Works Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Works Department Tender

Civil And Construction
Building Construction
Eprocure
Opening Date26 May 2023
Closing Date8 May 2023
Tender Amount₹ 1,15,55,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Carriage / disposal of excavated surplus earth from the worksite by mechanical means within a lead of 5Km including loading and unloading etc. complete. in all respect as per direction of Engineer-in-Charge.

19.03

2876

151.17

... More
Earthwork in excavation of all kinds of soil and deposited the excavated earth within a lead of 5 KM by Mechanical means including laoding and unloading from truck with all cost of labour T&P etc.reqd. for the work complete as per direction of Engineer-in-charge.

56.98

12974

227.7

... More
Supplying and filling foundation and plinth with sand including watering and ramming cost, conveyance, royalties and taxes of all materials and cost of all labour, T&P required for the work etc. complete.

9.58

3238

338.04

... More
Providing Plain cement concrete (1:3:6) by using 40mm size BHG(C.B) metal of appd.quality from appd.quarry including hoisting,lowering and laying concrete in layers to the reqd.levels ramming watering, curing etc. complete including cost,conveyance,royalties and taxes of all materials with all labour T&P reqd. for the work etc.complete in all respect and as per direction of Engineer-in-charge.

9.58

43773

4569.22

... More
Fly Ash brick masonary in C.M(1:6)using bricks of size 25cmx12cmx8cm having crushing strength 75kg / cm2 after immersing the bricks for six hours in water before use in Foundation and Plinth with all necessary projections,cutting,moulding,corebelling,champering,watering and curing with all cost of materials and labour T&P etc.complete as per direction of Engineer-in-charge.

16.4

69550

4240.88

... More
Fly Ash brick masonary in C.M(1:6)using bricks of size 25cmx12cmx8cm having crushing strength 75kg/cm2 after immersing the bricks for six hours in water before use in Superstructure with all necessary projections, cutting,moulding, corebelling, champering,watering and curing with all cost of materials and labour T&P etc.complete as per direction of Engineer-in-charge. (A)Ground Floor

34.64

148145

4276.71

... More
(B) First Floor

34.64

158110

4564.39

... More
(C ) Second Floor

63.19

309328

4895.22

... More
(D) Third Floor

36.44

192245

5275.68

... More
RCC work of Prop (M-20) using 20mm and down graded BHG(C.B) chips of appd.quality from appd. Quarry including hoisting,lowering,laying and compacting concrete,watering and curing centering,shuttering and finishing the exposed surface smooth with cost,conveyance,royalties and taxes including all cost of materials and labour T&P etc.complete as per direction of Engineer-in-charge.(A)Ground Floor - Column Base

6.05

31336

5179.65

... More
(A)Ground Floor (Column upto Plinth)

2.84

30874

10871.2

... More
(A)Ground Floor (Plinth eam)

5.25

27193

5179.65

... More
(A)Ground Floor (Column Super Structure)

5.95

64683

10871.2

... More
(B) First Floor (Column Super Structure)

5.95

72623

12205.58

... More
(C ) Second Floor (Column Super Structure)

9.36

129188

13802.24

... More
(D) Third Floor (Column Super Structure)

4.27

67035

15699.08

... More
(A)Ground Floor (Lintel)

2.19

18549

8470.26

... More
(B) First Floor (Lintel)

2.19

20420

9324.44

... More
(C ) Second Floor (Lintel)

3.94

40758

10344.88

... More
(A)Ground Floor (Beam)

11.42

124149

10871.2

... More
(B) First Floor (Beam)

11.42

139387

12205.58

... More
(C ) Second Floor (Beam)

16.15

222906

13802.24

... More
(A)Third Floor (Beam)

2.46

38619

15699.08

... More
(B) Roof slab (Ground Floor)

29.77

272006

9136.93

... More
(B) Roof slab (First Floor)

60.8

615570

10124.51

... More
(B) Roof slab (SecondFloor)

60.8

687341

11304.96

... More
(B) Roof slab (Third Floor)

4.76

60463

12702.35

... More
(B)Staircase (Ground Floor)

0.86

8918

10369.93

... More
Staircase (First Floor)

0.86

9979

11604.05

... More
Staircase (Second Floor)

