Works Department Tender
Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.
Works Department Tender
Civil And Construction
Building Construction
Eprocure
Opening Date3 Dec 2024
Closing Date16 Dec 2024
Tender Amount₹ 9,37,937
Costs
EMD
₹ 9,400Document Cost
₹ 4,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_EICCL_107800_12Bid Award Id
ViewTender No
SE (RnB) KPD-II- 08 /2024-25Tender Authority
Works Department ViewPurchaser Address
-Website
http://tendersodisha.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Supplying, filling in foundation and plinth with sand including watering and ramming, poking & compacting including cost, conveyance, royalties, taxes of the materials and cost of all labour, labour cess, T&P etc. required for the work complete as directed by the Engineer-in-Charge.
3.86
941
3633.63
... More
Providing and laying Plain Cement Concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including the cost of all materials, cost of labour, conveyance, taxes, royalties, loading, unloading, curing, labour cess, T&P, etc. all complete as per the direction of Engineer-in-charge.
2.57
6718
17294.24
... More
Providing and laying RCC work of M-20 grade with 20mm and down grade black hard granite chips including mixing by concrete mixer, conveyance and hoisting, lowering, laying and compacting concrete by vibrator, levelling to proper specification including cost, conveyance, royalty, taxes of all materials incluing watering and curing etc. complete as per specification and direction of Engineer-in-Charge.
a. Footing
3.76
7274
27324.79
... More
b. Plith beam
2.06
8141
16730.27
... More
c. Column i. Ground Floor
3.11
18796
58362.98
... More
ii. First Floor
1.85
21294
39288.54
... More
d. Roof beam
i. Ground Floor
1.88
18796
35412.51
... More
ii. First Floor
1.02
21294
21677.9
... More
e. Lintel
0.42
16604
6973.86
... More
f. Chajja
3.9
1439
5612.33
... More
g. Staircase
2.28
16293
37100.28
... More
h. Roof slab
i. Ground Floor
1.96
14453
28300.25
... More
ii. First Floor
1.96
16083
31490.91
... More
Cutting, Straightening, coiled or bent up MS Rod of TOR steel using SAIL/RINL/TATA/JINDAL/SHYAM Steel including bending, binding,welding and joining if necessary and tying the grills and placing in position as required for RCC work and hoisting, lowering laying icluding cost, conveyance, taxes of MS rod or TOR steel and binding wire of 18 to 20 gauge and labour required for the work for bending,binding and tying the grills etc. complete.
28.79
8739
251588.22
... More
Providing and laying 25mm thick grading Concrete of proportion (1:2:2 ) using 6mm size crusher broken black hard granite chips from approved quarry, scraping and cleaning the surface, fininishing smooth to proper slope and gradient including cost of all materials, cost of labour, conveyance, taxes, loading, unloading, curing,T&P, etc. all complete as per the direction of the Engineer-in-charge.
15.66
439
6889.77
... More
Providing Fly-Ash Brick masonry work in F&P using Fly-Ash Bricks of size 250mm x 120mm x80mm having crushing strength not less than 75Kg/Sqcm in cement mortar (1:6) including the cost of all materials, cost of labour, conveyance, taxes, loading, unloading, royalties, labour cess, scaffolding, curing for required period, T&P, etc. all complete as per the direction of the Engineer-in-charge.
1.65
5534
9154.74
... More
Providing Fly-Ash Brick masonry work in Superstructure using Fly-Ash Bricks of size 250mm x 120mm x80mm having crushing strength not less than 75Kg/Sqcm in cement mortar (1:6) including the cost of all materials, cost of labour, conveyance, taxes, loading, unloading, royalties, labour cess, scaffolding, curing for required period, T&P, etc. all complete as per the direction of the Engineer-in-charge.
i. Ground Floor
2.04
5568
11370.35
... More
ii. First Floor
0.62
5939
3688.13
... More
Providing 6mm thick cement plaster in cement mortar of (1:4) to RCC surface including roughening, scraping, cleaning and finished smooth including the cost of all materials, cost of labour, conveyance, loading and unloading, all taxes and royalties, scaffolding, watering and curing , sundries, T&P etc. complete as per direction of the Engineer-in-charge.
i. Ground Floor
49.76
211
10532.7
... More
ii. First Floor
27.3
217
5925.19
... More
Providing 12 mm thick cement plaster in cement mortar (1:6) including racking out joints, scraping and cleaning the surface and finishing the plastered surface smooth using wooden floats with proper plumbs and level including the cost of all materials, labour, conveyance, taxes, loading and unloading, labour cess, royalties, scaffolding, watering and curing, T&P etc. complete as per direction of the Engineer-in-charge.
i. Ground Floor
24.17
191
4617.21
... More
ii. First Floor
29.22
198
5806.51
... More
Providing 16 mm thick cement plaster in cement mortar (1:6) including racking out joints, scraping and cleaning the surface and finishing the plastered surface smooth using wooden floats with proper plumbs and level including the cost of all materials, labour, conveyance, taxes, loading and unloading, labour cess, royalties, scaffolding, watering and curing, T&P etc. complete as per direction of the Engineer-in-charge.
i. Ground Floor
12.41
274
3406.29
... More
ii. First Floor
0.3
281
83.31
... More
Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90 mtr. C/C and stainless square pipe bracing of size 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost, conveyance, taxes of all materials, labour, T&P etc. complete.
