Works Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Works Department - EICCL Tender
Civil And Construction
Building Construction
Eprocure
Opening Date30 Jan 2023
Closing Date14 Feb 2023
Tender Amount₹ 72,73,260
Costs
EMD
₹ 72,732Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_EICCL_85673_1Bid Award Id
ViewTender No
89 of 2022/23Tender Authority
Works Department ViewPurchaser Address
-Website
http://https://www.worksodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Dismantling the old damged grading concrete the useful materials for reuse including cost of all labour,T&P required for the work etc complete
-
-
-
New Roof
284.32
-
108.3
Old Roof & Head room
407.48
-
113.7
Providing and applying water proofing treatment (Two component glass fibre reinforced specially formulated acrylic modifiedcementiouselastic coating system) using sika top seal -109 @ 2.50 kg/sqm & sika feb-1 or equivalent (glass fibre cloth) including all cost coveyance labour T&P etc complete
407.48
-
738.3
Carriage of surplus earth/debris staked at work site by mechanical means including loading and unloading and disposing the same within a lead of 5 km with hire running charges of all machineries, cost of all labour etc. complete. (Quantity same as item no-1,2 and (3*0.025))
23.67
-
151.2
Fly ash.bricks masonry in C.M (1:6) in Superstructure using fly ash bricks of 25cmx12cmx8cm size having crushing strength not less than 75kg / cm2 after immersing the bricks for six hours in water before use in and for ornamental flower beds. Plinth molding and similar such type of works with all necessary projections cutting moulding corbelling champhering, watering and curing including cost, conveyance, royalties and taxes of all materials and cost of all labour, sundries and T&P etc required for the work complete as directed by the Engineer in charge.
-
-
-
Third floor
87.52
-
5229
Fourth floor
11.9
-
5652.7
Fly ash.bricks masonry in C.M (1:4) in Superstructure using fly ash bricks of 25cmx12cmx8cm size having crushing strength not less than 75kg / cm2 after immersing the bricks for six hours in water before use in and for ornamental flower beds. Plinth molding and similar such type of works with all necessary projections cutting moulding corbelling champhering, watering and curing including cost, conveyance, royalties and taxes of all materials and cost of all labour, sundries and T&P etc required for the work complete as directed by the Engineer in charge.
3.78
-
5451.8
R.C.C work of M-25 grade using 12mm size black hard (crusher broken) granite chips of approval quality from approved quarry including hoisting lowering laying concrete & compacting concrete watering and curing for 28 days centring shuttering then after dismantling and removing the debris’s away from work site including cost conveyance royalties land taxes of all materials and cost of all labour sundries and T&P etc required for the work complete in all respect as directed by the Engineer in charge
-
-
-
column super structure
-
-
-
Third floor
6.05
-
16059
Fourth floor
3.4
-
18290.4
Lintel (third floor)
5.84
-
12054.4
Beam (third floor)
11.42
-
16059
Roof slab (third floor)
35.54
-
13167.4
Cutting straightening coiled or bent up M.S rods or Tor steel welding or jointing if necessary bending binding, tying the grills and laying in position as required for R.C.C works and hoisting lowering and placing in position in all floors according to approved designs and d r a wings including cost, conveyance taxes of M.S rods or tor steel and binding wires of 18 to 20 gauge required for the work and cost of all labour sundries, T&P etc complete in all respect as directed by the Engineer in charge (payment will be made according to the actual weight of M.S rod / Tor steel consumed in the work and no separate payment will be made towards weight of binding wires which is to borne by the contractor at his own cost)
-
-
-
Third Floor
-
-
-
Column up to Roof =15.13
-
-
-
Lintel (third floor) =8.76
-
-
-
Beam (third floor)=25.12
-
-
-
Roof Slab (third floor) =42.65
-
-
-
Total
91.66
-
10109.8
Fourth Floor
-
-
-
Column up to Roof
8.5
-
10138.6
16mm thick cement plaster in cement mortar (1:6) in all floors at all height finishing smooth to rough surface of brick walls after raking out the joints including watering and curing rounding of corners with cost conveyance, royalties and taxes of all materials and cost of all labour scaffolding sundries and T&P etc required for the work etc complete as directed by the Engineer in charge.
-
-
-
Third Floor
915.41
-
221.8
12mm thick cement plaster in cement mortar (1:6) in all floors at all height finishing smooth to smooth of brick walls after raking out the joints including watering and curing rounding of corners with cost, conveyance, royalties and taxes of all materials and cost of all labhour, scaffolding, sundries and T&P etc required for the work etc complete as directed by the Engineer in charge.
-
-
-
Third Floor
235.51
-
162.1
Fourth Floor
147.19
-
168.8
6mm thick cement plaster in cement mortar (1:4) RCC surface without punning in all floors at all height finishing smooth to smooth surface of brick walls after raking out the joints including watering and curing rounding of corners with cost conveyance royalties and taxes of all materials and cost of all labour, scaffolding sundries and / T&P etc required for the work etc, complete as directed by the Engineer in charge.
