3 ) jointed with neat cement slury, to match the shades of the tile including rubbing & polishing including cost of all etc complete
32.17
26588
826.5
... More
Supplying, of M.S. window, grills, Grill doors & M.S. doors made of M.S.Angle & flats including fixing to walls with C.C.(1:2:4) with cost of all labour, T&P etc complete.
403.75
25076
62.11
... More
Fixing of M.S. window, grills, Grill doors & M.S. doors made of M.S.Angle & flats including fixing to walls with C.C.(1:2:4) with cost of all labour, T&P etc complete.
15
1021
68.07
... More
Priming one coat including cost conveyance, royalty, taxes of all materials, labour, T&P etc. complete as per direction of the Engineer-in-charge.
436.43
28779
65.94
... More
Painting two coats with weather paint of approved shade to give an even surface including cost conveyance etc. complete.
236.33
19210
81.29
... More
Distempering TWO COATS to wall surface with approved distemper to give an even surface including cost conveyance, royalty, taxes of all materials, labour, T&P etc. complete as per direction of the Engineer-in-charge.
221.01
16010
72.44
... More
Painting two coats over one coat of primer wood/iron work including cost conveyance, royalty, taxes of all materials, labour, T&P etc. complete as per direction of the Engineer-in-charge.
40.02
8660
216.4
... More
Filling in foundation and plinth with excavated materials including watering ramming etc complete
25.39
2170
85.49
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements