Works Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Works Department Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date21 Aug 2023
Closing Date31 Aug 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing compacted granular materials in shoulder by using moorum having required P.I value spreading in uniform layers not exceeding 100mm in depth Wtering and compacting with smooth wheeled roller to achieve the desired density including cost, conveyance, royalty of moorum & cost of all labour, machinery etc complete as per approved Drawing & Technical Specification and clause-408 of MoRT&H Specification for Road & Bridge works (5th Revision).

61.35

54800

893.25

... More
CC APPROACH ROAD Earth work Excavation in Foundation in hard Soil within an initial lift of 1.5m &initial lead of 50 mt & depositing the excavated materials in shoulder including dressing and levelling the surface & ordinary including cost of all labour, sundries, Tools & plants etc. complete as per direction of Engineer-in-charge.

57.57

11903

206.77

... More
Providing Sand , spreading in uniform layers , Watering and rolling including cost, conveyance, royalty of sand & cost of all labour, machinery etc. complete as per approved Drawing & Technical Specification and Section-2100 and Clause- 304 of MoRT&H Specification for Road & Bridge works (5th Revision).

23.74

13341

562

... More
Cement concrete of proportion (1:3:6) in foundation and floors using 4cm (3/2”) size clean hard black Crusher broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm (6”) thick to the required level, ramming, watering and curing etc. complete including cost and conveyance of all materials with royalties and all labour with T&P required for the work etc. complete including dewatering if required.

15.83

100142

6326.09

... More
Cement concrete of proportion (1:2:4) using 12mm size clean hard black crusher broken granite stone chips of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm (6”) thick to the required level ramming, watering and curing etc. complete including cost and conveyance of all materials with and royalties and all labour with T&P required for the work etc. complete including dewatering if required.

23.74

182138

7672.2

... More
Earth work in hard Soil within an initial lift of 1.5m including dressing the sides and levelling the bed & depositing the excavated materials away from the site within an initial lead of 50 M including cost of dewatering, cost of all labour, sundries, Tools & plants etc. complete as per direction of Engineer-in-charge.

39.53

6810

172.3



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.