308.88
-
174.5
Supplying, fitting and fixing vitrified floor tile plain in floors of approved make laid on 20mm thick cement mortar (1:4) & filling the joints with white cement of approved quality including cost of all materials, takes labour T&P etc required for the work.
308.88
-
938.4
Supplying fitting fixing of vitrified tiles in dadoo skirting and risers of step on 12mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigment to match the shade of the tiles including rubbing and polishing with cost conveyance, royalty and taxes of all materials cost of all labour sundries & T&P etc required for the work complete as directed by the Engineer in charge.
45
-
1063.4
Providing and finishing to the wall surface with cement based Birla make putty after scraping and cleaning the surface by mechanical means and preparing the surface smooth including cost, conveyance and taxes of all materials and cost of all labour, scaffolding, sundries and T&P etc. required for the work complete as directed by the Engineer in charge.
1224.29
-
78.8
Painting two coat to interior wall surface with plastic emulsion paint of approved shade and quality over a coat of wall priming in all floors at all heights including preparing the surface with cost, conveyance and taxes of all materials and cost of all labour, scaffolding, sundries and T&P etc. required for the work complete as directed by the Engineer in charge. (Third Floor=Quantity Same as Sl no 14)
1224.29
-
154.7
Wall painting two coats with 100% Acrylic emulsion paint (1st quality weather coat) exterior grade of approved make & shade manufactured by reputed manufacturer like NEROLAC / ASSIAN / BERGER / DULUX or equivalent of approved shade to make an even finished surface in all floors and heights with all scaffolding and staging charges including cost, conveyance, taxes of all materials, cost of all labours, T & P, sundries etc. as required for the work complete in all respect as per the direction of the Engineer-in-Charge. ( Third Floor=Quantity same as sl no.10)
235.51
-
149.2
Out side wall
2593.89
-
152.7
Supplying and fitting fixing of un-plasticised Poly Vinylchloride (UPVC)(FENESTA/NCL/VEKA LTD) Ventilator/ with top hung fix -60 series duly manufactured using upvc reinforced profiles of 60 mm x 55mm x 2.5 mm for outer frame .75 mm x 60mm x 2.25 mm for casement window sash profile capable of mounting single glazing system .structurally reinforced with horizontal dip galvanised up to 50 microns of minimum thickness of 1.5 mm pre fabricated nd weided through fusion welding the door sash shall b fitted with 6 mm thick clear toughened glass of SAINT GOBAIN make duly fitted with EPDM weathering seal resistant accessories likeclipping locking system made of alluminium
1.44
-
7112.5
Supplying, fitting and fixing in position (5” x 3") size well dressed, well seasoned sal wood choukaths in all floors at all height including two coats of coaltaring to wall side faces and fixing the same including cost, conveyance and taxes of all materials and cost of all labour, sundries and T&P. etc. required for the work complete.
-
-
-
D1= 0.73 cum
-
-
-
D2 = 0.14 cum
-
-
-
Total
0.87
-
51437.5
Providing fiting fixing of 32mm thick flush door made out of 32mm thick BWR block board covered with 4mm thick veneer to both side with melamine polish with cost of all fixture and material labour etc complete
-
-
-
D1=32.20 sqm
-
-
-
D2 = 5.06 sqm
-
-
-
Total
37.26
-
15745
Supplying fitting fixing of MS Grill in windows made out of M.S. flat conforming to IS 2062 / 2006 painted with red oxide primer including screw as may be required etc with cost conveyance royalties and taxes of all materials and cost of all lab our sundries and T&P etc required floor lathes work complete in all respect as directed by the Engineer in charge.
-
-
-
W1 =41.25 sqm
-
-
-
W2 = 3.00 sqm
-
-
-
w1+w2= 44.25 sqm
-
-
-
Total
1327.5
-
58.3
Supplying and fitting fixing of un-plasticised Poly Vinylchloride (UPVC)(FENESTA/NCL/VEKA LTD)Casement Window with top fix -60 series duly manufactured using upvc reinforced profiles of 60 mm x 55mm x 2.5 mm for outer frame .75 mm x 60mm x 2.25mm for casement window sash profile and 74 mm x 60 mm x 2.5mm mullion profilr capable of mounting single glazing system .structurally reinforced with horizontal dip galvanised up to 50 microns of minimum thickness of 1.5 mm pre fabricated nd weided through fusion welding the door sash shall b fitted with 6 mm thick clear toughened glass of SAINT GOBAIN make duly fitted with EPDM weathering seal resistant accessories likeclipping locking system made of alluminium.
-
-
-
W1=41.25 sqm
-
-
-
W2 = 3.00 sqm
-
-
-
Total
44.25
-
7112.5
Painting two coats to wood and iron works with enamel paint over a coat of priming to new wood work of approved shade and quality including sand papering and preparing the surface smooth including cost conveyance and taxes of all materials land cost of all labour, scaffolding sundries land T&P etc required for the work complete as directed by the Engineer in charge. (Qnty same as 1/2 of item no20 + item no18)
117.83
-
220.76
2.5cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips.Qnty same as item No 3 (A+B)
691.8
-
457.3
E.I. Works
1
-
839222.25
P.H. Works
1
-
839222.25