Works Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Costs
EMD
₹ 2,520Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CERWI_107526_12Bid Award Id
ViewTender No
BI No.Tender Online SNPR-05 of 2024-25Tender Authority
Works Department ViewPurchaser Address
-Website
http://https://www.worksodisha.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
K.B. Brick masonry in cement mortar (1:6) in super structure with all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of EIC.
2.11
5959
12574.12
... More
Providing 16mm thick cement plaster (1:6) over the brick masonry walls including all cost of the materials,carriage ,royality, all taxes and all labour involved for completion of item of work as per the direction of Engineer -in charge.
16.72
265
4442.5
... More
Providing , fitting & fixing Steel Angle Iron doors & windows frame with M.S grill manufactured from standard rolled steel angle section 50 mm X 50 mm X 6 mm cornered of the frame duly metered and electrically welded with fish tail hold fasts made out of M.S flats of size 200 mm X 50 mm X 30 mm wide & 5 mm thick at the rate of 4 nos per frame with M.S hinges of size 75 mm & 14 SWG thick at the rate of 3 nos for each single leaf shutter tower bolt ring & M.S Grills made out of 19 mm x 5 mm flat properly welded to the window frame with one coat of anti corrosive red oxide zinc chrome primere as per direction of Engineer - in - Charge including 1 % cess
911.75
95
86616.25
... More
Supplying,fixing Vertified tiles in floors of size 600x600 mm treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1cement : 1sand) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of tiles.
21.74
1432
31134.64
... More
Supplying, fitting & fixing of window (sliding type made up alminum section) 151-154,151-155, as windows frame section No.151-155, 151-153 nad 151-167 as shutter framw with 5mm thcik black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials all taxes labour T & P etc complete as per direction of Enginner -in charge.
5.95
7916
47103.47
... More
Labour for fitting and fixing of M.S. grill door, window as per approved design etc complete as per direction of Engineer-in-charge.
14.65
70
1037.22
... More
Distempering two coats with any approved colour including cost of distemper and all labour etc.
193.74
86
16781.76
... More
Finishing walls with weather coat of approved shade on new work two coat over acoat of primer to give an even shade including cost of all materials, labour charges, T&P etc required for the work complete. . as per direction of the Engineer-in-charge.
240.87
81
19599.59
... More
Painting two coats over a coat of priming with approved paint including cost of paint on new Iron work with all cost of paint & primer etc.
77.14
255
19717.76
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements