Works Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Works Department Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date6 Feb 2025
Closing Soon15 Feb 2025
Tender Amount₹ 14,62,300 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280)

3.96

117

465.26

... More
Double Pole Belting Channel 75X40X 4.8mm., 7.14KG/Mtr., each channel length 3.0 Mtr., 4 no's channel required =( 7.14x3x4)

23.7

102

2417.4

... More
50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle length 3.512 mtr., 4 nos angle required = (4.5x3.512x4)

24.04

102

2451.98

... More
Danger Plate, 2 no's.

2

128

257.88

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no's = (2x0.59x0.510)

0.6

117

70.71

... More
H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)

2

195

391.62

... More
H.T. Stay set (Complete )

2

1576

3153.16

... More
H.T. Stay Insulator Type-C

2

78

156.66

... More
7/10 SWG Stay Wire 15kg /stay

30

117

3524.7

... More
Gi Pipe Earthing 40mm. 3 Mtr. Long

1

1644

1644.83

... More
50x6mm GI Flat for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36

11.8

117

1386.38

... More
GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg)

6

125

751.92

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510)

2.41

117

282.82

... More
11 kv pin insulator polymer

3

313

939.9

... More
H W fitting(B&S) 70KN, 3Bolt

6

548

3289.68

... More
Disc insulator (B&S) 70 KN polymer

6

1801

10808.88

... More
wedge connector for 55 sq mm conductor

6

419

2514

... More
polycarbonate bird guard

9

20

188.64

... More
GI Nut , Bolt & Washer of different sizes (13.718 Kg each DP with AB switch)

12.26

122

1498.17

... More
Black Paint

1

344

344.63

... More
Yellow Colour Paint for Background

2

260

520.56

... More
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.

2

2301

4602

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

1.75

6500

11375

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.65

6648

4321.2

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

1

3784

3784

... More
11 KV Cut Point with 180 Degree Angle 9 mtr long 300 kg PSC pole

2

4620

9240

... More
psc pole clamp (GI )

4

108

435.2

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 2 no's channel required =( 2x9.56x1.2)

45.9

102

4681.8

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280)

10.6

102

1081.2

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 2 no's channel required =(2x9.56x0.306)

11.7

102

1193.4

... More
Danger Plate, 1 no's.

2

128

257.88

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

0.6

117

70.49

... More
GI barbed wire anticlimbing device 3 kg per support

6

125

751.92

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510)

2.41

117

283.15

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

1.75

6500

11375

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.55

6500

3575

... More
11 KV pin insulator polymer

6

313

1879.8

... More
H W fitting(B&S) 70KN, 3Bolt

12

548

6579.36

... More
Disc insulator (B&S) 70 KN polymer

12

1801

21617.76

... More
Earthing of Support ( Coil Type )

2

215

431.6

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.52

97

50.7

... More
GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole)

7.1

122

867.55

... More
Black Paint

1

286

286

... More
Yellow Colour Paint for Background

4

260

1040

... More
wedge connector for 55 sq mm conductor

6

419

2514

... More
polycarbonate bird guard

9

20

188.64

... More
11 KV cut point with 90 degree angle 9 mtr long 300 kg PSC pole

1

4620

4620

... More
psc pole clamp (GI )

2

108

217.6

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 2 no's channel required =( 2x9.56x1.2)

45.88

102

4679.76

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280)

10.57

117

1241.87

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 2 no's channel required =(2x9.56x0.306)

11.7

102

1193.4

... More
Danger Plate, 1 no's.

1

128

128.94

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

0.3

117

35.25

... More
GI barbed wire anticlimbing device 3 kg per support

3

125

375.96

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510)

1.2

117

140.99

... More
11 KV pin insulator polymer

4

313

1253.2

... More
H W fitting(B&S) 70KN, 3Bolt

9

548

4934.52

... More
Disc insulator (B&S) 70 KN polymer

9

1801

16213.32

... More
Earthing of Support ( Coil Type )

1

215

215.8

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.26

97

25.35

... More
wedge connector for 55 sq mm conductor

9

419

3771

... More
polycarbonate bird guard

13

20

272.48

... More
HT Stay clamp 50x8 mm flat (GI ) 3.14 kg /mtr , 0.551 mtr length , 2 nos qyt required

1

170

170

... More
HT Stay set complete

1

1428

1428

... More
HT stay insulator type -c

1

68

68

... More
7/10 SWG Stay Wire 15kg /stay

15

102

1530

... More
GI Nut , Bolt & Washer of different sizes (3.55 Kg each Cut Pole)

7.43

122

908.24

... More
Black Paint

1

286

286

... More
Yellow Colour Paint for Background

2

260

520

... More
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.

2

2301

4602

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

0.75

6648

4986

... More
11 KV pin point 9 mtr long 300 kg PSC pole

18

4620

83160

... More
psc pole clamp (GI )

18

108

1958.4

... More
11 KV V cross Arm (10.2 K.g. each )

18

1210

21780

... More
Top bracket 100x50X6 mm GI channel (2kg each)

18

240

4320

... More
Danger Plate, 1 no's. for each pole

18

128

2320.92

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

5.4

117

634.45

... More
GI barbed wire anticlimbing device 3 Kg. Per support

54

125

6767.28

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

22.62

117

2657.62

... More
11 KV pin insulator polymer, 3 Nos. required for each support

54

313

16918.2

... More
Earthing of Support ( Coil Type )

18

246

4429.98

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

4.86

97

473.85

... More
GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point)

26.1

122

3191.77

... More
55 mm2 AAAC

3.56

40800

145248

... More
Black Paint

36

344

12401.28

... More
Yellow Colour Paint for Background

60

260

15600

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

11.68

6500

75920

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

2.32

6500

15080

... More
polycarbonate bird guard

36

20

754.56

... More
Plinth mounted DSS 9 mtr long 300 kg PSC pole

2

4620

9240

... More
Top Channel GI 100x50x6mm (3000mm long) ( 9.56 kg/mtr, 2 nos) , each (2x3.000x9.56=57.36 kg)

57.36

106

6116.87

... More
Fish plate 50x6mm, 2.36 kg/mtr, each 0.280 mtr. Length, 6 nos. required =(6x2.36x0.280)

3.96

106

422.81

... More
AB Swith Mounting Channel 75x40x4.8mm , GI Channel (3000mm long) (7.14 kg/mtr , 2no's)(each 2x3.000x7.14=42.84k.g.)

42.84

106

4568.46

... More
AB Switch side support channel 100x50x6 mm, 9.56 kg/mtr , each channel length 0.35 mtr, 2 no's channel required =(9.56x2x0.35)

6.69

106

713.42

... More
Channel support for down pipe 75x40x4.8 mm, 7.14kg/mtr , each channel length 0.8 mtr, 1 no's channel required =7.14x0.8x1)

5.71

106

608.91

... More
HG/DO Fuse Mounting Channel 75x40x4.8 mm GI Channel (3000mm long) ( 7.14kg/mtr ,2 no's) (Each 2X3.000X7.14=42.84 KG)

42.84

106

4568.46

... More
Cantilever Support Channel 75x40x4.8 mm, GI Channel (810 mm long 2 no's ) (7.14kg/mtr, 2 no's) ( each 2x0.810x7.14=11.57kg)

11.57

106

1233.82

... More
Cantileve Support angle 50X50X6mm GI (1282 mm long)(4.5kg/mtr, 2 no's )(each 2x1.282x4.5=11.54k.g.)

11.54

106

1230.63

... More
Double Pole Belting Channel 75X40X 4.8mm., 7.14KG/Mtr., each channel length 3.0 Mtr., 2no's channel required =( 7.14x3x4)

42.84

106

4568.46

... More
50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle length 3.512 mtr., 4 nos angle required = (4.5x3.512x4)

31.61

106

3370.89

... More
50x6mm GI Flat for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 20.5x2.36

154.82

106

16510

... More
100 KVA , 11/0.4 KV (AL) Transforme BIS Energy level II

1

193901

193901.46

... More
LT Distribution box with MCCB, Alluminium busbar of single bay with kitkat fuse for 100KVA S/S

1

34697

34697.12

... More
55mm2 All Alloy Alluminium conductor -PVC insulated (50 mtr each Dtr)

0.05

67480

3374

... More
4CX150mm2 LT XLPE Cable (Armoured) for 100KVA Trf

15

882

13233

... More
AB Switch (11KV, 200A.3pole, 50HZ)

1

10450

10450.97

... More
H.G.Fuse (11KV, 200A, 3 Pole)

1

8701

8701.31

... More
wedge connector for 55 sq mm conductor

6

419

2514

... More
polycarbonate bird guard

6

20

125.76

... More
PG Clamp for 55sqmm AAAC

6

682

4095.06

... More
Disc insulator (B&S) 70 KN polymer

3

1635

4905.57

... More
H.W.Fitting (B&S) 70KN (3 Bolted)

3

497

1493.01

... More
Lightning Arrester (12KV10KA) Station class 2

3

5047

15143.25

... More
11 KV Pin insulator (Polymer)

3

284

853.14

... More
HT Stay set (complete)

2

1493

2986

... More
HT Stay clamp (1.95kg/pair)

2

177

355.48

... More
HT Stay insulator Type-C

2

71

142.2

... More
7/10 SWG Stay wire 15kg/stay

30

106

3199.2

... More
40mm Nominal bore GI pipe (medium gauge) earthing device with 3 mtr long

7

1493

10451

... More
GI Nuts & bolts of Assorted size (25 kg/DSS DP)

25

110

2772.75

... More
G.I Barbed wire anticlimbing device 3 Kg per support

6

113

682.5

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510)

2.4

117

281.98

... More
Danger plate , 11KV

2

113

227.5

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.6

117

70.49

... More
Name plate

1

113

113.75

... More
Yellow colour Paint for Background

2

312

625.64

... More
Black colour Paint for Background

1

312

312.82

... More
Concreting ratio 1:1:5:3 (500mmx500mmx1800mm)=0.450Cu.mtr

0.9

6648

5983.2

... More
Couping ratio 1:1:5:3 with dimension (500mmx500mmx450mm)=0.113Cu.mtr

0.52

5247

2717.95

... More
Fixing of stay set with 0.5 cum cement concrete foundation 1:3:6 size ( 900mm x 600mm x 900mm ) using 40mm BHG Metal with all labour and material except stay set , stay wire, stay insulator

2

2301

4602

... More
Construction of earthing chamber including Installation of Earth pit, Charcoal, Salt etc. including construction of earthing chamber (size 2'x2') and RCC Slab cover

7

3784

26488

... More
DTR Plinth

1

28000

28000

... More
Laying of 4 c x 150 mm2 LT XLPE cable

15

74

1110

... More
Supply & erection of GI Fencing with Gate

20

3682

73640

... More
Supply of AL lugs suitable for 150 sq mm cable / conductor crimping with cable and fixing / connecting include supply and erection of pvc tape as per voltage requirment

156.5

8

1252

... More
Supply and erection of double compression type glanding for armoured cable 3.5c / 4c 120-185 sq mm including making of hole in base plate and dressinbg of cable along with vermin proof properly supply to be done as per TPCODL spec and approved make dowells

920.61

3

2761.83

... More
4c x 150 sq mm armoured aluminium cable -XLPE insulated

803.39

10

8033.9

... More
Insulated piercing connector type -A main 50 to 150 sq mm and Tap -50 to 150 sq mm -for LT AB cable

113.08

4

452.32

... More
GI nut , bolt and washer of different sizes

106.08

-

26.52

... More
LT Line with , 9 Mtr. long 300 Kg. PSC Pole

25

4620

115500

... More
LT Stay set Complete

7

739

5175.66

... More
7/12 SWG GI stay wire, Grade -2

140

106

14929.6

... More
LT Stay insulator

7

42

298.55

... More
LT Accessories with Eye hook and Clamp Pole clamp for EYE hook for (XLPE Aerial bunched Cable)

25

284

7109.5

... More
EYE hook for XLPE Aerial bunched Cable (25-70 sq.mm)

25

85

2132.75

... More
Dead End Clamp suitable for messenger XLPE Aerial bunched Cable (25-70 sq.mm)

6

92

554.52

... More
Suspension Clamp with EYE hook for ABC (25-70 sq.mm)

25

483

12086

... More
3x50 + 1X35 mm2 (LT AB Cable)

140

202

28322

... More
Pipe Earthing (each 5th pole to earth)

9

1634

14706.09

... More
Coil Earthing

25

258

6458.23

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

10.55

116

1231.34

... More
Danger plate (LT)

25

124

3112.4

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

9.25

116

1079.61

... More
GI barbed wire anticlimbing device 3 Kg. Per support

75

124

9337.2

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

30.09

116

3511.95

... More
GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole)

12.5

121

1517.3

... More
Black Paint

10

342

3423.64

... More
Yellow Colour Paint for Background

20

342

6847.28

... More
Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.)

7

2301

16107

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr

11.1

6648

73792.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.