73.29
342
25106.96
... More
Supplying, fitting and fixing of G.I.doors/windows/grill gate made out of square bars, angle, channel, flat, plate, Hollow Pipes, etc painted with red oxide primer cost of all materials, labour, conveyance, taxes, loading, unloading, T&P, etc. all complete.
827.55
79
65657.82
... More
Supplying , fitting and fixing of two track UPVC sliding window of approved make with 6mm thick glass of approved quality complete with frame, shutters and all fitting and fixtures.
12.96
4960
64294.17
... More
Supplying, fitting and fixing of G.I. grills in windows made out of G.I. square bars, angles, flats, etc painted with red oxide primer cost of all materials, labour, conveyance, taxes, loading, unloading, T&P, etc. all complete.
324
77
25122.96
... More
Supplying, fabricating and fixing structural steel work using GI circular /square /rectangular hollow pipes of approved make and quality confirming to IS 4923 including cutting, hoisting and fixing in position including cost, conveyance, taxes of materials, labour, T&P, etc. complete.
62.88
118
7450.69
... More
Supplying, fitting & fixing of 0.45mm thick pre-painted Al-Zn colour coated iron profile sheet of approved make (Tata blue scope / JSW coloron / Bhusan / Equivalent) in roof with drilling hole in wind ties including fixing of ridges, valleys, etc. including cost of hardware fittings, cost of all materials, labour, conveyance, taxes, loading, unloading, lapping, T&P, etc. all complete.
13.25
857
11366.38
... More
Supplying, fitting and fixing Vitrified industrial floor tiles of appoved make and size (300mm x 300mm) confirming to IS:4457 laid on 20mm thick cement mortar (1:4) (1 cement : 4 Course Sand) and filling joints with white cement of approved quality including cost, conveyance, taxes, cost of all labour, labour cess, etc. as per the direction of Engineer-in-Charge..
14.34
1052
15092.85
... More
Supplying, fitting and fixing Vitrified Tile in floors of size 600mm x 600mm (Plain/Ivory) of approved make confirming to IS:13755 laid on 20mm thick cement mortar (1:4) (1 cement : 4 Course Sand) and filling joints with white cement of approved quality including cost, conveyance, taxes, cost of all labour, labour cess, etc. as per the direction of Engineer-in-Charge.
i. Ground Floor
9.48
1141
10817.99
... More
ii. First Floor
11.34
1155
13097.7
... More
Supplying, fitting and fixing of Vitrified tiles (Plain/Ivory) in dados, skirting and risers of steps over 12mm thick cement mortar (1:3) jointed with neat cement slurry mixed with colouring pigments to match the colour and shade including the cost of washing, polishing, cost of materials, cost of all labour, conveyance, taxes, loading & unloading, T&P, watering and curing etc. complete. i. Ground Floor
1.81
1273
2300.75
... More
ii. First Floor
2.25
1293
2909.48
... More
Finishing the wall surface with Acrylic wall putty (water based) of approved make and finishing smooth even surface to receive painting including cost of all T&P and materials etc complete and as per specification and direction of the Engineer-in-Charge.
i. Ground Floor
37.15
89
3337.75
... More
ii. First Floor
9.75
91
893.81
... More
Priming over the plastered surface with one coat of water bound cement primer of approved quality and make including the cost of all materials, labour, conveyance, taxes, loading, unloading, scaffolding, T&P, etc. all complete as per the direction of Engineer-in-charge.
i. Ground Floor
102.07
81
8302.62
... More
ii. First Floor
54.57
83
4545.98
... More
Providing & Painting with two coats of plastic emulsion paint of approved quality, make and shade to give an even surface including the cost of all materials, labour, conveyance, taxes, loading, unloading, scaffolding, T&P, etc. all complete as per the direction of Engineer-in-charge.
i. Ground Floor
37.15
107
3996.38
... More
ii. First Floor
9.75
109
1069.33
... More
Providing & Painting with two coats of weather Coat of approved quality, make and shade to give an even surface including the cost of all materials, labour, conveyance, taxes, loading, unloading, scaffolding, T&P, etc. all complete as per the direction of Engineer-in-charge.
i. Ground Floor
64.93
99
6436.67
... More
ii. First Floor
44.82
102
4603.57
... More
Providing and painting two coats of synthetic enamel paint over one coat of primer with enamel paint of approved quality, make and shade including the cost of sand papering, surface polishing, cost of all materials, cost of labour, conveyance, taxes, loading, unloading, scaffolding, T&P, etc. as per direction of engineer-in-charge.
i. Ground Floor
22.38
256
5730.62
... More
ii. First Floor
10.89
262
2860.91
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements