Works Department Tender

Search from a pool of business opportunities related to Odisha tenders on the online platform of BidAssist. Be it an Odisha PWD tender or a civil aviation tender, one can find every tender Odisha government, as well as PSUs and other organizations, post online. Every tender, active or achieved, is sourced from the eProcurement Odisha website and thus carries full credibility.

Works Department - EICCL Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date17 Feb 2024
Closing DateCancelled
Tender Amount₹ 19,35,847 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
LT stay Clamp ( 1.40Kg/pair)

8

1378

172.32

... More
LT Stay insulator

8

375

47

... More
LT Accessories with Eye hook and Clamp Pole clamp for EYE hook for (XLPE Aerial bunched Cable)

26

8145

313.3

... More
EYE hook for XLPE Aerial bunched Cable

16

1503

93.99

... More
Dead End Clamp suitable for messenger XLPE Aerial bunched Cable

16

1629

101.82

... More
Suspension Clamp with EYE hook for ABC

10

5326

532.61

... More
3x95+ 1x70+ 1 x16 mm2 (LT AB Cable)

660

251235

380.66

... More
3x50 + 1x35+1x16mm2 (LT AB Cable)

310

67986

219.31

... More
Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm

5

681

136.26

... More
GI Pipe Earthing (each 5th pole to earth)

4

6579

1644.83

... More
Coil Earthing

14

3640

260.04

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

4.72

554

117.49

... More
Danger plate (LT)

18

2255

125.32

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

5.42

636

117.49

... More
GI barbed wire anticlimbing device 3 Kg. Per support

54

6767

125.32

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

21.66

2545

117.49

... More
GI Nut , Bolt & Washer of different sizes (0.5 Kg/ Pole)

9

1099

122.19

... More
Black Paint

18

6203

344.63

... More
Yellow Colour Paint for Background

36

9370

260.28

... More
Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.)

8

18000

2250

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1500mm) = 0.375Cu.mtr

6.75

43875

6500

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

4

14800

3700

... More
Cut Point -3 nos. , Pin point 14 Nos, line DP (without AB swich) - 1 no, 11 KV line Length - 0.9 Km. DP without AB swi WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

2

68516

34258.46

... More
Top Channel 100X50X6mm, 9.56 KG/Mtr., each channel length 2.3 mtr., 2 no's channel required =( 2x9.56x2.3)

43.98

4027

91.58

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280)

3.96

465

117.49

... More
Double Pole Belting Channel 75X40X 4.8mm., 7.14KG/Mtr., each channel length 1.66 Mtr., 4 no's channel required =( 7.14x1.66x4)

47.41

4341

91.58

... More
50x50x6mm.GI Bracing Angle, 4.5Kg./mtr., each angle length 2.671 mtr., 4 nos angle required = (4.5x2.671x4)

48.08

4402

91.58

... More
Danger Plate, 2 no's.

2

250

125.32

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 2 no's = (2x0.59x0.510)

0.6

70

117.49

... More
H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)

2

391

195.81

... More
H.T. Stay set (Complete )

2

3289

1644.83

... More
H.T. Stay Insulator Type-C

2

156

78.33

... More
7/10 SWG Stay Wire 15kg /stay

30

3524

117.49

... More
Gi Pipe Earthing 40mm. 3 Mtr. Long

1

1644

1644.83

... More
50x6mm GI Flat for earthing, 2.36kg/mtr., (2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 5x2.36

11.8

1386

117.49

... More
GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg)

6

751

125.32

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 8 no's = (8x0.59x0.510)

2.41

282

117.49

... More
11 KV pin insulator polymer

3

939

313.3

... More
H W fitting(B&S) 70KN, 3Bolt

6

3289

548.28

... More
Disc insulator (B&S) 70 KN polymer

6

10808

1801.48

... More
PG Clamp for 80 sq.mm AAA conductor

6

4981

830.25

... More
GI Nut , Bolt & Washer of different sizes (12.261 Kg each DP without AB Switch)

12.26

1498

122.19

... More
Black Paint

1

344

344.63

... More
Yellow Colour Paint for Background

2

520

260.28

... More
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.

2

4500

2250

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

0.9

5850

6500

... More
Couping ratio 1:1.5:3 with dimension (500X500X450)= 0.1125 Cu mtr

0.23

1462

6500

... More
Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of GI flat around pipe .

1

3700

3700

... More
11 KV Cut Point with 90 Degree Angle WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

3

102775

34258.46

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 1.2 mtr., 4 no's channel required =( 4x9.56x1.2)

137.66

12607

91.58

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280)

31.72

3726

117.49

... More
Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each channel length 0.306 mtr., 4 no's channel required =( 4x9.56x0.306)

35.1

3214

91.58

... More
Danger Plate, 1 no's.

3

375

125.32

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.9

106

117.49

... More
GI barbed wire anticlimbing device 3 Kg. Per support

9

1127

125.32

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

3.61

424

117.49

... More
11 KV pin insulator polymer

12

3759

313.3

... More
H W fitting(B&S) 70KN, 3Bolt

18

9868

548.28

... More
Disc insulator (B&S) 70 KN polymer

18

32426

1801.48

... More
Earthing of Support ( Coil Type )

3

780

260.04

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.79

92

117.49

... More
PG Clamp for 80 sq.mm AAA conductor

18

14944

830.25

... More
H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)

6

1174

195.81

... More
H.T. Stay set (Complete )

6

9868

1644.83

... More
H.T. Stay Insulator Type-C

6

469

78.33

... More
7/10 SWG Stay Wire 15kg /stay

90

10573

117.49

... More
GI Nut , Bolt & Washer of different sizes (7.433 Kg each Cut Pole)

22.3

2724

122.19

... More
Black Paint

1.5

516

344.63

... More
Yellow Colour Paint for Background

6

1561

260.28

... More
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.

6

13500

2250

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

1.35

8775

6500

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

0.34

2193

6500

... More
11 KV Pin Points With WPB WPB (GI) Pole 160x152 (11Mtr. Long, 30.44KG/Mtr.)

14

479618

34258.46

... More
11 KV V cross Arm (10.2 K.g. each )

14

17764

1268.87

... More
Top bracket 100x50X6 mm GI channel (2kg each)

14

3289

234.98

... More
Danger Plate, 1 no's. for each pole

14

1754

125.32

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

4.21

494

117.49

... More
GI barbed wire anticlimbing device 3 Kg. Per support

42

5263

125.32

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

16.85

1979

117.49

... More
11 KV pin insulator polymer, 3 Nos. required for each support

42

13158

313.3

... More
Earthing of Support ( Coil Type )

14

3640

260.04

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

3.67

430

117.49

... More
GI Nut , Bolt & Washer of different sizes (1.45 Kg/ Pin Point)

20.3

2480

122.19

... More
80 mm2 AAAC

1.74

117205

67359.5

... More
55 mm2 AAAC

0.96

45115

46995

... More
Black Paint

14

4824

344.63

... More
Yellow Colour Paint for Background

28

7287

260.28

... More
Concreting ratio 1:1.5:3 (500mmX500mmX1800mm) = 0.45Cu.mtr

6.3

40950

6500

... More
Couping ratio 1:1.5:3 with dimension ( 500X500X450)= 0.1125 Cu mtr

1.58

10237

6500

... More
Shifting of 33 KV line pole - 1 No WPB (GI) Pole 160x152 (13Mtr. Long, 30.44KG/Mtr.)

1

39641

39641.91

... More
Straight Cross Arm Channel 100 x 50 x 6 mm, 9.56 KG/mtr, each channel length 1.7 Mtr., 4 No's of Channel = (4x 9.56x1.7)

65.01

5953

91.58

... More
Fish Plate 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 16 no's required = (16x2.36x0.280)

10.57

1242

117.49

... More
Straight Cross Arm Top Channel 100 x 50 x 6 mm, 9.56 KG/mtr, each channel length 0.306 Mtr., 4 No's of Channel = (4x 9.56x0.306)

11.7

1071

91.58

... More
Danger Plate, 1 no's.

1

125

125.32

... More
Back Clamp for danger Plate 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 1 no's = (1x0.59x0.510)

0.3

35

117.49

... More
GI barbed wire anticlimbing device 3 Kg. Per support

3

375

125.32

... More
Back Clamp for anticlimbing device 25X3 mm. flat, 0.59Kg/Mtr. Flat of 0.510mtr length 4 no's = (4x0.59x0.510)

1.2

141

117.49

... More
33KV pin insulator polymer (4 No's each 90 Deg. Cut point)

4

3007

751.92

... More
H W fitting(B&S)90KN,4 Bolt

6

4699

783.25

... More
Disc insulator (B&S)90 KN polymer

6

10808

1801.48

... More
Earthing of Support ( Coil Type )

1

260

260.04

... More
No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing

0.26

30

117.49

... More
PG Clamp for 100 sq.mm AAA conductor

6

5451

908.57

... More
H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.511 Mtr. Length, 2 no's qty. required ( 1 Pair)

1

195

195.81

... More
H.T. Stay set (Complete )

1

1644

1644.83

... More
H.T. Stay Insulator Type-C (2 No's.)

1

78

78.33

... More
7/8 SWG Stay Wire 15kg /stay

15

1762

117.49

... More
GI Nut , Bolt & Washer of different sizes (11.31 Kg each 90 deg. Cut point)

11.31

1381

122.19

... More
Black Paint

1

344

344.63

... More
Yellow Colour Paint for Background

2

520

260.28

... More
Concreting ratio 1:1.5:3 (500mmX500mmX2200mm) = 0.55Cu.mtr

0.55

3575

6500

... More
Couping ratio 1:1.5:3 with dimension (500X500X450)= 0.1125 Cu mtr

0.11

731

6500

... More
Fixing of 33KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.)

1

2250

2250

... More
Guarding at road crossing - 4 Span Top Channel 75x40x4.8 mm, 7.14 KG/Mtr., each channel length 1.5 mtr., 4 no's channel required =( 4x7.14x1.5)

171.36

19203

112.07

... More
No-6 GI wire (0.192 kg/mtr.) for Main String

184.32

20655

112.07

... More
No-8 GI wire (0.131 kg/mtr.) for lacing

31.44

3523

112.07

... More
Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.)

32

2868

89.65

... More
Gi Pipe Earthing 40mm. 3 Mtr. Long

8

12551

1568.91

... More
H.T. Stay clamp, 50x8 mm. flat, 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair)

2

373

186.78

... More
H.T. Stay set (Complete )

2

3137

1568.91

... More
H.T. Stay Insulator Type-C

2

149

74.71

... More
7/10 SWG Stay Wire 15kg /stay

30

3361

112.07

... More
50x6mm GI Flat for earthing, 2.36kg/mtr., (2.5 mtr. For mesh formation and 2.5 mtr. For raising)= 5x2.36

94.4

10578

112.07

... More
Installation of Earth Pit, Charcoal, Salt etc. including construction of earthing chamber (Size: 2'x2') and RCC slab cover

8

19256

2407

... More
Fixing of complete 11KV line Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard.

2

4500

2250

... More
Dismantling of RS Joist poles

4

5400

1350

... More
Dismantling of PSC Poles

30

27000

900

... More
Dismantling of Conductor

900

8100

9

... More
Dismantling of LT ABC with Accessories

950

21375

22.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.