0.86

11249

13080.49

... More
Cutting, straightening coiled or bent up M.S. rods, HYSD steel or Tor Steel welding or jointing if necessary, bending, binding, tying the grills as required for RCC works, and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance, loading, unloading, taxes of M.S. rods, HYSD steel or Tor steel and binding wires of 18 to 20 gauge required for the work and cost of all labour, sundries, T&P and scaffolding complete in all respect as directed by the Engineer-in-Charge (payment will be made according to the actual weight of M.S. rod, HYSD steel or Tor steel consumed in the work and no separate payment will be made towards weight of binding wires which is to be borne by the contractor at his own cost).(Ground Floor)

96.91

888060

9163.77

... More
(B) First Floor

114.05

1048052

9189.41

... More
(C ) Second Floor

128.7

1186141

9216.33

... More
(D) Third Floor

18.3

169321

9252.52

... More
16mm thick Cement plaster in C.M(1:6)over interior surface of brick walls after rackingout joint including watering and curing with all cost of materials and labour T&P etc.complete as per direction of Engineer-in-charge.(Ground Floor)

546.4

113880

208.42

... More
(B) First Floor

546.4

116782

213.73

... More
(C ) Second Floor

546.4

119770

219.2

... More
(D) Third Floor

75.45

16964

224.84

... More
12mm thick Cement plaster in C.M(1:6)over exterior surface of brick walls after rackingout joint including watering and curing with all cost of materials and labour T&P etc.complete as per direction of Engineer-in-charge.(Ground Floor)

569.62

82583

144.98

... More
(B) First Floor

569.62

85967

150.92

... More
(C ) Second Floor

569.62

89521

157.16

... More
(D) Third Floor

203.17

33260

163.71

... More
Providing 6mm thick cement plaster in cement mortar of (1:4) to RCC surfaces such as ceilings of roof slabs, stairs, landings, chajja, shelves, columns, beams and lofts etc. including roughening/chipping, scraping and cleaning and finishing the plastered surface smooth using wooden floats, bars, etc. only to proper plumbs and level, making grooves, beads and drip coarse to give required ornamental finish as per drawing including cost of all materials, conveyance, loading and unloading, taxes, royalties, cost of all labour, scaffolding, staging, watering before plastering and curing, sundries and T&P, etc. complete as per direction of the Engineer-in-charge.

486.41

75704

155.64

... More
(B) First Floor

486.41

77616

159.57

... More
(C ) Second Floor

537.21

87892

163.61

... More
Supplying, fitting and fixing of vitrified floor tiles colour and printed in floors of approved quality (conforming to IS 13757), shade and 600 x 600mm (2’-0”x2’-0”) thick size fixed on 20mm thick C.M (1:4), jointed with neat cement slurry mixed with pigment to match the shade of tiles including cleaning the floor surface smooth with cost, conveyance, royalty and taxes of all materials, cost of all labour, sundries & T&P. etc. required for the work complete as directed by the Engineer in charge.

1459.23

1319800

904.45

... More
Supplying, fitting and fixing of vitrified tiles on dadoo skirting and risers of steps of approved quality (conforming to IS 13757), shade and 600 x 600mm (2’-0”x2’-0”) thick size fixed on 12mm thick C.M (1:3), jointed with neat cement slurry mixed with pigment to match the shade of tiles including cleaning the floor surface smooth with cost, conveyance, royalty and taxes of all materials, cost of all labour, sundries & T&P. etc. required for the work complete as directed by the Engineer in charge.

45.9

46939

1022.65

... More
Finishing the plastered surface of wall with cement based Wall Putty (Water based ) of approved make and finishing the surface smooth and even by sand papering to receive paint in wall including all cost of materials and labour T&P etc.complete as directed by Engineer-in-charge.(Ground Floor)

1032.81

78472

75.98

... More
(B) First Floor

1032.81

79960

77.42

... More
(C ) Second Floor

1083.61

85507

78.91

... More
(D) Third Floor

75.45

6069

80.44

... More
Applying 2 (Two ) coats of Painting with Plastic Emulsion paint with Wall Primer of approved make and shade in all floors and at all heights to the interior surface of the wall to make an even finished surface including sand papering, including cost,conveyance, loading, unloading,stacking, taxes of all Materials,cost of all Labour,Scaffoldings, Staging, Sundries, T&P etc.required for the work complete as directed by the Engineer -in -charge.

1032.81

152886

148.03

... More
(B) First Floor

1032.81

156274

151.31

... More
(C ) Second Floor

1083.61

167612

154.68

... More
(D) Third Floor

75.45

11932

158.15

... More
Finishing wall surface with two coats of weather coat painting over a coat of water bond primer of approved shade to out side wall surface including cost of all materials with all taxes sundries T&P etc and labours etc complete as per direction of the Engineer in charge

569.62

81199

142.55

... More
(B) First Floor

569.62

83711

146.96

... More
(C ) Second Floor

569.62

86001

150.98

... More
(D) Third Floor

203.17

31426

154.68

... More
Dessed seasoned teak wood work (Wrought and put up) for Door and window Choukaths etc. completed with iron fittings and wooded hinged cleats etc. fixed in position including all cost of materials and labour T&P etc.complete as per direction of Engineer-in-charge.

0.29

22380

77173.14

... More
Providing , fitting & fixing of 32mm thick flush door shutter with 32mm thick BWR block board and paisting 4 mm thick veneer on both side to be pasted with adhesive with melamine polish including fitting & fixing of all fixtures like godrej make ofice lock haveing model. No. 9168. Godrej make door clouser having model no- 8340. including cost of all materials, all labour, all T&P etc. required for the work complete in all respect as per the direction of the Engineer-in-Charge

17.22

210163

12204.63

... More
Providing fitting and fixing in position M.S. grill /M.S. square bar Grill with M.S. flat and angles of approved drawing and design including cutting bending the angles and flats to proper sizes welding, chamfering etc. fitted and fixed to the walls on all floors including cost, conveyance, royalties of all materials, cost of all labour, sundries and T&P etc. required for the work complete, as per direction of the Engineer in charge

2250

150750

67

... More
Supplying, fitting, fixing of Un-plasticised Poly Vinyl Chloride (UPVC) (FENESTA / NCL VEKA LTD.) Ventilator / Top Hung - 60 - Series duly manufactured using UPVC reinforced profiles of 60mm x 55mm x 2.5mm for outer frames, 75mm x 60mm x 2.25mm for casement window sash profile capable of mounting single glazing system, structurally reinforced with hot dip galvanised up to 50 microns of minimum thickness of 1.5mm prefabricated & welded through fusion welding the window sash shall be fitted with 6mm thick clear toughened glass of SAINT-GOBAIN make duly fixed with EPDM weathering seal resistant accessories like clipping locking system made of aluminium 1 No., per set of sashes and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing / deglazing at site etc. including cost and conveyance of all materials, accessiries, labour charges, materials and product conforming to ASTM D 638-14, EN-477-95 and other applicable codes and standards etc. complete as per direction of the Engineer-In-Charge.

75

533625

7115

... More
Painting with Synthetic enamel paint of approved colour, shade and brand on Steel work/New wood work in two or more coats as required to give an even shade including an under coat of suitable primer of approved brand and manufacturer including cost of all materials with taxes and transportation, loading, unloading, scaffolding, all labour, sundries, T&P, etc. complete as per the direction of the Engineer-in-charge including filling gaps with putties, scrapping, sand papering and cleaning the surface to make free from rusts, dusts and oily substances before applying primer etc. complete.

70.5

14689

208.38

... More
25 mm. thick grading concrete of proportion (1:2:2) using ordinary cement with 6 mm. size hard crusher broken granite stone chips of approved quality and sand from approved quarry, washed and cleaned, free from debrises and silt with sika latex including hoisting, lowering and laying concrete in all floors at all height after chipping, chiseling and cleaning the entire roof surface by using wire brush, finished smooth to proper required slope and gradient with watering and curing, including cost, conveyance, royalties, loading, unloading and taxes of all materials, cost of all labour, T &P, sundries required for the work etc. complete in all respect as directed by the Engineer-in-charge.

474.92

194479

409.5

... More
Supplying fitting and fixing of stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with balustrade of size 32mmx32mmx2mm @ 0.90 m C/C and stainless square pipe bracing of size 32mmx32mmx2mm in 3 rows in stair case etc all complete as per direction of E.I.C.

546.9

177381

324.34



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.