Works Department Tender

... More
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Works Department Tender

Works
Civil And Construction
Road Construction
Electrical and Electronics
Electrical Works
Eprocure
Opening Date24 Feb 2025
Closing Soon6 Mar 2025
Tender Amount₹ 36,52,464 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
LT stay Clamp ( 1.40Kg/pair)

4

-

-

... More
LT Stay insulator

4

-

-

... More
Pole clamp for EYE hook for (XLPE Aerial bunched Cable)

19

-

-

... More
EYE hook for XLPE Aerial bunched Cable (25-70 sq.mm)

6

-

-

... More
Dead End Clamp suitable for messenger XLPE Aerial bunched Cable (25-70 sq.mm)

6

-

-

... More
Suspension Clamp with EYE hook for ABC (25-70 sq.mm)

13

-

-

... More
4C×50 mm² (P)+1C×50 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable)

596

-

-

... More
Insulated piercing connector.Type-B-main 25 to 150 sq.mm & Tap-6 to 35 sq.mm

11

-

-

... More
GI Pipe Earthing (each 5th pole to earth)

3

-

-

... More
Coil Earthing

15

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

4.98

-

-

... More
Danger plate (LT)

19

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

5.72

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

57

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

22.87

-

-

... More
GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole)

9.5

-

-

... More
Black Paint

19

-

-

... More
Yellow Colour Paint for Background

38

-

-

... More
Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.)

4

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr

7.13

-

-

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

3

-

-

... More
Dismantling of LT Pole

16

-

-

... More
Dismantling of LT AB line (3x35 + 1x25 mm²)

120

-

-

... More
Dismantling of LT AB line (3x50 + 1x35 + 1x16 mm²)

340

-

-

... More
Dismantling of LT AB line (1x35 + 1x25 mm²)

120

-

-

... More
Part-B : Erection of 11KV interposing pole with guarding arrangement and construction of LT line Erection near golosara. WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

1

-

-

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 4 no's channel required =( 4x9.56x1.2)

45.89

-

-

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280)

10.57

-

-

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 4 no's channel required =( 4x9.56x0.306)

11.7

-

-

... More
Danger Plate, 1 no's.

1

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.3

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

3

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

1.2

-

-

... More
11 KV pin insulator polymer

4

-

-

... More
H W fitting(B&S) 70KN, 3Bolt

6

-

-

... More
Disc insulator (B&S) 70 KN polymer

6

-

-

... More
Non Metallic Ties 11KV (For covered conductor)

4

-

-

... More
IPC for 70 sq.mm AAA conductor (For covered conductor)

6

-

-

... More
Spike (GI ) (using 50x6mm Flat welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole )

2

-

-

... More
Earthing of Support ( Coil Type )

1

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.26

-

-

... More
H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)

2

-

-

... More
H.T. Stay set (Complete )

2

-

-

... More
H.T. Stay Insulator Type-C

2

-

-

... More
7/10 SWG Stay Wire 15kg /stay

30

-

-

... More
GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole)

7.43

-

-

... More
Black Paint

0.5

-

-

... More
Yellow Colour Paint for Background

2

-

-

... More
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.

2

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

0.45

-

-

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.11

-

-

... More
WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

4

-

-

... More
11 KV V cross Arm (10.2 K.g. each )

4

-

-

... More
Top bracket 100x50X6 mm GI channel (2kg each)

4

-

-

... More
Danger Plate, 1 no's. for each pole

4

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

1.2

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

12

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

4.81

-

-

... More
11 KV pin insulator polymer, 3 Nos. required for each support

12

-

-

... More
Spike (GI ) (using 50x6mm Flat welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole )

8

-

-

... More
Non Metallic Ties 11KV (For covered conductor)

12

-

-

... More
Earthing of Support ( Coil Type )

4

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

1.05

-

-

... More
GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point)

5.8

-

-

... More
Black Paint

4

-

-

... More
Yellow Colour Paint for Background

8

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

1.8

-

-

... More
Couping ratio 1:1.5:3 with dimension (500X500X450)= 0.1125 Cu mtr

0.45

-

-

... More
Guarding Channel 75x40x4.8 mm, 7.14 KG/Mtr., each channel length 2.2 mtr., 4 no's channel required =( 4x7.14x2.2) ( For Single Pole)

62.83

-

-

... More
No-6 GI wire (0.192 kg/mtr.) for Main String

15.36

-

-

... More
No-8 GI wire (0.131 kg/mtr.) for lacing

3.28

-

-

... More
Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.)

4

-

-

... More
Gi Pipe Earthing 40mm. 3 Mtr. Long

2

-

-

... More
50x6mm GI Flat for earthing, 2.36kg/mtr., (10.7 mtr For raising)= 10.7x2.36

50.5

-

-

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

2

-

-

... More
Part-B1 : Construction of LT line - 0.2 Km. 9 Mtr. long 300 Kg. PSC Pole

6

-

-

... More
LT Stay set Complete

1

-

-

... More
7/12 SWG GI stay wire, Grade -2

24

-

-

... More
LT stay Clamp ( 1.40Kg/pair)

2

-

-

... More
LT Stay insulator

2

-

-

... More
Pole clamp for EYE hook for (XLPE Aerial bunched Cable)

7

-

-

... More
EYE hook for XLPE Aerial bunched Cable (25-70 sq.mm)

2

-

-

... More
Dead End Clamp suitable for messenger XLPE Aerial bunched Cable (25-70 sq.mm)

2

-

-

... More
Suspension Clamp with EYE hook for ABC (25-70 sq.mm)

5

-

-

... More
4C×35 mm² (P)+1C×35 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable)

210

-

-

... More
Insulated piercing connector.Type-B-main 25 to 150 sq.mm & Tap-6 to 35 sq.mm

4

-

-

... More
GI Pipe Earthing (each 5th pole to earth)

1

-

-

... More
Coil Earthing

6

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

1.83

-

-

... More
Danger plate (LT)

6

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

2.11

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

21

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

8.43

-

-

... More
GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole)

3.5

-

-

... More
Black Paint

6

-

-

... More
Yellow Colour Paint for Background

12

-

-

... More
Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.)

2

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr

2.63

-

-

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

1

-

-

... More
Dismantling of 9 Mtr PSC Pole (11 KV)

5

-

-

... More
Dismantling of LT Pole

5

-

-

... More
Dismantling of LT AB line (1x35 + 1x25 mm²)

200

-

-

... More
Part-C: Erection of 11KV interposing pole with guarding arrangement, erection of LT interposing pole and construction of LT line for shifting of S/S and lines at Kanteikolia. WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

1

-

-

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 4 no's channel required =( 4x9.56x1.2)

45.89

-

-

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280)

14.53

-

-

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 4 no's channel required =( 4x9.56x0.306)

11.7

-

-

... More
Danger Plate, 1 no's.

1

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.3

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

3

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

1.2

-

-

... More
11 KV pin insulator polymer

6

-

-

... More
H W fitting(B&S) 70KN, 3Bolt

9

-

-

... More
Disc insulator (B&S) 70 KN polymer

9

-

-

... More
Non Metallic Ties 11KV (For covered conductor)

6

-

-

... More
IPC for 70 sq.mm AAA conductor (For covered conductor)

6

-

-

... More
Spike (GI ) (using 50x6mm Flat welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole )

2

-

-

... More
Earthing of Support ( Coil Type )

1

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.26

-

-

... More
H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)

2

-

-

... More
H.T. Stay set (Complete )

2

-

-

... More
H.T. Stay Insulator Type-C

2

-

-

... More
7/10 SWG Stay Wire 15kg /stay

30

-

-

... More
GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole)

7.43

-

-

... More
Black Paint

0.5

-

-

... More
Yellow Colour Paint for Background

2

-

-

... More
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.

2

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

0.45

-

-

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.11

-

-

... More
WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

3

-

-

... More
11 KV V cross Arm (10.2 K.g. each )

3

-

-

... More
Top bracket 100x50X6 mm GI channel (2kg each)

3

-

-

... More
Danger Plate, 1 no's. for each pole

3

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.9

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

9

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

3.61

-

-

... More
11 KV pin insulator polymer, 3 Nos. required for each support

9

-

-

... More
Spike (GI ) (using 50x6mm Flat welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole )

6

-

-

... More
Non Metallic Ties 11KV (For covered conductor)

9

-

-

... More
Earthing of Support ( Coil Type )

3

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.79

-

-

... More
GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point)

4.35

-

-

... More
Black Paint

3

-

-

... More
Yellow Colour Paint for Background

6

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

1.35

-

-

... More
Couping ratio 1:1.5:3 with dimension (500X500X450)= 0.1125 Cu mtr

0.34

-

-

... More
Guarding Channel 75x40x4.8 mm, 7.14 KG/Mtr., each channel length 2.2 mtr., 4 no's channel required =( 4x7.14x2.2) ( For Single Pole)

62.83

-

-

... More
No-6 GI wire (0.192 kg/mtr.) for Main String

15.36

-

-

... More
No-8 GI wire (0.131 kg/mtr.) for lacing

3.28

-

-

... More
Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.)

4

-

-

... More
Gi Pipe Earthing 40mm. 3 Mtr. Long

2

-

-

... More
50x6mm GI Flat for earthing, 2.36kg/mtr., (10.7 mtr For raising)= 10.7x2.36

50.5

-

-

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

2

-

-

... More
Part-C1 : Construction of LT line - 0.1 Km. and Erection of LT interposing pole - 4 Nos. 9 Mtr. long 300 Kg. PSC Pole

4

-

-

... More
LT Stay set Complete

3

-

-

... More
7/12 SWG GI stay wire, Grade -2

36

-

-

... More
LT stay Clamp ( 1.40Kg/pair)

3

-

-

... More
LT Stay insulator

3

-

-

... More
Pole clamp for EYE hook for (XLPE Aerial bunched Cable)

4

-

-

... More
EYE hook for XLPE Aerial bunched Cable (25-70 sq.mm)

2

-

-

... More
Dead End Clamp suitable for messenger XLPE Aerial bunched Cable (25-70 sq.mm)

2

-

-

... More
Suspension Clamp with EYE hook for ABC (25-70 sq.mm)

2

-

-

... More
4C×35 mm² (P)+1C×35 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable)

105

-

-

... More
Insulated piercing connector.Type-B-main 25 to 150 sq.mm & Tap-6 to 35 sq.mm

2

-

-

... More
GI Pipe Earthing (each 5th pole to earth)

1

-

-

... More
Coil Earthing

3

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

1.05

-

-

... More
Danger plate (LT)

4

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

1.2

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

12

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

4.81

-

-

... More
GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole)

2

-

-

... More
Black Paint

4

-

-

... More
Yellow Colour Paint for Background

8

-

-

... More
Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.)

3

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr

1.5

-

-

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

1

-

-

... More
9 Mtr. long 300 Kg. PSC Pole

7

-

-

... More
Suspension Clamp with EYE hook for ABC (25-70 sq.mm)

7

-

-

... More
GI Pipe Earthing (each 5th pole to earth)

1

-

-

... More
Coil Earthing

7

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

1.83

-

-

... More
Danger plate (LT)

7

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

2.11

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

21

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

8.43

-

-

... More
GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole)

3.5

-

-

... More
Black Paint

7

-

-

... More
Yellow Colour Paint for Background

14

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr

2.63

-

-

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

1

-

-

... More
Dismantling of 9 Mtr PSC Pole (11 KV)

4

-

-

... More
Dismantling of LT Pole

10

-

-

... More
Dismantling of LT AB line (3x35 + 1x25 mm²)

100

-

-

... More
Part-D : Construction of 16KVA 11/0.23KV S/S (without transformer), at Luhamunda WPB 160x152 (11Mtr. Long, 30.44KG/Mtr.)

1

-

-

... More
Top Channel GI 100 X 50 X 6 MM (1200 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x1.200x9.56= 22.94 Kg)

22.94

-

-

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280)

3.97

-

-

... More
Transformer Mounting Bracket (65x65x6 GI Angle suitable for 16/10KVA 11/0.23 KV Transformer

1

-

-

... More
AB switch mounting channel 75x40x6 mm-3 X2 mtr. Long (6.8Kg /Mtr.) GI

40.8

-

-

... More
Cantilever for supporting A.B. Switch Arm 50x40x6 mm Angle-3.5 mtr. Long (4.5 K.g./mtr.) GI

15.75

-

-

... More
Horn Gap Fuse mounting Channel 75x40x6mm 2.2Mtr long (6.8 K.g./mtr.) GI

14.96

-

-

... More
25x3mm GI Flat for earthing, 0.59kg/mtr., (2.5x5 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 1x10 mtr. for DTR Nutral, 5.8 mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle) ( Each 46.1x 0.59= 27.20 Kg)

27.2

-

-

... More
LT Dist. Box with MCCB for 16KVA S/S.

1

-

-

... More
55mm2 All Alloy Aluminum Conductor (AAAC) - PVC Insulated (30 Mtr. Each Dtr.)

30

-

-

... More
2Cx16 mm2 LT PVC Cable(un armoured)

9

-

-

... More
AB Switch(11KV,200A.2pole,50Hz)

1

-

-

... More
H.G.Fuse( 11KV.200A.2Pole)

1

-

-

... More
PG Clamp for 55 sq.mm AAA conductor

6

-

-

... More
Disc insulator (B&S)70 KN polymer

3

-

-

... More
H W fitting (B&S)70KN(3bolted)

3

-

-

... More
Lightning Arrester(12KV,10KA) Station Class 2

2

-

-

... More
11KV pin insulator polymer

2

-

-

... More
HT stay set complete

2

-

-

... More
HT stay Clamp (1.9Kg/pair)

2

-

-

... More
HT stay insulator TYPE-C

2

-

-

... More
7/10 SWG GI stay wire, Grade -2 (15Kg./ Set)

30

-

-

... More
40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long

5

-

-

... More
GI Nuts & Bolts of Assorted size (15 Kg/ DSS SP)

15

-

-

... More
GI Barbed wire/Anticlimbing device (3Kg /Pole)

3

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

1.2

-

-

... More
Danger plate 11kv

1

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's (Each 1x0.59x0.510)

0.3

-

-

... More
Name plate

1

-

-

... More
Yellow Colour Paint for Background

1

-

-

... More
Black Colour Paint for numbering

0.5

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.450Cu.mtr

0.45

-

-

... More
Couping ratio 1:1.5:3 (500mmX500mmX450mm) = 0.113Cu.mtr

0.11

-

-

... More
Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6 size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator .

2

-

-

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

5

-

-

... More
Laying of 2 Cx 16 mm2 LT XLPE Cable

9

-

-

... More
Supply and Erection of GI Fencing with Gate

4

-

-

... More
Part-D1 : Erection of 11KV interposing pole (90 degree cut point) - 2 Nos. WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

2

-

-

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 4 no's channel required =( 4x9.56x1.2)

91.78

-

-

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280)

21.14

-

-

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 4 no's channel required =( 4x9.56x0.306)

23.4

-

-

... More
Danger Plate, 1 no's.

2

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.6

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

6

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

2.41

-

-

... More
11 KV pin insulator polymer

8

-

-

... More
H W fitting(B&S) 70KN, 3Bolt

12

-

-

... More
Disc insulator (B&S) 70 KN polymer

12

-

-

... More
Non Metallic Ties 11KV (For covered conductor)

8

-

-

... More
IPC for 70 sq.mm AAA conductor (For covered conductor)

12

-

-

... More
Spike (GI ) (using 50x6mm Flat welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole )

4

-

-

... More
Earthing of Support ( Coil Type )

2

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.52

-

-

... More
H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)

3

-

-

... More
H.T. Stay set (Complete )

3

-

-

... More
H.T. Stay Insulator Type-C

3

-

-

... More
7/10 SWG Stay Wire 15kg /stay

45

-

-

... More
GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole)

14.87

-

-

... More
Black Paint

1

-

-

... More
Yellow Colour Paint for Background

4

-

-

... More
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.

3

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

0.9

-

-

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.23

-

-

... More
Part-D2 : Construction of LT line - 0.1 Km. and Erection of LT interposing pole - 2 Nos. 9 Mtr. long 300 Kg. PSC Pole

4

-

-

... More
LT Stay set Complete

1

-

-

... More
7/12 SWG GI stay wire, Grade -2

12

-

-

... More
LT stay Clamp ( 1.40Kg/pair)

1

-

-

... More
LT Stay insulator

1

-

-

... More
Pole clamp for EYE hook for (XLPE Aerial bunched Cable)

4

-

-

... More
EYE hook for XLPE Aerial bunched Cable (25-70 sq.mm)

2

-

-

... More
Dead End Clamp suitable for messenger XLPE Aerial bunched Cable (25-70 sq.mm)

2

-

-

... More
Suspension Clamp with EYE hook for ABC (25-70 sq.mm)

2

-

-

... More
4C×35 mm² (P)+1C×35 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable)

95

-

-

... More
Insulated piercing connector.Type-B-main 25 to 150 sq.mm & Tap-6 to 35 sq.mm

2

-

-

... More
GI Pipe Earthing (each 5th pole to earth)

1

-

-

... More
Coil Earthing

3

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

1.05

-

-

... More
Danger plate (LT)

4

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

1.2

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

12

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

4.81

-

-

... More
GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole)

2

-

-

... More
Black Paint

4

-

-

... More
Yellow Colour Paint for Background

8

-

-

... More
Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.)

1

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr

1.5

-

-

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

1

-

-

... More
9 Mtr. long 300 Kg. PSC Pole

2

-

-

... More
Suspension Clamp with EYE hook for ABC (25-70 sq.mm)

2

-

-

... More
Coil Earthing

2

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.52

-

-

... More
Danger plate (LT)

2

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.6

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

6

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

2.41

-

-

... More
GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole)

1

-

-

... More
Black Paint

2

-

-

... More
Yellow Colour Paint for Background

4

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr

0.75

-

-

... More
Dismantling of 9 Mtr PSC Pole (11 KV)

2

-

-

... More
Dismantling of LT Pole

5

-

-

... More
Dismantling of 16KVA 11/0.23KV pole mounted DT

1

-

-

... More
Dismantling of LT AB line (1x35 + 1x25 mm²)

100

-

-

... More
Part-E : Construction of 11KV line at Madhupur. WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

1

-

-

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 2 no's channel required =( 2x9.56x1.2)

45.89

-

-

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280)

14.53

-

-

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 2 no's channel required =(2x9.56x0.306)

11.7

-

-

... More
Danger Plate, 1 no's.

