Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Works Department - EICCL Tender

Water Storage And Supply
Eprocure
Opening Date1 Dec 2021
Closing Date10 Dec 2021
Tender Amount₹ 21,93,091 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Foundation

36.3

-

3869.19

... More
Sub-Structure

96.32

-

4563.39

... More
Providing and laying plain cement concrete (P.C.C.) M-20 grade using 4 cm & down graded size black hard cusher broken granite metal of approved quality from approved quarry including mixing, lowering, laying and compacting to proper thickness watering and curing for the required period including cost of all mateials, labour, conveyance, loading and unloading, taxes, cess, royalities, scaffolding, watering, curing, sundries, tools and plants etc. complete as the per direction of Engineer-in-charge .

59.4

-

4347.91

... More
Providing, lifting, hoisting and laying Reinforced cement concrete of M-30 grade including centering & shuttering as per approved designs and drawings having a minimum compressive strength (in work test) 20 N/mm2. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S.516 using 12mm to 20mm size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned (20mm size chips not to exceed 25%) to be mixed in concrete mixture including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding cost and conveyance of Tor steel and binding wires and labour charges for straightening, cutting, bending binding etc. of tor steel tying the grills and placing in proper position.

-

-

-

... More
Foundation & Raft

48.6

-

5021.93

... More
Sub-Structure & Wall

20.18

-

9916.34

... More
Providing, fixing and placing of approved Tor Steel (HYSD) Fe-500 for RCC work in all floors of required diameter of approved quality with straightening, Cutting, bending, binding welding or jointing if necessary, bending, binding, tying the grills as required for R.C.C. works, providing fan hooks where necessary and hoisting, lowering and placing in proper position according to approved designs and drawings including cost, conveyance, loading, unloading of M.S. rods or Tor steel and binding wires of 18 to 20 gauge required for the work and cost of all labour, sundries, T & P and scaffolding complete in all respect as directed by the Engineer-in-Charge

59.48

-

8926.14

... More
Rough stone dry packing in approns and revetments using 30cm and above size hard granite stone including cost of all mateials, labour, conveyance, loading and unloading, taxes, cess, royalities, scaffolding, tools and plants etc. complete as per approved drawing & technical specification and direction of Engineer-in-charge.

84

-

1432.06

... More
Grouting approns and revetments 23 cm deep with cement concrete (1:4:8) using 25mm size hard granite crusher broken coarse aggregates as per approved drawing and technical specification including watering, curring, cost, carriage, royality and taxes of all materials, cost of all labour, T&P etc. complete as per direction of Engineer-in-charge .

140

-

228.95

... More
Earthwork in embankment obtained from borrow pits by mechanical means as per approved drawing and technical specification as per clause 305 of MoSRT&H Specification for Road and Bridge works (4th revision) including dressing of sides and leveling the bed up to the required depth and depositing the excavated materials away from the work site with all leads and lifts, including shoring, shuttering and dewatering (if required) with cost of labour, hire & running charges of water pumps sundries & T&P required for the work complete as directed by the Engineer-in-charge.

962

-

132.38

... More
Dismantling and removing R.C.C. Columns, beams, slab, staircase, landing & lintels including stacking the useful materials for reuse and removing the debris within 50m lead including cost of all mateials , labour, conveyance, loading and unloading, taxes, cess, royalities, tools and plants etc. complete as the per direction of Engineer-in-charge.

13.5

-

1167.32

... More
Utilisation of 5HP water pump at work site for dewatering with all leads and lifts including cost of labour, fuel, hire & running charges of water pumps and T&P required for the work complete as directed by the Engineer-in-charge.

405

-

51.3



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.