Works Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Works Department Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date5 Nov 2024
Closing Date14 Nov 2024
Tender Amount₹ 36,35,010 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying, filling in foundation and plinth with sand in 22.5 cm (9") thick layers including watering and ramming with cost, conveyance, royalties, labour and labour cess with T&P required for the work etc complete as per the direction of the Engineer-in-charge.Building Proper-GF

68.77

759

52203.99

... More
Compound Wall

7.85

759

5959.01

... More
Cement concrete of proportion (1:3:6) in foundation and floors using 4 cm (1.5") size clean hard crusher broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15 cm (6") thick to required level ramming, watering, curing etc. complete including cost and conveyance of all materials with all royalties, labour, labour cess with T&P required for the work etc. complete including dewatering if required as per direction of the Engineer-in-charge.Building Proper-GF

26.12

5766

150633.52

... More
Compound Wall

3.24

5766

18685.02

... More
P.C.C. work of grade M20 having a minimum compressive strength work test of 200 Kg./cm. in 15 cm cubes at 28 days after mixing and tests conducted in accordance with IS 456 and IS 516 using 20 mm size downgraded (20 mm not to exceed 25%) hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting, lowering, laying and compacting concrete watering and curing for 4 weeks centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties of all materials, labour and labour cess with T&P required for the work etc. complete in all respect as per direction of the Engineer-in-charge.

3.46

5967

20649.21

... More
Fly ash brick masonry in cement mortar (1:6) after immersing bricks for six hours in water before use in foundation and plinth using fly ash bricks of 9" size having a crushing strength of not less than 75 Kg. per sq. cm including splays, cutting, circular mouldings, chamfering, corbelling and similar such type of works with all necessary projections, watering and curing etc. complete including cost and conveyance of all materials, labour and labour cess with T&P required for the work with all royalties etc. complete in all respect.Building Proper-GF

42.93

5544

238005.21

... More
Compound Wall

7.96

5544

44130.48

... More
R.C.C. work of grade M25 having a minimum compressive strength work test of 200 Kg./cm. in 15 cm cubes at 28 days after mixing and tests conducted in accordance with IS 456 and IS 516 using 20 mm size downgraded (20 mm not to exceed 25%) hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting, lowering, laying and compacting concrete watering and curing for 4 weeks centering, shuttering and finishing the exposed surfaces smooth with cost, conveyance, royalties of all materials, labour and labour cess with T&P required for the work etc. complete in all respect but excluding the cost and conveyance of M.S rods or Tor steel and binding wire of 18 to 20 gauge and labour charges for straightening, cutting, bending, binding etc of the M.S. Rods or Tor Steel and binding wire tying the grills and placing in proper position.Building Proper-GF Column Base

13.18

6737

88806.58

... More
Column

4

18259

73038.24

... More
Plinth Beam

7.16

7356

52674.33

... More
Lintel

2.74

14351

39321.77

... More
Roof Beam

9.89

18259

180587.05

... More
Roof Slab

17.51

13916

243681.77

... More
Stair Case

2.69

16799

45191.54

... More
Chajja

3.65

1228

4483.73

... More
Shelves

7.68

1179

9060.63

... More
Head Room Column S/S

1.74

19982

34769.27

... More
Chajja

0.81

1318

1067.73

... More
Roof Beam

1.54

19982

30772.8

... More
Roof Slab

2.25

14784

33265.1

... More
Lintel Band

0.53

15019

7960.58

... More
Compound Wall Column Base

8.21

6737

55318.82

... More
Plinth Beam

1.41

7356

10373.02

... More
Column

1.67

15881

26521.27

... More
Straightening bent up or coiled rods cutting, bending, cranking, hooking, welding or jointing (if required) the M.S. Rods or Tor steel and binding wires and binding, tying the grills, hoisting, lowering and placing in proper position as required for RCC works and for providing cost, conveyance of M.S. rod or Tor steel and binding wires of 18 to 20 gauge and labour, labour cess with T & P required for the work etc complete in all floors (Weight of binding wires and lapping & wastage of rod will not be considered for payment and payment will be made on weight of actual length of M.S. rods or Tor steel only.) Building Proper-GF

65.03

8579

557892.37

... More
Head Room

8.61

8611

74147.34

... More
Compound Wall

7.81

8579

67001.99

... More
Fly ash brick masonry in cement mortar (1:6) after immersing bricks for six hours in water before use in superstructure using fly ash bricks of 9" size having a crushing strength of not less than 75 Kg. per sq. cm including splays, cutting, circular mouldings, chamfering, corbelling and similar such type of works with all necessary projections, watering and curing etc. complete including cost and conveyance of all materials, labour and labour cess with T&P required for the work with all royalties etc. complete in all respect.Building Proper-GF

26.09

5577

145513.32

... More
Head Room

13.45

5948

80002.62

... More
Compound Wall

16.41

5577

91524.48

... More
Fly ash brick masonry in cement mortar (1:4) after immersing bricks for six hours in water before use in superstructure using fly ash bricks of 9" size having a crushing strength of not less than 75 Kg. per sq. cm including splays, cutting, circular mouldings, chamfering, corbelling and similar such type of works with all necessary projections, watering and curing etc. complete including cost and conveyance of all materials, labour and labour cess with T&P required for the work with all royalties etc. complete in all respect.Building Proper-GF

7.89

5810

45848.08

... More
12 mm thick cement plaster (1:6) finished smooth to outside brick walls after raking out the joint including watering and curing with cost and conveyance of all materials and labour, labour cess with T&P required for the work with all royalties etc. complete in all respect as per direction of the Engineer-in-charge. Building Proper-GF

201.23

188

38006.31

... More
Head Room

112.43

196

22093.62

... More
Compound Wall

77.9

188

14712.97

... More
16 mm thick cement plaster of proportion (1:6) finished smooth to inside brick work after racking out joints including watering and curing, cost, conveyance, royalities of all materials with all labour, labour cess and T&P required for the work etc complete in all respect as per direction of the Engineer-in-charge. Building Proper-GF

313.66

271

85296.7

... More
Head Room

33.85

278

9437.38

... More
Compound Wall

77.9

271

21184.13

... More
6 mm thick cement plaster (1:4) to RCC surfaces finished smooth including close deep chipping and slurry treatment including watering and curing with cost and conveyance of all materials and labour, labour cess with T&P required for the work with all royalties etc. complete in all respect as per direction of the Engineer-in-charge. Building Proper-GF

251.52

210

53022.93

... More
Head Room

25.75

216

5566.64

... More
Supplying of M.S. Window grill / M.S. Fixed Grill / M.S. grill gate made out of M.S. angle, M.S. flat & M.S. square etc including cutting, welding, all labour, labour cess and T&P etc complete as per direction of Engineer-in-charge. Building Proper-GF

459.9

62

28564.39

... More
Head Room

115.65

62

7183.02

... More
Compound Wall

340.2

62

21129.82

... More
Labour for fitting & fixing of M.S. window grills including cost of screws, labour, labour cess etc. complete as per direction of the Engineer-In-Charge. Building Proper-GF

15.33

94

1444.85

... More
Head Room

2.57

94

242.22

... More
Compound Wall

7.56

94

712.53

... More
Painting two coats with any approved synthetic enamel paint over a coat of priming to new iron work including cost of the primer and paint sand papering polishing the surface with cost conveyance of all materials, labour and labour cess with T&P required for the work etc complete in all respect as per direction of the Engineer-in-charge.Building Proper-GF

7.67

260

1999.26

... More
Head Room

1.29

267

344.83

... More
Compound Wall

3.78

260

985.29

... More
Supplying Fitting and fiixing in position well dressed and well seasoned sal wood work framed and fixed ( wrought and put up ) in choukaths for doors windows and ventilators including cost of iron of works and coal taring 2 coats wall side faces of Choukaths including cost of coaltar, cutting grooves and mending sizes where necessary wih cost and conveyance royalties and taxes of all materials, labour and labour cess with T&P required for the work etc. complete as per direction of the Engineer-in-charge. Building Proper-GF

0.23

104502

24035.55

... More
Painting two coats with any approved paint over a coat of priming to new wood work including cost of the primer and paint sand papering polishing the surface with cost conveyance of all materials, labour and labour cess with T&P required for the work etc complete in all respect as per direction of the Engineer-in-charge. Building Proper-GF

7.66

263

2018.1

... More
Supplying, fitting and fixing of 32mm thick flush door shutter with approved quality of 30mm thick BWR block board pasted with 1mm thick sunmica on both side of approved design and quality including cost of all door fittings and fixtures etc. complete. Building Proper-GF

11.38

10668

121408.78

... More
Supplying , fitting and fixing of two track UPVC sliding window of approved make with 6mm thick glass of approved quality complete with frame, shutters and all fitting and fixtures. Building Proper-GF

7.56

4960

37504.93

... More
Supplying and fitting fixing of Un-plasticised Poly vinyl chloride (UPVC) (FENESTA / NCL VEKA LTD) Ventilator / Top Hung – 60 series duly manufactured using UPVC reinforced profiles of 60 mm X 55mm X 2.5mm for outer frames. 75mm X 60mm X 2.25mm for casement window Sash Profile and 74mm X 60mm X 2.5mm mullion profile capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.5 mm prefabricated and welded through fusion welding the window, sash shall be fitted with 6mm thick toughened glass of SAINT – GOBAIN make duly fixed with EPDM weathering seal resistant accessories like clipping locking system made of aluminium 1 No. per set of sashes and the system is to be installed at the site using anchor fasteners , silicon rubber sealant, easy glazing/ deglazing at site etc. including cost and conveyance of all materials, accessories, labour charges, materials and product conforming to ASTM D 638-14, EN-477-95 and other applicable codes and standards. Building Proper-GF

1.08

7115

7684.2

... More
Providing & fixing of Granite Tiles above 0.40 sqm. of 20 mm thick in floors, treads or steps and landing on 25 mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with colouring pigments to match the sheds of the tiles including cost of Granite tiles, all materials, labour, labour cess, royality, conveyance, T&P etc. complete as directed by the Engineer-in-charge. Building Proper-GF

16.42

2906

47721.61

... More
Supplying, fitting and fixing of Vitrified tile in floors of size 600mm x 600mm of plain (Ivory) in approved make conforming to IS 13756 laid on 20mm thick cement mortar (1:4) (1cement:4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour, labour cess and T&P etc. required for the work all complete as per direction of the Engineer-in-charge. Building Proper-GF

81.08

1129

91604.99

... More
Supplying, fitting and fixing of Vitrified tile in dadoes of size 600mm x 600mm of plain (Ivory) in approved make conforming to IS 13756 laid on 12mm thick cement mortar (1:3) (1cement:3 course sand) and filling joints with white cement of approved quality including cost of all materials, labour, labour cess and T&P etc. required for the work all complete as per direction of the Engineer-in-charge. Building Proper-GF

22.82

1163

26562.02

... More
Supplying, fitting and fixing of Industrial Vitrified tile of premium grade having thickness 8mm to 10mm of size 300mm x 300mm of plain (Ivory) in approved make conforming to IS 4457 laid on 20mm thick cement mortar (1:4) (1 cement : 4 course sand) and filling joints with white cement of approved quality including cost of all materials, labour, labour cess and T&P etc. required for the work all complete as per direction of the Engineer-in-charge. Building Proper-GF

18.26

1045

19087.73

... More
Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scafolding staging charges with cost of all materials, labour, labour cess, T&P etc. complete as per direction of Engineer-in-Charge. Building Proper-GF

452.75

83

37922.34

... More
Head Room

172.03

85

14729.21

... More
Wall painting two coats to wall surface with any approved Plastic Emulsion paint of approved shade over a coat of water bound cement primer on new work to give an even shade after cleaning surface including cost of all materials, labour, labour cess, T&P required for the work etc complete as per direction of the Engineer-In-Charge. Building Proper-GF

557.05

184

102653.17

... More
Head Room

57.82

188

10884.62

... More
Wall Painting two coats with any approved weather coat paint of approved shade over a coat of water bound cement primer on new work to give an even shade after cleaning surface including cost of all materials, labour, labour cess, T&P required for the work etc complete as per direction of the Engineer-In-Charge. Building Proper-GF

209.36

176

36924.82

... More
Head Room

114.21

181

20759.95

... More
Compound Wall

155.8

176

27478.45

... More
Supplying, fitting, and fixing of Stainless steel of 304 grade in hand railing using 50 mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in staircase as per approved design and specification, buffing, polishing etc. with cost, conveyance of all materials, labour, labour cess T&P etc. required for the complete in all respect as per direction of the Engineer-in-charge. Building Proper-GF

152.86

297

45425.41

... More
2.5 cm thick grading concrete (1:2:2:) on roof slab with 6 mm size hard crusher broken granite chips including all cost, conveyance and royalties of materials with labour, labour cess and T&P required for the work etc. complete as per direction of Engineer-in-charge. Building Proper-GF

140.06

382

53515.53

... More
Head Room

18.03

420

7589.37

... More
Providing and laying of post construction Antitermite treatment by drilling 12mm dia holes at a distance of 30cm c/c junction of wall and floor about 300mm apart deep enough to reach the soil below and chemical emulsion (PRIMISE, IMIDAHLOPRIDE 30.5 SC OF BAYER MAKE MIXED WITH 475 LITRE WATER) pumped these holes to soak the soil @1 litre solution of each hole as per manufacturer specifications and the holes should pluged the filling materials including cost of all materials, labour, conveyance, T&P all taxes and hire charges of machinaries as per direction of Engineer-in-charge. Building Proper-GF

85

104

8882.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.