1

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.3

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

3

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

1.2

-

-

... More
11 KV pin insulator polymer

6

-

-

... More
H W fitting(B&S) 70KN, 3Bolt

9

-

-

... More
Disc insulator (B&S) 70 KN polymer

9

-

-

... More
Non Metallic Ties 11KV (For covered conductor)

6

-

-

... More
IPC for 70 sq.mm AAA conductor (For covered conductor)

6

-

-

... More
Spike (GI ) (using 50x6mm Flat welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole )

2

-

-

... More
Earthing of Support ( Coil Type )

1

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.26

-

-

... More
GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole)

2

-

-

... More
Black Paint

2

-

-

... More
Yellow Colour Paint for Background

2

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

0.45

-

-

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.11

-

-

... More
WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

3

-

-

... More
11 KV V cross Arm (10.2 K.g. each )

3

-

-

... More
Top bracket 100x50X6 mm GI channel (2kg each)

3

-

-

... More
Danger Plate, 1 no's. for each pole

3

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.9

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

9

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

3.61

-

-

... More
11 KV pin insulator polymer, 3 Nos. required for each support

9

-

-

... More
Spike (GI ) (using 50x6mm Flat welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole )

6

-

-

... More
Non Metallic Ties 11KV (For covered conductor)

9

-

-

... More
Earthing of Support ( Coil Type )

3

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.79

-

-

... More
GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point)

4.35

-

-

... More
70 SQ.MM. AAAC XLPE Covered Conductor

0.56

-

-

... More
Black Paint

3

-

-

... More
Yellow Colour Paint for Background

6

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

1.35

-

-

... More
Couping ratio 1:1.5:3 with dimension (500X500X450)= 0.1125 Cu mtr

0.34

-

-

... More
Part-E1 : Erection of LT interposing pole - 4 Nos. 9 Mtr. long 300 Kg. PSC Pole

4

-

-

... More
Suspension Clamp with EYE hook for ABC (25-70 sq.mm)

3

-

-

... More
Coil Earthing

3

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.79

-

-

... More
Danger plate (LT)

4

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.9

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

9

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

3.61

-

-

... More
GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole)

1.5

-

-

... More
Black Paint

4

-

-

... More
Yellow Colour Paint for Background

8

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr

1.13

-

-

... More
Dismantling of 9 Mtr PSC Pole (11 KV)

3

-

-

... More
Dismantling of LT Pole

3

-

-

... More
Dismantling of 55mm² AAA Conductor

0.54

-

-

... More
Part-F : Construction of 11KV line - 0.18 Km.(near golosara farm. WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

1

-

-

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 2 no's channel required =( 2x9.56x1.2)

22.94

-

-

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280)

5.29

-

-

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 2 no's channel required =(2x9.56x0.306)

5.85

-

-

... More
Danger Plate, 1 no's.

1

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.3

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

3

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

1.2

-

-

... More
11 KV pin insulator polymer

3

-

-

... More
H W fitting(B&S) 70KN, 3Bolt

6

-

-

... More
Disc insulator (B&S) 70 KN polymer

6

-

-

... More
Non Metallic Ties 11KV (For covered conductor)

3

-

-

... More
IPC for 70 sq.mm AAA conductor (For covered conductor)

6

-

-

... More
Spike (GI ) (using 50x6mm Flat welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole )

2

-

-

... More
Earthing of Support ( Coil Type )

1

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.26

-

-

... More
GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole)

3.55

-

-

... More
Black Paint

0.5

-

-

... More
Yellow Colour Paint for Background

2

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

0.45

-

-

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.11

-

-

... More
WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

4

-

-

... More
11 KV V cross Arm (10.2 K.g. each )

4

-

-

... More
Top bracket 100x50X6 mm GI channel (2kg each)

4

-

-

... More
Danger Plate, 1 no's. for each pole

4

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

1.2

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

12

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

4.81

-

-

... More
11 KV pin insulator polymer, 3 Nos. required for each support

12

-

-

... More
Spike (GI ) (using 50x6mm Flat welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole )

8

-

-

... More
Non Metallic Ties 11KV (For covered conductor)

12

-

-

... More
Earthing of Support ( Coil Type )

4

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

1.05

-

-

... More
GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point)

5.8

-

-

... More
70 SQ.MM. AAAC XLPE Covered Conductor

0.56

-

-

... More
Black Paint

4

-

-

... More
Yellow Colour Paint for Background

8

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

1.8

-

-

... More
Couping ratio 1:1.5:3 with dimension (500X500X450)= 0.1125 Cu mtr

0.45

-

-

... More
WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

1

-

-

... More
11 KV V cross Arm (10.2 K.g. each )

1

-

-

... More
Top bracket 100x50X6 mm GI channel (2kg each)

1

-

-

... More
Danger Plate, 1 no's. for each pole

1

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.3

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

3

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

1.2

-

-

... More
11 KV pin insulator polymer, 3 Nos. required for each support

3

-

-

... More
Spike (GI ) (using 50x6mm Flat welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole )

2

-

-

... More
Non Metallic Ties 11KV (For covered conductor)

3

-

-

... More
Earthing of Support ( Coil Type )

1

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.26

-

-

... More
GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point)

1.45

-

-

... More
Black Paint

1

-

-

... More
Yellow Colour Paint for Background

2

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

0.45

-

-

... More
Couping ratio 1:1.5:3 with dimension (500X500X450)= 0.1125 Cu mtr

0.11

-

-

... More
Dismantling of 9 Mtr PSC Pole (11 KV)

5

-

-

... More
Dismantling of 55mm² AAA Conductor

0.54

-

-

... More
Part-G : Construction of 11 KV Line DP with AB Switch - 1 No.(Near kisinda farm house) WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

2

-

-

... More
Top Channel 100X50X6mm, 9.56 KG/Mtr., each channel length 3 mtr., 2 no's channel required =( 2x9.56x3)

57.36

-

-

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280)

3.97

-

-

... More
AB switch Mounting Channel 75X40X4.8mm, 7.14KG/Mtr, each channel length 3 Mtr., 2 no's channel required =( 7.14x3x2)

42.84

-

-

... More
AB Switch Side Support Channel 100X50X6mm,9.56 KG/Mtr., each channel length 0.35 mtr., 2 no's channel required =( 9.56x2x0.35)

6.69

-

-

... More
Channel Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each channel length 0.8 Mtr., 1 no's channel required =( 7.14x0.8x1)

5.71

-

-

... More
Double Pole Belting Channel 75X40X 4.8mm., 7.14KG/Mtr., each channel length 3.0 Mtr., 4 no's channel required =( 7.14x3x4)

85.68

-

-

... More
50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle length 3.512 mtr., 4 nos angle required = (4.5x3.512x4)

63.22

-

-

... More
Danger Plate, 2 no's.

2

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no's = (2x0.59x0.510)

0.6

-

-

... More
H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)

2

-

-

... More
H.T. Stay set (Complete )

2

-

-

... More
H.T. Stay Insulator Type-C

2

-

-

... More
7/10 SWG Stay Wire 15kg /stay

30

-

-

... More
Gi Pipe Earthing 40mm. 3 Mtr. Long

2

-

-

... More
50x6mm GI Flat for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36

48.38

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg)

6

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510)

2.41

-

-

... More
Lightning Arrester(12KV,10KA) (Station Class,class-2)

3

-

-

... More
AB Switch (11KV,400A.3pole,50Hz)

1

-

-

... More
11 KV pin insulator polymer

3

-

-

... More
H W fitting(B&S) 70KN, 3Bolt

6

-

-

... More
Disc insulator (B&S) 70 KN polymer

6

-

-

... More
Non Metallic Ties 11KV (For covered conductor)

3

-

-

... More
IPC for 70 sq.mm AAA conductor (For covered conductor)

6

-

-

... More
Spike (GI ) (using 50x6mm Flat welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole )

4

-

-

... More
GI Nut , Bolt & Washer of different sizes (13.718 Kg each DP with AB Switch)

13.72

-

-

... More
Black Paint

1

-

-

... More
Yellow Colour Paint for Background

2

-

-

... More
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.

2

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

0.9

-

-

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.23

-

-

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

2

-

-

... More
Part-G1 : Erection of 11KV interposing pole - 4 Nos. WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

4

-

-

... More
11 KV V cross Arm (10.2 K.g. each )

4

-

-

... More
Top bracket 100x50X6 mm GI channel (2kg each)

4

-

-

... More
Danger Plate, 1 no's. for each pole

4

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

1.2

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

12

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

4.81

-

-

... More
11 KV pin insulator polymer, 3 Nos. required for each support

12

-

-

... More
Spike (GI ) (using 50x6mm Flat welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole )

8

-

-

... More
Non Metallic Ties 11KV (For covered conductor)

12

-

-

... More
Earthing of Support ( Coil Type )

4

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

1.05

-

-

... More
GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point)

5.8

-

-

... More
Black Paint

4

-

-

... More
Yellow Colour Paint for Background

8

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

1.8

-

-

... More
Couping ratio 1:1.5:3 with dimension (500X500X450)= 0.1125 Cu mtr

0.45

-

-

... More
Dismantling of 9 Mtr PSC Pole (11 KV)

3

-

-

... More
Dismantling of 11 - 13 Mtr Joist pole

3

-

-

... More
Part-H : Construction of 11KV line - 0.18 Km.(Near Maheswari Nursery). WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

1

-

-

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 4 no's channel required =( 4x9.56x1.2)

45.89

-

-

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280)

10.57

-

-

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 4 no's channel required =( 4x9.56x0.306)

11.7

-

-

... More
Danger Plate, 1 no's.

1

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.3

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

3

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

1.2

-

-

... More
11 KV pin insulator polymer

4

-

-

... More
H W fitting(B&S) 70KN, 3Bolt

6

-

-

... More
Disc insulator (B&S) 70 KN polymer

6

-

-

... More
Non Metallic Ties 11KV (For covered conductor)

4

-

-

... More
IPC for 70 sq.mm AAA conductor (For covered conductor)

6

-

-

... More
Spike (GI ) (using 50x6mm Flat welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole )

2

-

-

... More
Earthing of Support ( Coil Type )

1

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.26

-

-

... More
H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)

2

-

-

... More
H.T. Stay set (Complete )

2

-

-

... More
H.T. Stay Insulator Type-C

2

-

-

... More
7/10 SWG Stay Wire 15kg /stay

30

-

-

... More
GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole)

7.43

-

-

... More
Black Paint

0.5

-

-

... More
Yellow Colour Paint for Background

2

-

-

... More
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.

2

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

0.45

-

-

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.11

-

-

... More
WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

4

-

-

... More
11 KV V cross Arm (10.2 K.g. each )

4

-

-

... More
Top bracket 100x50X6 mm GI channel (2kg each)

4

-

-

... More
Danger Plate, 1 no's. for each pole

4

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

1.2

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

12

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

4.81

-

-

... More
11 KV pin insulator polymer, 3 Nos. required for each support

12

-

-

... More
Spike (GI ) (using 50x6mm Flat welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole )

8

-

-

... More
Non Metallic Ties 11KV (For covered conductor)

12

-

-

... More
Earthing of Support ( Coil Type )

4

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

1.05

-

-

... More
GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point)

5.8

-

-

... More
70 SQ.MM. AAAC XLPE Covered Conductor

0.56

-

-

... More
Black Paint

4

-

-

... More
Yellow Colour Paint for Background

8

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

1.8

-

-

... More
Couping ratio 1:1.5:3 with dimension (500X500X450)= 0.1125 Cu mtr

0.45

-

-

... More
Dismantling of 9 Mtr PSC Pole (11 KV)

4

-

-

... More
Dismantling of 55mm² AAA Conductor

0.54

-

-

... More
Part-I : Construction of 16KVA 11/0.23KV Single pole mounted S/S (without Transformer) - 1 No.(at luhamunda) WPB 160x152 (11Mtr. Long, 30.44KG/Mtr.)

1

-

-

... More
Top Channel GI 100 X 50 X 6 MM (1200 mm long) (9.56Kg./Mtr, 2 No's.) (Each 2x1.200x9.56= 22.94 Kg)

22.94

-

-

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280)

3.97

-

-

... More
Transformer Mounting Bracket (65x65x6 GI Angle suitable for 16/10KVA 11/0.23 KV Transformer

1

-

-

... More
AB switch mounting channel 75x40x6 mm-3 X2 mtr. Long (6.8Kg /Mtr.) GI

40.8

-

-

... More
Cantilever for supporting A.B. Switch Arm 50x40x6 mm Angle-3.5 mtr. Long (4.5 K.g./mtr.) GI

15.75

-

-

... More
Horn Gap Fuse mounting Channel 75x40x6mm 2.2Mtr long (6.8 K.g./mtr.) GI

14.96

-

-

... More
25x3mm GI Flat for earthing, 0.59kg/mtr., (2.5x5 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 1x10 mtr. for DTR Nutral, 5.8 mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle) ( Each 46.1x 0.59= 27.20 Kg)

27.2

-

-

... More
LT Dist. Box with MCCB for 16KVA S/S.

1

-

-

... More
55mm2 All Alloy Aluminum Conductor (AAAC) - PVC Insulated (30 Mtr. Each Dtr.)

30

-

-

... More
2Cx16 mm2 LT PVC Cable(un armoured)

9

-

-

... More
AB Switch(11KV,200A.2pole,50Hz)

1

-

-

... More
H.G.Fuse( 11KV.200A.2Pole)

1

-

-

... More
PG Clamp for 55 sq.mm AAA conductor

6

-

-

... More
Disc insulator (B&S)70 KN polymer

3

-

-

... More
H W fitting (B&S)70KN(3bolted)

3

-

-

... More
Lightning Arrester(12KV,10KA) Station Class 2

2

-

-

... More
11KV pin insulator polymer

2

-

-

... More
HT stay set complete

2

-

-

... More
HT stay Clamp (1.9Kg/pair)

2

-

-

... More
HT stay insulator TYPE-C

2

-

-

... More
7/10 SWG GI stay wire, Grade -2 (15Kg./ Set)

30

-

-

... More
40 mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr .Long

5

-

-

... More
GI Nuts & Bolts of Assorted size (15 Kg/ DSS SP)

15

-

-

... More
GI Barbed wire/Anticlimbing device (3Kg /Pole)

3

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

1.2

-

-

... More
Danger plate 11kv

1

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's (Each 1x0.59x0.510)

0.3

-

-

... More
Name plate

1

-

-

... More
Yellow Colour Paint for Background

1

-

-

... More
Black Colour Paint for numbering

0.5

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.450Cu.mtr

0.45

-

-

... More
Couping ratio 1:1.5:3 (500mmX500mmX450mm) = 0.113Cu.mtr

0.11

-

-

... More
Fixing of stay set with 0.5Cum cement concrete foundation 1:3:6 size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set , stay wire , stay insulator .

2

-

-

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

5

-

-

... More
Laying of 2 Cx 16 mm2 LT XLPE Cable

9

-

-

... More
Supply and Erection of GI Fencing with Gate

4

-

-

... More
Part-I1 : Erection of 11KV interposing pole (90 degree cut point-1 no. & Pin point - 3 nos.) - 4 Nos. with 1 no. guarding arrangement. WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

1

-

-

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 4 no's channel required =( 4x9.56x1.2)

45.89

-

-

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280)

10.57

-

-

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 4 no's channel required =( 4x9.56x0.306)

11.7

-

-

... More
Danger Plate, 1 no's.

1

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.3

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

3

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

1.2

-

-

... More
11 KV pin insulator polymer

4

-

-

... More
H W fitting(B&S) 70KN, 3Bolt

6

-

-

... More
Disc insulator (B&S) 70 KN polymer

6

-

-

... More
Non Metallic Ties 11KV (For covered conductor)

4

-

-

... More
IPC for 70 sq.mm AAA conductor (For covered conductor)

6

-

-

... More
Spike (GI ) (using 50x6mm Flat welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole )

2

-

-

... More
Earthing of Support ( Coil Type )

1

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.26

-

-

... More
H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)

2

-

-

... More
H.T. Stay set (Complete )

2

-

-

... More
H.T. Stay Insulator Type-C

2

-

-

... More
7/10 SWG Stay Wire 15kg /stay

30

-

-

... More
GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole)

7.43

-

-

... More
Black Paint

0.5

-

-

... More
Yellow Colour Paint for Background

2

-

-

... More
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.

2

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

0.45

-

-

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.11

-

-

... More
WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

3

-

-

... More
11 KV V cross Arm (10.2 K.g. each )

3

-

-

... More
Top bracket 100x50X6 mm GI channel (2kg each)

3

-

-

... More
Danger Plate, 1 no's. for each pole

3

-

-

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.9

-

-

... More
GI barbed wire anticlimbing device 3 Kg. Per support

9

-

-

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

3.61

-

-

... More
11 KV pin insulator polymer, 3 Nos. required for each support

9

-

-

... More
Spike (GI ) (using 50x6mm Flat welded with 8 mm square bar) ( 2 Nos of spike per Set in each Pole )

6

-

-

... More
Non Metallic Ties 11KV (For covered conductor)

9

-

-

... More
Earthing of Support ( Coil Type )

3

-

-

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.79

-

-

... More
GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point)

4.35

-

-

... More
Black Paint

3

-

-

... More
Yellow Colour Paint for Background

6

-

-

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

1.35

-

-

... More
Couping ratio 1:1.5:3 with dimension (500X500X450)= 0.1125 Cu mtr

0.34

-

-

... More
Guarding Channel 75x40x4.8 mm, 7.14 KG/Mtr., each channel length 2.2 mtr., 4 no's channel required =( 4x7.14x2.2) ( For Single Pole)

62.83

-

-

... More
No-6 GI wire (0.192 kg/mtr.) for Main String

15.36

-

-

... More
No-8 GI wire (0.131 kg/mtr.) for lacing

3.28

-

-

... More
Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.)

4

-

-

... More
Gi Pipe Earthing 40mm. 3 Mtr. Long

2

-

-

... More
50x6mm GI Flat for earthing, 2.36kg/mtr., (10.7 mtr For raising)= 10.7x2.36

50.5

-

-

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

2

-

-

... More
Dismantling of 9 Mtr PSC Pole (11 KV)

4

-

-

... More
Dismantling of 16KVA 11/0.23KV pole mounted DT

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.